Loading…
Loading…
10,772 results • Best match
Water supply pipe laying Supplying and fixing 1000L water storage tank Aluminium work for doors and windows Aluminium grill work
DEPOSIT URBAN AGGLOMERATION TVM CORPORATION 2021 22 PHASE 1 ATTUKAL WARD PIPE LAYING AT VARIOUS PLACES UNDER WW SECTION KURIATHY
GENERAL-Construction of E block in Govt.College,Karyavattom-composite work-Construction of New Building Including electrical pipe laying, Electronics works
OandM - Water Supply Schemes-Annual maintenance -2023-24 -JICA assisted water supply scheme to cherthala municipality and adjoining villages- Leak rectification works at various locations in Thycattussery Panchayat- Pipeline Work
State Plan-Drought- CWSS To Methala, Eriyad, Edavilangu and Kadukutty Panchayats- Replacement of 10Yrs old 20HP pumpset with 25HP IE3 pumpset for pumping to OHSR Kurinjippuram in Kurinjippuram Pumphouse.-Pipeline Work
State Plan 2022-23-INNOVATIVE TECHNOLOGIES AND MODERN MANAGEMENT PRACTICES-Providing and Fixing cast steel gear operated sluice and check valves in the CW pumping discharge headers at Naripparamba- Pipeline Work
Jal Jeevan Mission-2022-23 Koipuram Grama Panchayath- Urgent Replacing of old and Damaged AC Pipe with DI Pipe-From Muttumon Junction to Near CSB Kumbanad along TK Road -Pipeline Work
OandM - Water Supply Schemes-RMC - CARWSS to Kozhinjampara and Adjoining Villages- Repair works of various size of pipe lines in Eruthenpathy and Vadakarapathy Panchayaths for the year 2023-24-Pipeline Work
AMRUT-AMRUT 2.0 - PALAKKAD MUNICIPALITY-REPLACING OLD AC or GI PIPES AND PROVIDING PARALLEL DISTRIBUTION LINES - IN WARDS - 48, 49, 50, 51, 52 and 1 - REACH 1 - Part -16- Pipeline Work
O and M Water Supply SchemesAMCCWSS to Palakkad Muncipality ward 21 to 30 Repair of Various pipe lines and allied works for the year 2025 2026 AMC 21 to30 Pipeline Work
DEPOSIT CSME Laying 63mm PVC pipe for providing water connection to Crystal Empire flat at Panorama residency road Kumaranassan nagar Road in Kochi Corporation Div 54 (old Div 37) Pipeline Work
DEPOSIT KDP 2021 22 Block Panchayathu Elanthoor Division Extension of Pipeline towards Kottaram ambalam to Karikkalam kuzhipadi in ward no 2 Parayanali community Centre to pallam road in Omallor Grama Panchayathu
DEPOSIT-DW/CSME/AGD-Providing water supply arrangements to Sri.Anil Mathew Mangalassery and two others by laying 63mm PVC pipe in Madanbi Govt. High school Road in Alangad Panchayath-Pipeline Work
Deposit work - Sreekrishnapuram Block Panchayath-Pipeline Extension work at Thekkinkadu colony water connection at Mekkottu colony, Thekkinkadu colony, Vakkada Colony, Vadakkekkara colony and Madathil colony in ward No. 7,4,3 and 13
AMRUT 2 Cherthala Municipality Supply and laying 90 mm PVC pipe providing balance FHTC 500 Nos and replacing damaged AC line and allied works in Cherthala Municipality Phase 3 Pipeline Work
Deposit work of Thvpm Corporation - Vivekananda Nagar-Improving water supply by replacing the very old and frequently bursting 80mm dia AC pipeline with new 90mm dia in Vivekananda Nagar Nalanchira ward
DAWSS TO Edappal and adjoining panchayaths - ZONE ILeak rectification works in Tavanur, Kaladi and Vattamkulam panchayaths (Area of water supply served from OHSR Thavanur) FOR THE YEAR 2024-25-Pipeline Work
