Loading…
Loading…
6,382 results • Best match
Wet drilling of holes in the roof/sides by providing 03 Nos Hydraulic power pack drilling arrangement and loading, Transporting, Unloading and laying, fixing/joint 2 inch water supply MS/GI pipeline in 40LE/19D, 37LW/19D and 34LE/19D in Bartarai
Survey, Investigation, Design and Construction of PWSS under JJM at Village Majhgawan Shekh, Balgaha, Hinauta Mishra and Bakulaha Block Gunour based on TW. i.c. Construction of 50 KL and 75KL 12m staging RCC OHT, 20KL Sump Well , pipeline, etc i/c c
Retrofitting of PWSS under JJM at Village Gaura Block Panna based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Repairing and maintenance of india mark ii handpump by providind skilled unskilled labour and vehicle with T AND P and taking out fallen pipeline of handpump as well as taking out fallen single phase motorpump from tubewell in Block ARON Distt GUNA
Providing, Laying, Jointing, Testing and Commissioning of 63 mm dia HDPE pipeline with all allied civil works at Badribaag Colony,Purandas Ka Bageecha, Brooke bond Colony Noori Nagar Gali No. 08, and Manikbaag Shashri Nagar Zone no. 15 Ward no.73 (as
Retrofitting of PWSS under JJM at Village Devri Block Panna based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Providing, Laying, Jointing, Testing and Commissioning of 110 and 315 mm dia H.P.D.E. and 100,200 and 300 ACP Pipeline at Nagin Nagar Road, Power House under Chandan Nagar Tank Area of Zone no.16 Ward no.03 (as per schedule)FIRST CALL
Repairing and maintenance of india mark ii handpump by providind skilled unskilled labour and vehicle with T AND P and taking out fallen pipeline of handpump as well as taking out fallen single phase motorpump from tubewell in Block GUNA Distt GUNA
Retrofitting of PWSS under JJM at Village Pagra Block Gunour based on TW. i.c. Construction of 75KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Survey, Investigation, Design and Construction of PWSS under JJM at Village Majhgawan Shekh, Balgaha, Hinauta Mishra and Bakulaha Block Gunour based on TW. i.c. Construction of 50 KL and 75KL 12m staging RCC OHT, 20KL Sump Well , pipeline, etc i/c c
Retrofitting of PWSS under JJM at Village Manikpur Kala Block Gunour based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire
Retrofitting of PWSS under JJM at Village Murachh Block Panna based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Retrofitting of PWSS under JJM at Village Maheba Block Gunour based on TW. i.c. Construction of 300KL RCC OHT, 50KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Survey, laying of G.I. pipeline, installation of motor pumps and other works as per scope of bid in Ward No. 13 of Gwalior Municipal Corporation with testing and commissioning of all works including successful trial run of all works for 15 days.
Retrofitting of PWSS under JJM at Village Gadokhar Block Gunour based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sche
Retrofitting of PWSS of FHTC (UNDER JJM) 50 kl RCC OHT 12 mtr Staging and 20 KL Sumpwell at Villege Jhurki, 50 kl RCC OHT 12 mtr Staging at Villege Masurghughari and Laying and Jointing of Pipeline at Vill Choudas of Block Niwas
Retrofitting of PWSS under JJM at Village Sakariya Block Panna based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
PWSS under JJM at Village Barshobha, Bhadar and Bamhori Block Gunnor based on TW. i.c. Construction of 50 and 125KL RCC OHT, Sumpwel 20KL, pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of enti
Retrofitting of PWSS under JJM at Village Umri Block Panna based on TW. i.c. Construction of 150KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Jardhoba Block Panna based on TW. i.c. Construction of 75KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS of FHTC Constructions of RCC OHT 100 K.L 15 mtr staging and 20 kl Sumpwell at vill Paraswah and 2 Nos 30 KL Sumpwell at vill Kathaidih and laying and jointing of Pipeline of Block Ghughari of District Mandla
Retrofitting of PWSS under JJM at Village Badagaon Block Panna based on TW. i.c. Construction of 250KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90 Days Trial Run Commissioningperiod of entire schem
Retrofitting of PWSS under JJM at Village Bhatiya Block Gunour based on TW. i.c. Construction of 75KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS of FHTC (UNDER JJM) RCC OHT 100 KL 12 mtr Staging and 20 KL Sumpwell at Villege Achli, 50 KL Sumpwell at Villege Paijwara, Tindni, 40 kl Sumpwell at Villege Kathotiya and Laying and Jointing of Pipeline of Block Mandla
Retrofitting of PWSS under JJM at Village Tikariya Block Gunour based on TW. i.c. Construction of 75KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire schem
