Loading…
Loading…
6,382 results • Best match
REPLACEMENT OF UG WATER SUPPLY PIPELINE IN MANDIR LINES AND REPLACEMENT OF LT PANEL WITH CONNECTED ACCESSORIES, PROVN OF TOILETS IN ATA AND OTHER SANCTIONED WORK AT CMM UNDER AGE B/R-I AND AGE E/M OF GE (EAST) JABALPUR
Providing, Laying, Jointing, Testing and Commissioning of 15,25,50 mm dia G.I. pipeline with all allied civil works at Front off Rajat Jayanti high Secondary School and Shri Jayesh Parmar House area Zone no. 12 Ward no.62 (as per schedule)
Retrofitting of PWSS under JJM at Village Kamtana Block Gunour based on TW. i.c. motorpump, Construction of 225KL RCC OHT, 20KL SumpWell, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Chhaparwara Block Gunour based on TW. i.c. Construction of 75KL RCC OHT, Sumpwell cum pumphouse 20KL, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sch
Custom Bid for Services - RE CERTIFICATION OF INTEGRATED MANAGEMENT SYSTEM OF HVJ PIPELINE SYSTEM BIDDER MUST PROVIDE OVERALL PRICE BREAKUP IN FINANCIAL DOCUMENT AS PER SOR IN SECTION VII OF ATC DOCUMENT Similar Category Hiring Of Agency For ISO Certification Service
Custom Bid for Services - PIPELINE OFC RECTIFICATION OR REPLACEMENT WORKS UNDER KAILARAS REGION DETAILED BREAK UP OF SOR IS PROVIDED FOR REFERENCE IN SECTION VII OF TENDER DOCUMENT LUMPSUM AMOUNT TO BE QUOTED HERE CONSIDERING ALL THE SOR ITEMS INCLUD..
SEWAGE PIPELINE LAYING AND MANHOLE CONSTRUCTION UNDER ZONE 21
PIPELINE SHIFTING OF CI COLONY WARD 43 ZONR 09.
LAYING OF 3LPE COATED CS PIPELINE IN REWA GA
high mast POLE (Q3), Language lab (Q3), shed (Q3), Gi pipe line (Q3), Gard room (Q3), civil work (Q3), road repairing worK (Q3), sewer drain line (Q3)
Providing laying jointing of distribution pipe line system, Moter Pump Installation of Non-functional Piped Water Supply Schemes of Block Kukshi of Division Sardarpur, District -Dhar (M.P.)
Retrofitting Of PWSS under JJM at Village Muar, Mehragaon, Nimawar, Tumda Block Saikheda Dist Narsinghpur based on submersible pump ,laying pipe line, household connect, 90 Days trial
Providing laying jointing of distribution pipe line system, Moter Pump Installation of Non-functional Piped Water Supply Schemes of Block Bagh of Division Sardarpur, District -Dhar (M.P.)
PROVIDING, LAYING AND JOINTING OF 110MM DIA HDPE PIPE LINE IN FRONT OF WARD OFFICE 31 FOR LINE 8179 TO 8185 TULSI NAGAR WARD 31 ZONE 07
Providing laying jointing of distribution pipe line system, Moter Pump Installation of Non-functional Piped Water Supply Schemes of Block Manawar of Division Sardarpur, District -Dhar (M.P.)
Design, Construction and Retrofitting of PWSS under Jal Jeevan Mission at Village - Dudhiya Block Indore including Construction of Sumpwell, laying and jointing of pipe line etc. complete
Providing Laying and Jointing of 100 mm dia D.I. K-7 Distribution Pipe Line in Majdoor Nagar and Sharma Colony ward No. 09 under Zone no.03
Providing laying jointing of distribution pipe line system, Moter Pump Installation of Non-functional Piped Water Supply Schemes of Block Gandhwani of Division Sardarpur, District -Dhar (M.P.)
Providing laying jointing of distribution pipe line system, Moter Pump Installation of Non-functional Piped Water Supply Schemes of Block Nisarpur of Division Sardarpur, District -Dhar (M.P.)
Taking colour printout of various size drawings, maps (feeder pipe line system, distribution system, catchment area etc.) with their lamination and complete framing work under WWD BMC.
Retrofitting Of PWSS under JJM at Village Pitrash and Piparpani Block Saikheda Dist Narsinghpur based on submersible pump ,laying pipe line, household connect, 90 Days trial Run
Providing, Laying and Jointing of 100 mm DI Class K-7 Distribution Pipe line in Bagh Munshi Hussain khan area ward no. 09 under Zone no.03
Providing laying jointing of distribution pipe line system, Moter Pump Installation of Non-functional Piped Water Supply Schemes of Block Sardarpur of Division Sardarpur, District -Dhar (M.P.)
PROVIDING LAYING AND JOINTING OF 15 MM DIA, 25 MM DIA, 50 MM DIA G.I. PIPE LINE AT NEAR PULPUKHATA PLANT NAGAR NIGAM QUARTER ZONE NO. 08
ANNUAL RATES FOR REPAIRING OF LEAKAGES ,REMOVING CONTAMINATION ,DAMAGED PIPE CHANGE, VALVE REPAIRING ETC. OTHER MAINTENANCE IN PIPE LINE WORK IN INDORE CITY AREA INDORE.As per Schedule.