DEPOSIT-Deposit work- Peruvanthanam grama panchayath annual Plan 2021-2022. project no 105-22- Chuzhuppu nediyoram-Peruvanthanam grama panchayath annual Plan 2021-2022 project no 105-22- Chuzhuppu nediyoram Pipeline Work
DEPOSIT Ranni Block Panchayath KDP 2025 26 Project No 5726 RWSS to Kurumbanmoozhy and Kollamula Pipeline extension in Semithery Padi Punjab Colony Road and Kurumbanmoozhy DCL Padi Panachi Road of Vechuchira
DEPOSIT Supplying Laying Supplying and laying of 63mm PVC distribution main for a length of 140m along Link Park 6th Cross Road in Div 45 old of Kochi Corporation Pipeline Work
AMRUT-AMRUT-2.0 - PALAKKAD MUNICIPALITY-REPLACING OLD AC or GI PIPES AND PROVIDING PARALLEL DISTRIBUTION LINES - IN WARDS - 48, 49, 50, 51, 52 and 1 - REACH 2 - Part 15- Pipeline Work
O and M Water Supply Schemes Annual maintenance of RWSS to Kuttoor and NRDWP NC PC RWSS to Kuttoor Grama Panchayat for the year 2024 25 Pipeline work under Nedumpuram section
Jal Jeevan Mission JJM WSS to Vengola Rayamangalam Panchayaths Construction of Seven Lakhs and Fourty Litres capacity OH Tank at Peechnamugal and Providing CWPM from Kanjirakad WTP to Peechnamugal Pipeline Work
AMRUT-AMRUT 2.0 - PALAKKAD MUNICIPALITY-REPLACING OLD AC or GI PIPES AND PROVIDING PARALLEL DISTRIBUTION LINES - IN WARDS 42, 43, 44, 45, 46 and 47 - REACH 3 - Part 11- Pipeline Work
Setting Up of Sports Complex at DHQ Kasaragod- Construction of Drainage and Rainwater Harvesting pit with Pipeline, providing movable Football Goalpost and Fixing of Nameboard for Football Turf at DHQ Kasaragod
Water Supply Schemes-Anual maintenance of water supply system in Edathua panchayat- RWSS to Edathua -Anual maintenance of water supply system in Edathua panchayat for the year 2023-24-Pipeline Work
AMRUT-AMRUT-2.0 - PALAKKAD MUNICIPALITY-REPLACING OLD AC or GI PIPES AND PROVIDING PARALLEL DISTRIBUTION LINES - IN WARDS - 48, 49, 50, 51, 52 AND 1 - REACH 3 - Part 17 - Pipeline Work
MLA SDF 2020 21 Sri K Raju MLA Punalur Municipality Extension of pipeline from Pampadi to Kochuvattamon lower area Kochuvattamon higher area Kooppumpuram Junction in ward No 5 of Karavaloor GP
District Panchayath Deposit work 2021-22- CARWSS to Moorkanad and adjoining villages - Pipeline extension to Padapparambu lakshamveedu colony road, Padapparambu Thadamparambu road in Kuruva Panchayath and Melekalavu Melechal in Makkaraparambu Panchay
Jal Jeevan Mission (JJM) Providing balance household tap connection in Nadapuram,Tuneri,Valayam and Vanimel GPs Zone 2 Valayam GP Providing house hold tap connection Ward 8 to 14 Pipeline Work
AMRUT-AMRUT 2.0 - PALAKKAD MUNICIPALITY-REPLACING OLD AC or GI PIPES AND PROVIDING PARALLEL DISTRIBUTION LINES - IN WARDS 42, 43, 44, 45, 46 and 47 - REACH 2 - Part 10- Pipeline Work
JJM-CWSS TO WANDOOR TUVVUR KALIKAVU KARUVARAKUNDU AND EDAPPATTA GPS IN MALAPPURAM DISTRICT-Package VI - Construction of 14LL GLSR Providing FHTC Laying Pumping and distribution network in Edappatta GP-Pipeline Work
OANDM Water Supply Schemes JNNURM WSS to Kochi City Part I AMC of WSS to Maradu Municipality West side of NH 47 NH 66AI for the year 2024 25 Pipeline Work
O and M Water Supply SchemesMaintenance of WSSDn Nedumangadu Running maintenance contract of RWSS to Aruvikkara for the year 2025 26 Leak Rectification works of Pipes of various sizes Pipeline Work
