Loading…
Loading…
10,778 results • Best match
Road restoration works
Deposit work of Aryancodu grama panchayath 2020 - 2021 RWSS to Aryancodu pipe line extension and new street fountain from Kuttianicodu meenacodu muzhagil , Mukolavila to pulinkudi and Thavarukonam underParassala section
CWSS to Kallikadu-Deposit Work-Pipe line extension from 8 location of Kallikadugramapanchayath,Marakunnam to KimaThachancodu road in Vlavettyward,swarnacodumalavilaKallipara ward, Mullilavinmoodu area in chamavilappuram ward, Pazhukala to Kanchimoo
Jal Jeevan Mission (JJM)-(2021-2024) Phase II - ARWSS to Krishnagiri Purakkadi and Ambalavayal Villages-Pipe line extension and providing FHTC in various wards of Meenagadi GP - Reach II
DEPOSIT-Alappuzha Jilla Panchayat- Chennithala Division.-Deposit work-Alappuzha Jilla Panchayat- Chennithala Division - RWSS to Chettikulangara-Extension of pipe line at various places in ward XIII of Chettikulangara Panchayat
WSS Aralummoodu Deposit work TWSS to Nemom Water supply pipe line Extension in Chudukandanvila(Resolution from Kalliyoorpanchayath) Cheruplavarathala Paramupillaroad Nanukuttan Nair road Pullikkokulam(Resolution From KalliyoorPanchayath - Ward 9)Oo
Deposit Work in Kunnathunadu Panchayath Annual Project -2021-2022 - Replacing old damaged water supply pipe line in Pattimattom - Erumely road( Moonelimugal Dharusalam juma masjid to Poolekkulam ) at Kunnathunadu Panchayath
RWSS to Ramamangalam Extension of pipe line and replacement in various roads in ward No.3 Pathikal colony road and ward No. 4 Uzhuthumala colony road of Ramamangalam Panchayath.
Jal Jeevan Mission (JJM)-(2021-2024) Phase II - ARWSS to Krishnagiri Purakkadi and Ambalavayal Villages-Pipe line Extension and Providing FHTC in various Wards in Meenangadi GP - Reach - I
Annual Plan-General (2024-2025) - 394 - Completion of Amaravathy Kizhakkumedu Pipe line In Kumily GP-General Civil WorkCulvert and Other Associated works in Thekkemala Kanamala Road-General Civil Work
Deposit work UWSS to Kothamangalam Extension of pipe line at Injani bhagam Ayyankavu school Santhi nagar road and Near Valiyakavu Anganvady road in ward No 15 of Kothamangalam Muncipality
State plan -2022- 23- Optimization of Production Transmission((4215-01-800-89) - Cherupulassery municipality- Pipe Line Extension Work from High school road to Niraparambu Water scarcity Area Reach-II
Deposit work-Muvattupuzha Block Panchayath Project No. S0074/22 Arakkuzha Division WSS Extension of pipe line to Perumbaloor Mavinchuvadu Canal road in Ward No. 13 of Arakuzha Grama Panchayath.
KIIFB- Replacement of old and damaged 150 mm/80 mm AC pipe lines with PE pipe in Nellippally, Kallar, Thumpodu Roads in Punalur Municipality
Restoration work-tile work
This restoration estimate prepared using the deposited amount of JJM.This estimate icluded Loosening of the ground under subbase, Strengthening the trench taken areas with GSB and WMM, tile rectification work for damaged tile area and concrete etc.
ROAD RESTORATION WORK
DEPOSIT-(24-25) - WSS to Mananthavady, Edavakka and Naloornadu villages-Pipeline extension to BSNL office and DSS convent road in Mananthavady(M)(Proj No 701/24) -Pipeline Work
O M Water Supply Schemes RC kilimanoor Running contract Kilimanoor Panchayat RC2023 24 Rectification of leakages breakages in pipe lines in Kilimanoor panchayath area Pipeline Work Pipeline Work
KWA Revenue Annual Maintenance 2023 24 UWSS to Muvattupuzha Repairs of pipelines in Muvattupuzha Municipality South Zone for one year period General Civil Work
Vellarada and Ottasekharamangalam Panchayath Phase2 Water supply line extension and providing water connections from existing and proposed pipelines to households of Vellarada and Ottasekharamangalam
Construction of foundation Installation and commissioning of the two Kirloskar make fire engines and allied pipelines and fittings at Quilon LPG Bottling Plant, Kerala
Supply and Installation of Sacrificial Anode Cathode Protection SACP to Underground Pipelines of NCB and BTP Jetties and CAT Survey at Willingdon Island Terminal
Providing Functional House Hold Tap Connection in various wards-Pipeline Work
Renovation of existing WSS Providing Distribution line and FHTCs Pipeline Work
Deposit work Disconnection of Public taps in Pindimana Panchayath Pipeline Work
Laying Distribution Network and Providing FHTCs in Ayanchery Panchayath-Pipeline Work
zone-2 vanimel Providing balance house hold tap connection-Pipeline Work
Laying interlock tiles to Tata pipeline road , including renovating drain.Div.68
area and providing 1310 FHTCs under KWA Scheme area -Pipeline Work
JJM-WSS TO KARADI D I V I S I O N I N W A R D 9 O F NELLIYAMPATHY GP-CONSTRUCTION OF OPEN WELL, PUMP HOUSE, SUPPLY AND ERECTION OF MOTOR PUMP SET, LAYING PUMPING MAIN, DISTRIBUTION SYSTEM AND TAPS
This estimate is prepared as per the requirement of the ITI officials for the provision of a submersible pump, water tank and accessories. 1HP submersible pump is proposed in this estimate along with 500 Litre water tank and pumping main and distribu
DW2021 Kochi Corporation Extension of 450 mm DI pipe with 200 mm DI pipe to world bank tank for improving water supply to vennala area and making by pass arrangement for vyttila pumping main interconnecting 500 mm DI at Thammanam pump house
This work is for providing water supply connection to Nucleus Saffron Apartment in Master road by laying 90 mm PVC ( 6kg/cm2) pipe in Division No.47 (old) of Kochi Corporation. Connection to be taken from 225mm AC pumping main in chittoor road
For providing 8 house hold connections in thiruvarpp panchayath
DWSS
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC3 Providing Pipeline Extensions and 900 FHTCs in Mottakkavu Ward No 5 Karikkuzhi Ward No 8 Konganamkodu Ward No 9 Vellanchira ward No 13 S N Puram ward No 14 Ajayapuram Ward No 15 and Miscellaneous Connection
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC3 Providing Pipeline Extensions and 900 FHTCs in Viswapuram Ward No 1 Perayam Ward No 2 Panayamuttam ward No 3 Kothakulangara ward No 4 Meenilam Ward No 6 and Attukal ward No 7 of Panavoor Grama Panchayath
Jal Jeevan Mission Providing balance h o u s e h o l d t a p c o n n e c t i o n i n Nadapuram Tuneri Valayam and Vanimel GPs zone 1 vanimel Balance house hold tap connection Pipeline Work
DEPOSIT work for PMGSY Ittiva R e s t o r a t i o n o f D a m a g e d distribution connections during PMGSY roadwork at kuzhiyam Restoration of Damaged distribution connections during PMGSY roadwork at kuzhiyam Pipeline Work
Work is proposed for laying 90 mm PVC 8kg/m 156 m and the road restoration with CC, Providing and laying quarry muck for the proper subgrade strength for the scheme RWSS To Pulamanthole in Adakkakalam Thottyil road in Ward 8 Pulamanthole
deposit work