Loading…
Loading…
5,274 results • Best match
ESTIMATE FOR THE LAYING U/G RCC PIPELINE IN WATER COURSE OF OUTLET R.D 88880/T.L. OF AMRITSAR DISTY.
Lining and Relining of w/c with u/g pipeline/Brick lining of Outlet RD 23348-TL ofPandher Disty
Lining/Relining of Water courses of Outlet RD 140045-R of Kotla Branch Disty of Village Husanpur(UG Pipeline)
ESTIMATE FOR THE LAYING U/G RCC PIPELINE IN WATER COURSE OF OUTLET R.D 30150/R OF RASULPUR MINOR.
ESTIMATE FOR LAYING OF UNDERGROUND RCC PIPELINE FOR OUTLET RD 4050-L OF 1-L MINOR OF MALOUD DISTRIBUTARY
ESTIMATE FOR THE LAYING U/G RCC PIPELINE IN WATER COURSE OF OUTLET (R.D 64564/R) OF RASULPUR DISTY.
LAYING OF UPVC PIPELINE OFF TAKING AT RD 24651R AND 24953R DIRECT OUTLET OF KANDI CANAL STAGE I
Estimate for ensuring routine operation and maintenance of Thana Dam, Dholbaha Dam, Janauri Dam and Damsal Dam including pipelines of distribution system under the jurisdiction of Kandi Area Dam Maintenance Division no. 2 Hoshiarpur
REPAIR OF PUMP CHAMBER OHSR WATER WORKS AND PIPE LINE LEAKAGES NEW CHLORINATOR WATER CONNECTIONS PROVIDING AND LAYING PIPE LINE AND SLUICE VALVE ETC
Distribution of Pipe Line, House Connection Work and etc.
BOOKSHELVES, AIR FILTER, PNEUMATIC GUN, THERMOMETER, PNEUMATIC PIPE LINE
Rough Cost estimate for replacement of damaged water supply AC pipeline with DI pipeline from RMC Point towards ind. Area phase-7/8 light point and laying of water supply line for connecting canal water to newly proposed booster in ind. Area phase-8
PROVIDING AND INSTALLING NEW TUBEWELL, OHSR, PUMPING MAIN, DISTRIBUTION SYSTEM, PUMPING MACHINERY, HOUSEHOLD CONNECTIONS, CHLORINATOR, PUMP CHAMBER
LAYING OF UPVC PIPELINE AT RD 32697R 30210R AND 32800R MTR DIRECDT OUTLET OF KANDI CANAL STAGE I.
ESTIMATE FOR LAYING OF U/G PIPELINE OF O/L R.D 32630/L OF BHAGTUPUR MINOR VILL. SAKHOWAL DISTT.Gurdaspur
Providing and Fixing Chlorination Plant Automated Water Controller Connections on Existing Pipe line and New Pipe line Pipe line 63mm 90mm Sluice Valve and Sluice Valve Haudi Painting of Sign Board Repair of Water Works and other work contigent there
Providing Chlorination Plant Water Connections on Existing Pipe line and New Pipe line Pipe line of Size 63mm o/d Brick on Edge Sluice Valve Automated Water Controller Providing Fixing Sign Board Repair of Pump Chamber Repair of OHSR etc.
Providing Chlorination Plant, Water Connections on Existing Pipe Line, Water Connection on New Pipe Line, Pipe Line of size 63mm od, Brick on Edge, Sluice Valve, Sluice Valve Haudi, Painting of Sign Board, Repair of Pump Chamber, Repair of OHSR, Rep
Providing Chlorination Plant, Water Connections on Existing Pipe Line, Water Connection on New Pipe Line, Automated Water Controller, Pipe Line of size 90mm od and size 63mm od, Brick on Edge, Sluice Valve, Installation of Sign Board, Repair of Pum
pvc pipe 63 mm 6kgcm2, pvc pipe 75 mm 6kgcm2, pvc pipe 90 mm 6kgcm2, pvc pipe 110 mm 6kgcm2, pvc D joint 63 mm, pvc D joint 75 mm, pvc D joint 90 mm, pvc D joint 110 mm, pvc D joint 140 mm, pvc D joint 160 mm, pvc D joint 200 mm, 90mm CI D joint, 110mm CI D joint, 150mm CI D joint, 200mm CI D joint, 250mm CI D joint, pvc socket 90 mm, pvc socket 110 mm, pvc socket 140 mm, pvc socket 160 mm, pvc T joint 90 mm, pvc T joint 110 mm, pvc T joint 140 mm, pvc T joint 160 mm, end cap 63 mm, end cap 75 mm, end cap 90 mm, end cap 110 mm, end cap 140 mm, end cap 160 mm, pvc elbow 63 mm, pvc elbow 75 mm, pvc elbow 90 mm, pvc elbow 110 mm, supply of 150 mm dia column pipe 5.4 mm thick in 3 mtr length, supply of pressure spout toti including transport, loading and unloading upto department store, supply of solvent adhesive for fixing of pvc fitting 500 ml jar including transport, loading and unloading upto departmental store
REPAIR OF PUMP CHAMBER OHSR WATER WORKS AND PIPE LINE LEAKAGES NEW AUTOMATED WATER CONTROLER WATER CONNECTION PIPE LINE SLUICE VALVE AND SOLAR PANEL ETC