OandM Water Supply Schemes Annual Maintenance Water Supply distribution network of Right side of Thiruvallam Pachalloor Kovalam and Muttacaud area under WW Section Vandithadam for the year 2025 26 Pipeline Work
AMRUT-AMRUT 2.0 - PALAKKAD MUNICIPALITY-REPLACING OLD AC or GI PIPES AND PROVIDING PARALLEL DISTRIBUTION LINES - IN WARDS 42, 43, 44, 45, 46 and 47 - REACH 5 - Part 13- Pipeline Work
Jal Jeevan Mission JJM-5th SLSSC- Water Supply Scheme to Nadathara Grama Panchayath in Thrissur District- Providing and Laying Distribution lines and 654 FHTCs to Nadathara Zone-Package I-Pipeline Work
JJM-CWSS to Karulai, Amarambalam, Moothedam and Chokkad at Package II - Construction of 37 LL OHSR at Arakkumpoyilkuunu, Supplying and Laying of DI Pipes of Various dia Transmission mains. -Pipeline Work
Jal Jeevan Mission -2022-23 Koipuram Grama Panchayath- Urgent Replacing of old and Damaged AC Pipe with DI Pipe-Near CSB Muttumon to ICCI Bank ,Kumbanad along TK Road -Pipeline Work
Jal Jeevan Mission JJM WATER SUPPLY SCHEME TO UDAYAMPEROOR GRAMA PANCHAYATH IN ERNAKULAM DISTRICT Pump house Extension Laying pumping mains Construction of OHSR laying distribution lines and Providing FHTC Pipeline Work
AMRUT 2.0 Shornur Municipality Pipeline replacement or extension of various size pipes and providing 2290 FHTCs phase1 Additional Works Providing 150 FHTCs and 20 MLD capacity WTP Renovation and allied works
DEPOSIT Kalamassery Municipality Deposit work Providing a new bigger line to reduce the water scarcity problem at Vidya Nagar Road bylane 1 and bylane 2 in ward no 26 Pipeline Work
Re-e-tender- DEPOSIT-Utility shifting- Work under SC development Ambedkar Grama Vikasana Programme at Kundayittammal colony, Concrete road - From Shanmuga house to Kunnath Ambootty house (Water tank road)-Pipeline Work
KDP 2021-2022 (Pathanamthitta Municipality) - Extension of Pipeline to Madeena Junction-Parasuraman purayidam (Kuzhipurayidam road), Mankottumuruppu -Pangattupadi road and replacing old, damaged GI pipes in Appolo road(Sabeenapadi to Basheerpadi) in
O and M Water Supply Schemes AMC CWSS to Palakkad Municipality Wards 1 to 18 (Mattumantha Zone) Repair of Various pipe lines and allied works for the year 2026_2027 Pipeline Work
State Plan 2025 26 Supply and erection of 215 HP centrifugal pump sets having a discharge of 417 LPS against a total head of 30m at Thammanam Pump House Pipeline Work
AMRUT-2.0 - Replacement of existing Distribution lines at PSY East Area in Irinjalakuda Municipality-Replacement of existing Distribution line from Panoli Bridge to Mapranam Block Jn (Civil Station Road) -Pipeline Work
AMRUT-2.0-THRISSUR WATER SUPPLY SCHEME - Design , Construction and Commissioning of 20 MLD Water Treatment Plant by demolishing the existing 14.50 MLD Water Treatment Plant at Peechi-PART 2- Pipeline Work
JJM-WSS to Keezhuparamba Panchayath in Malappuram District -Package ll - Supply laying clear water pumping main Distribution system with FHTC including construction of 4 LL Capacity OHSR at Thadapparamba
Annual maintenance 2021-22- Leak rectification works in pumping main and distribution system of CARWSS to Moorkkanad and adjoining Villages in Kuruva and Puzhakkattiri Panchayath under P.H Section,Mankada