Drilling of tube well I c providing and fixing of submersible pump and pipe line at Gouharganj 33 11 kv S s under O M Circle Raisen
Providing Laying and Jointing of 110 mm dia HDPE Water Distribution Pipe Line at Poorvi Nishatpura and Prempura Nariyal Kheda ward No. 12 under Zone no.03
Drilling of tubewell I c P f submersible pump pipe line cable etc complete at 33 11 kv S s Ramakhedi under EE O and M Obedullagunj
Custom Bid for Services - LUMPSUM VALUE FOR ENGINEER VISIT CHARGES FOR 3 YEARS AT VIJAIPUR, Custom Bid for Services - LUMPSUM VALUE FOR ENGINEER VISIT CHARGES FOR 3 YEARS IN RAJASTHAN REGION Similar Category Maintenance and Pigging Service for Oil ... Gas Pipelines Maintenance ... Gas Pipelines
Retrofitting of PWSS of FHTC Constructions of RCC OHT 50 K.L. Capacity with 15 mtr staging at Village Majhgaon and Sumpwell 20 K.L. at Village Medhi and laying and jointing of Pipeline at Village Saraswahi, Aamadadar, Padarpani and Mohgaon of NIWAS
Retrofitting of PWSS of FHTC Cons of RCC OHT 50K.L at Village Ramgadhi and Sumpwell 50 K.L Maldha 10000 ltr HDP Tank at Putarra and laying and jointing of Pipeline at Village Atariya, Saliwada Mal, Jaitpuri and Delha of Block Nainpur
Providing and installation 02 new clear water pumps of 150 HP 1930 LPM discharge at 205m head for clear water pumping main under 19 villages Chipaner Group Water Supply Scheme based on Narmada River source Block Bhairunda in district Sehore includin
Laying, jointing and dismantling of 200mm and 150mm MS/GI pipe with all associated accessories for day to day maintenance of pump pipeline for dewatering of mine water including tanker point as and when required basis at various location of Amadand O
Retrofitting of PWSS under JJM at Village Sathaniya Block Gunour based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sch
Retrofitting of PWSS under JJM at Village Harira Block Gunour based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Work of Providing 100 mm dia bulk connection with Providing, Laying, Jointing, Testing and Commissioning of 110 mm dia HDPE Pipeline with all allied civil works as per schedule at M.T.H. Hospital Zone no.11 Ward no.60 (as per schedule)SECOND CALL
Retrofitting of PWSS under JJM at Village Mutwakala Block Panna based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sche
Providing, Laying, Jointing, Testing and Commissioning of 63 mm dia HDPE pipeline at Somnath ki Chal And Kannu Ki Chal, Shesh Nadiya Nagar, Aadishakti Mandir, G, and J Sector, Sethi Nagar, Chhoti Khajrani, Zone no.09 Ward no.44 (as per schedule)
Retrofitting of PWSS under JJM at Village Badwara Block Panna based on TW. i.c. Construction of 200KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS under JJM at Village Nachnaura Block Gunour based on TW. i.c. Construction of 100KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sch
Retrofitting of PWSS under JJM at Village Gaura Block Gunour based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Providing, Laying, Jointing, Testing and Commissioning of 63 mm dia H.P.D.E. and 15,25,50 mm dia G.I. Pipeline at Shivaji nagar Jivan ki fail,Bapu nagar,kachi mohalla,Usha fatak and other places of Zone no.03 Ward no.56 (as per schedule)
Retrofitting of PWSS under JJM at Village Ramkhiriya Block Panna based on TW. i.c. Construction of 75KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sche
Retrofitting of PWSS under JJM at Village Sundara Block Panna based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Retrofitting of PWSS under JJM at Village Rampur Block Gunour based on TW. i.c. Construction of 125KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme
Retrofitting of PWSS of FHTC (UNDER JJM) 75 kl RCC OHT 12 mtr Staging and 20 KL Sumpwell at Villege Sunehramal and 40 KL Sumpwell at Villege Surajpura and Laying and Jointing of Pipeline at Villege Jamunpani, Piparpani, Deori, Pondimal of Block Mandl
Retrofitting of PWSS under JJM at Village Dwari Block Gunour based on TW. i.c. Construction of 100KL and 50KL RCC OHT, SumpWell 20 KL, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire scheme.
Retrofitting of PWSS under JJM at Village Tidunahai Block Gunour based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire sche
Retrofitting of PWSS under JJM at Village Itwanmahgu and Puraina Block Panna based on TW. i.c. Construction of 75KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of
Retrofitting of PWSS under JJM at Village Raniganj Purwa Block Panna based on TW. i.c. Construction of 50KL RCC OHT, 20KL Sump Well Cum Pumphouse, pipeline, etc i/c cost of all material and labour with 90Days TrialRun Commissioning period of entire