Providing, Laying, Jointing, Testing and Commissioning of 63 mm dia HDPE pipeline with all allied civil works at Vishal Nagar, Chotti Kumhar Khedi, Valmiki Nagar, Mahesh Yadav Nagar,Jai Hind Nagar. Zone no.04 Ward no.10(as per schedule) SECOND CALL
Retrofitting of PWSS under JJM at Village Saleha Block Gunour based on TW. i.c. Construction of 75KL RCC OHT, 30KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Dubahiya, Itwan Tilha and Amsil Block Panna based on TW. i.c. Construction of 50KL RCC OHT, Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning perio
Retrofitting of PWSS under JJM at Village Dwari Block Gunour based on TW i.c Construction of 100 KL and 50KL 12m staging RCC OHT, 20KL Sump Well , pipeline, etc i.c cost of all material and labour with 90Days TrialRun Commissioning period of entire
Retrofitting of PWSS under JJM at Village Girwara Block Panna based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Sunwari Block Pawai based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
PWSS under JJM at Village Mangrailakhurd, Kushedar and Bhatanwara Block Gunour based on TW. i.c. Construction of 02 Nos. 75KL RCC OHT, Sumpwel 30 and 20 KL, pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commission
Retrofitting of PWSS of FHTC Constructions of RCC OHT 75 K.L 15 mtr staging and 2 Nos 20 kl Sumpwell at vill Kuntidadargaon and 20 KL Sumpwell at vill Lodha, Chitapakhana and laying and jointing of Pipeline of Block Ghughari of District Mandla
Retrofitting of PWSS under JJM at Village Manaur Block Panna based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Retrofitting of PWSS under JJM at Village Duraunha Block Gunour based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire schem
Retrofitting of PWSS under JJM at Village Chikalhai, Pagra Chhota and Khamri Block Gunour based on TW. i.c. Construction of 50KL RCC OHT, Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning p
Retrofitting of PWSS of FHTC Constructions of RCC OHT 75 KL Capacity at Village Banar and RCC OHT 75 K.L. Capacity and 20KL Sumpwell at vill Kapa and laying and jointing of Pipeline as per BOQ of Block Narayanganj of District Mandla
Retrofitting of PWSS of FHTC Constructions of RCC OHT 75 KL Capacity with 12 mtr staging at Village Tatri, 40 K.L Sumpwell.at Village Bhongadwar and laying and jointing of Pipeline at Village Tuiyapani as per BOQ of Block Nainpur of District Mandla
Repair and Maintenance of Misc. civil works i/c civil maintenance work water supply pipeline, Providing and fixing of 3 HP submercible motor pump at DC1 and DC 2 Premises Amarwara, 33/11 KV s/s Utekata ,Sarora, Jhirpa and umreth respectively
Providing, Laying, Jointing, Testing and Commissioning of 63 mm dia H.P.D.E. Pipeline and GI specials for borings at Vijay nagar Khandankar garden,Gali no.1,3,4,5 and sector D.K.2,behind prestige college of Zone no.07 Ward no.29 (as per schedule)
Repairing and maintenance of 2650 nos. india mark ii handpump by providind skilled unskilled labour and vehicle with T and P and taking out fallen pipeline of handpump as well as taking out fallen single phase motorpump from tubewell in block Vijayp
Retrofitting of PWSS under JJM at Village Purana Panna Block Panna based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire
Retrofitting Of PWSS under JJM at Dilheri, Amgaonbada and Barmankala Block Kareli Dist Narsinghpur based on submersible pump ,laying pipe line, RCC OHT, household connect, 90 Days trial
Routine maintenance work of ash slurry pipe line A,B,C,D from ash pump House to ash discharge point in Unit No.6 and 7 STPS,Sarni.
Providing laying and Jointing of 50 mm dia G.I. Pipe line at Bagh Munshi Husain Khan behind Marghatiya Mandir Mehandi wali gali ward No. 09 Zone No.03
TRIBAL BOYS HOSTEL BARHI TOILET AND BATHROOM REPLACEMENT OF GLASSES OF WINDOW AND SKY LIGHT PAINTING AND PAINTING OF PVC PIPE LINE BUILDING PAINTING AND OTHER REPAIR WORK
TRIBAL GIRLS HOSTEL GHUGHRA ROOF REPAIR WORK AND WATER PROOFING FLORING WORK KOTA STONE TILES IN TOILET PIPE LINE FITTING PLASTER REPAIR WORK PAINTING AND OTHER REPAIR WORK
Providing laying and jointing of distribution pipe line system, Moter Pump Installation of Non-functional Piped Water Supply Schemes of Block Alirajpur of Division Alirajpur District Alirajpur MP
Drilling of Tube well and laying of water Supply pipe line near Water Hut of Potato-Onion Sector at Devi Ahilyabai Holkar Fruit and vegetable Mandi Yard,Indore.
Boring of Tubewell and P f submersible pump set and pipe line etc complete at 33 11 kv S s at KILA AMARGARH O and M circle Rajgarh