Providing and laying 2200 mm and 2000 mm dia RCC NP 3 Pipe Line From Existing Outlet Points of Storm Sewer of Urban Estate Phase 1 3 and 2 to Proposed Outlets Points and Construction of Manholes in Badi Nadi Area at Patiala
DNIT for Prov laying jointing cutting and testing of water supply DI K7 100mm pipe lines and UPVC Sewer 200mm o/d Pipe line with construction of manhole chamber as per site requirement in all other work complete at Dina nagar Towm
Prov laying joining cutting testing of Water Supply G I 50mm i d pipe line and const of Sluice Valve Chamber and Supply Commissioning of Submersible Pump Set and all other works as per site requirement according at various Street Area Batala Town
Providing and Laying of UPVC 10 inch dia UPVC ISI Marked Sewer pipe line and DI k7 Water Supply line in Lathimaar Mohalla, Baba Shah Sikander Mohalla near Jassa Singh Ram Gardia Gurdwara and near Goldy rubber Industry Ward 78 Zone 2
KIT FOR PIPE FITTINGS FOR BRAKE CYLINDER PIPE LINE CONSISTING OF 03 ITEMS:-(A ) TEE EQUAL 15 MM TO ICF DRG. NO. DC/EMU - 3-5-032, ITEM NO. 26, ALT. NO. S/6,OR LATEST. QTY./KIT-07 NOS. (B) ELBOW EQUAL
LAYING OF UPVC PIPELINE AT RD 48041R 47790R 48145R AND 49722R DIRECT OUTLET OF KANDI CANAL STAGE I
Estimate for ReLining Lining of WC by Laying Underground Pipeline of OL RD 276192R of Bathinda Main Branch Village Phulewala
Lining and Relining of w/c with u/g pipeline/Brick lining of Outlet RD 124948- L of Sheron Disty
Estimate for relining of watercourse of outlet RD 141500/L of 2nd Patiala feeder system by laying of underground pipeline.
Estimate for ReLining Lining of WC by Laying Underground Pipeline of OL RD 84030 82051L of Bhadour Disty Village Jalal
Lining of watercourse by laying U/G RCC pipeline of O/L RD-4400/L (Ext.1) of Bhikhi Disty
Estimate for Restoration of damaged/chocked pipeline along with allied work of distribution system of Dholbaha Dam in district Hoshiarpur.
Laying of underground pipeline branch H1-B offtaking from Haudi H-1 o/l RD 111450/L of Narwana Branch
Repair and maintenance of road work pipeline, sewerage, drains, road galli, chamber etc in ward no.13 in NP Begowal
RESTORATION OF ROADS EXCAVATED BY LT FOR PIPELINE WORK IN HARINDER NAGAR Est Cost Rs. 24.18 lacs dt 15/16.05.2025
Estimate for laying underground RCC PIpeline for the Water Course of Outlet RD 28632/L of Dharamkot Distributary (Labour Component)
LAYING OF DWC UNDERGROUND PIPELINE FOR WATERCOURSE OF OUTLET RD 21000-L OF SIDHWAN MINOR VILLAGE UPPAL KHALSA DISTT. JALANDHAR
Estimate for laying underground RCC Pipeline for the Water Course of Outlet RD 2941/R of Kishanpura Distributary (Labour Component)
Estimate for laying underground RCC PIpeline for the Water Course of Outlet RD 2941/R of Kishanpura Distributary (Labour Component)
Estimate for Relining Lining of WC by Laying Underground pipeline of OL RD 9070R of Pandher Mr of Bhikhi Disty
Repair and maintenance of road work pipeline, sewerage, drains, road galli, chamber etc in ward no.8 in NP Begowal
RESTORATION OF ROADS EXCAVATED BY LandT FOR PIPELINE WORK JOGINDER NAGAR (RE) Est cost Rs. 19.92 lacs dt 21/22.09.2026
RESTORATION OF ROADS EXCAVATED BY LandT FOR PIPELINE WORK PRATAP NAGAR (RE ) Est cost Rs. 50.23 lacs dt 21/22.09.2026
Repair and maintenance of road work pipeline, sewerage, drains, road galli, chamber etc in ward no.11 in NP Begowal
Relining of w/c by laying U/G RCC pipeline of 10980-L of Mr. No.7 of Sheron disty
ESTIMATE FOR LAYING U G PIPELINE OF OUTLET RD 20170 L OF VILLAGE QILLA BHARIAN DISTT SANGRUR LENGTH 3006 MTR
Repair and maintenance of road work pipeline, sewerage, drains, road galli, chamber etc in ward no.3 in NP Begowal
Repair and maintenance of road work pipeline, sewerage, drains, road galli, chamber etc in ward no.1 in NP Begowal
RESTORATION OF ROADS EXCAVATED BY LT FOR PIPELINE WORK IN DASHMESH NAGAR Est Cost Rs. 17.94 lacs dt 15/16.05.2025