Loading…
Loading…
10,752 results • Best match
Deposit- Naranamuzhy grama pt.RWSS to Adchipuzha - Pipe line extension from Kaipuzhakuzhi to Vikramanpadi in Ward 10 of Naranammoozhi Gramapanchayath
SO447/26-Concreting of pipe line road haritha nagar road and construction of drain covering slab in ward-27
Deposit work-2019-20- Kondotty Municipality- Pipe line extension to Kondramkunnu - Chembramkunnu - Palliyali area (Reach - 2) in Kondotty Municipality
DEPOSIT WORK UDAYANAPURAM PANCHAYATH RESOLUTION NO 1 13 dt 04 02 19 EXTENSION OF PIPE LINE IN WARD VIII
State Plan 2020 21 RWSS to Pudukkad Relaying damaged pipe line at Kanjoor Vimaya Nagar in Pudukkad Grama Panchayath
Maranalloor GP 2024-25 - Rectification of pipe line portions of various road in Ward 8 -Project No. 283/25
Maintenance of Well, Tank Construction and Pipe Line Extension at Devagiri SC Colony in Ward 2 of Thuravoor GP
Deposit work 2020-21- Pipe line extension work Chundakunnu Anganavadi Pradesam - Ward No_13 in Vellinezhy Grama Panchayath - project no_317
Deposit work -Kondotty Block Panchayath 2019-20 - Pipe line extension to Pullur purayi SC Colony area of Pulikkal Panchayath
Pro No 303/23-Drinking water Project Installation of Motor and Pipe line at Njannamala kizhakkubhaagam ST Colony Colony
Deposit Work of TVM Corporation Project S0048 20 Laying 90mm PVC Pipe line at various places at Thuruthumoola Ward
MPLADS 2019-20 - N.K.Premachandran MP(LS) - Extension of pipe line at Kandekkara colony in Naduvilakkara ward of Thrikovilvattam Panchayath
Deposit work- RWSS to Edathala Panchayath -Extension of pipe line in Paramel road in ward 5 of Edathala Panchayath
RE TENDER -Mananthavady Municipality Pro no 1057/25 INSTALLATION OF TANK AND EXTENSION OF PIPE LINE FOR CHIRAKKARA COMPANYPEEDIKA
LAC-ADS-Balnce fund-Pipe line extension at various places in Variyamparamby, Vadakkeprambu, Olappakulam Ward-4 of Pirayiri Panchayath
Annual Plan- Karoor GP- Ward 1 15 Thekkedath Kudavathi Paramada Drinking water Project Pipe line P.NO.324/24-25
Deposit work 2020-21 - Anicadu Grama Panchayath - Pipe line extension at Malampara Thalachoottuparambu Kunnelpadi - Edamurikkal and Pullukuthi - Thekkada etc.
IMPLEMENTATION OF PIPE LINE EXTENSION WORK OF KULAMBU DWSS IN PANJAL GP UNDER DEPOSIT SCHEME OF PAZHAYANNUR BLOCK PANCHAYATH
DRW 2019 - Extension of pipe line from Kalpakasseril padi to Nayanam padi in Ward No.23 of Pandalam Municipality
Annual Plan-Uzhavoor BP 109/2025-26-Ramapuram Division - Kalarikkunnu DWSS Kizhathiri ward pipe line installation-General Civil Work
Maranalloor GP - 2024-25 - Rectification of pipe line portion of various roads in ward 12-Project No. 316/25
Vannappuram GP 2022-23 Vellilamparappu Drinking Water Scheme Pipe line extension ,Ward-9-VPM Pr No 16/2022-23
DEPOSIT WORK KADUTHURUTHY BLOCK PANCHAYATH 2019 20 EXTENSION OF PIPE LINE TOWARDS IN DEEPABALI MOOLOKKAROTTU ROAD IN KALLARA PANCHAYATH
Road restoration work Preparing the sub grade and metalling of damaged tarred surface in connection with pipe line work
STATE PLAN 2022-23- REPLACING OLD AC PIPE LINE FROM RMO PUMP HOUSE TO CHAMAKKADA ROAD, THAMARAKKULAM DIVISION, KOLLAM
Pudussery grama panchayath deposit 20-21 laying pipe line various places of W No 21 in Pudussery grama panchayath
Deposit Work of Tvpm Corporation - Project No. S0048/20 - Laying new pipe line in various places under Kudappanakkunnu Ward
Pudussery grama Panchayath deposit work 2020-21 Pipe line extension at Chellekkad of W No in Pudussery grama panchayath
Deposit work - Pipe line extension and providing 17 nos of water connection at Moyyarkunnu Ambedkar colony in Koothali Panchayath
PR.NO. 554/24-25-Erecting motor pumpset and pipe line extention at vayaloram drinking water project in ward 5
Maranalloor GP - 2024-25 - Rectification of pipe line portion of various roads in ward 16-Project No. 313/25
Deposit work 2021- Pipe line extension in various places at Pattithara panchayath.(Project No 6/2020-2021)- Phase I
Deposit work Mattathur GP 2021 22 Replacement of pipe line to various parts at Mattathur GP General civil work
562/22 Retarring Various zonal maintenance of various roads damaged by drainage connections and laying pipe line In Thiruvananthapuram
Minority Development Plan 2018-19 - ARWSS to Keezhuparamba - Extension of pipe line to Pattakkal - Kakkaparamba area in Keezhuparamba Panchayath
MLA-ADF-Vamanapuram Block Panchayath-Providing pipe line extension to Iruloor,Meethoor and Thoongayil ward in Vamanapuram block Panchayth
Deposit work maintenance work of pipe line,valve,motor etc in various mini water supply scheme in maniyure pt
Deposit Work Kollam Jilla Panchayath Pipe line extenion and Providing House connections in Akkapoika Colony of Elamadu Grama Panchayath
DEPOSIT Konni Block Panchayth WSS to Extension of pipe line Ezhumon Thadathil in Ward 13 in Premadom Grama Panchayth
Sabarimala Devaswom Mandalam and Makaravilaku festivals in 1202ME Cleaning of the Neythonies ghee storage Tank and Ghee Pipe Line
Annual Plan-2023-24 MANGALAM GP_ WARD 18, 19, 20_ 345/23-24, PIPE LINE EXTENTION IN COASTAL AREA
Deposit work 2020-21- Pipe line extension work at ChundakunnuNellipettaPradesam - Ward No 13 in VellinezhyGrama Panchayath (project no 318)
Deposit Work - RWSS to Karukutty - Extension of pipe line to Karshika Market at Ward No.13 of Karukutty Panchayath.
District panchayath deposit work -Pipe line Extension to Koonthanithodi colony and adjacent area in ward no-6 Nellaya Panchayath
Deposit work 2020-21 - Veliyanadu Block Panchayath - Pipe line extension in various wards in Ramankary and Veliyanadu Grama panchayath.
Prjt No. 147/23 Kadhalichira Lift Irrigation pipe line maintenance of Aloor Grama Panchayath under Annual Plan 2022-23
Annual Maintenance of Muthuthala -Leak Rectification of various size of pipe line and various places at Muthuthala Grama Panchayath
Deposit Work -Spill Over Work-Areacode Block Panchayath- Pipe Line Extension To Ekkaparamba - Kottepadam - Thaiparamba In Kuzhimanna Grama Panchayath.
Mulakulam Grama Panchayath Extension of pipe line towards Vadukunnappuzha Harigen colony road in ward 2 of Mulakulam Grama Panchayath
Maranalloor GP - 2024-25 - Rectification of pipe line portion of various roads in ward 3-Project No. 315/25