Loading…
Loading…
14,524 results • Best match
Under Ground OFC Laying Works by Trenching, PLB Pipe Laying, Cable Pulling and Other Allied Works for Data Centers connectivity in Shadnagar Zone under Mahabubnagar OA in Sangareddy BA
Towards Supply, Delivery and Laying and Joiting of HDPE pipe line work at Golden Heights Park, Circle-19, Rsjendranagar , Rajendranagar Zone, UBD,GHMC for the year 2025-26
Repairs to pipeline for Arresting of leakages (GRP/MS pipeline) from LMD, Karimnagar to Sircilla for maintenance of water supply in Sircilla Municipality under General Fund.
Procurement of Dismantling of Existing Silo, Jet Filter and Connected Pipeline, etc and Manufacture, Supply, Fabrication and Erection of Silo, Jet Filter and Connected Pipeline, etc
Replacing of 900mm dia PSC pipeline from Patancheru to Lingampally at Ch. No. 1107.00 near Gandamma Temple under pipeline section, SD-III, O&MDivision No.VIII, Patancheru
Arresting the Leakage of 400 mm dia PSC Pipeline of Ramanpadu Pipeline for Maintenance of Water Supply Scheme in Wanaparthy Municipality Under 15th FC Tied Grants.
Restoration of CC Patches and Laying of Pipe Line at Various Places and Supply and Delivery of Gate Valve and Repairing of Pawer Bores in 32nd ward in Kodad Municipality under MGF/SFC
Drilling of Bore well Installation of pump set and laying of Distribution pipeline Near Otlam Parameshwar Temple at Ward No.11 in Banswada Municipality under 15th Finance Commission funds.
Laying of HDPE pipe line and Supply and Erection of 12.50 HP Submersible motor at Manair river open well, Peddur for water supply in Sircilla Town
Repairs to badly damaged UGD Pipe Line Drain fromH.No.4-133 to H.No.4-130 and H.No.8-223 to H.No.8-211 at Pahadishareef and Abusher Colony, Ward No. 64 Pahadishareef in Jalpally Circle-17, Shamshabad Zone, GHMC
Attending heavy water supply leakages at office of Manager (E), Chintal Basthi Section on 600mm dia CI water supply pumping main from Banjara Sump to Vijaynagar Colony / Old Mallepally under Chintal Basthi Section, SD-II, O&M Division No.III
Supply and Laying of 150mm dia DI K9 Pumping Main and Distribution Network with HDPE Pipe Lines in uncovered areas of Ward no 3, 4, 5, 6, 7, 8, 9 & 23 including 2 No of ELSRs in Manuguru Municipality.
Attending heavy water supply leakage on 600mm dia CI water supply pumping main from Banjara Sump to Vijaynagar Colony, Old Mallepally area at Honda Showroom, Masab Tank under Chintal Basthi Section, Sub Division-II of O&M Division No.III
Removing and Fixing of new 600mm dia DI Sluice valve in place of Non-functioning 600mm dia scour valve on 1500mm dia pumping main at Ch.No. 836 near Naakkavagu Bridge Muthangi under SD-I, O&M Division No.VIII, Patancheru-.
Arresting heavy water supply leakage on 700mm dia MS surge vessel inlet from existing on 2375mm dia MS pumping main of KDWSP Phase-III from Godakondla to Gungal at Godakondla pumping station under SD.No.I of O&M Div.No.XI, Sahebnagar
Laying of Pipe Drain Rajeev Gruhakalpa to YSR Colony and Laying of CC Road at H.No.519/1 to Old Road in Division No. 2 in Badangpet Municipal Corporation under General funds 2024-25
laying of pipe drain from plot no 60 Ramesh (H) to colony entrace at treseure colony phase-2 in Division no 8 in Badangpet muncipal corporation under municipal Gneral funds( work Reserved for SC)
Lowering and Providing of RCC slab over CRS masonry air valve and scour valve chamber and shifting of Air valves on 1200 mm and 800mm dia PSC gravity main from Hydernagar to Alwal from Ranga Bhujanga Theater to Deewan Dhaba under Hydernagar Section, SD-II O&M Division No.XXI Control Room Secunderabad
Manufacturing, supply, delivery, lowering, laying, jointing, testing and commissioning of 1000mm dia MS gravity main of KDWSP Phase-I from Zoo Park Parking gate to Zoo park third level parking entrance for facilitating ending ramp of Grade Separator fly over at Bahadurpura X road under KWS Monitoring section, SD.No.II,O&M Division-XI
Manufacturing, supply, delivery, fixing of 200mm dia DI/DF Air valve with Gate/Sluice valve with required specials to replace the damaged CI double barrel air valve on 800mm dia PSC gravity main from Lingampally to Borabanda at Hindu Grave Yard, near Hitech city flyover under Lingampally section, O&M Div.No.XXI, Control Room.
Manufacturing, supply, delivery,lowering,laying, jointing,testing and commissioning of 1000mm dia MS Gravity main from Autonagar to Beerapagadda at Uppal X Roads for facilitating construction of Grade Separator/Flyover from Hyderabad to Warangal Highway at Uppal Junction under Moula-Ali section, SD-III of O&M Div No: XI Saheb nagar.
Arresting heavy water supply leakage on 1200mm dia PSC gravity main of Phase-IV from Singapur to Lingampally by providing new 200mm dia Air valve and Gate valve with required specials at Ch No 345 and at Ch. No. 346 near Visaka Road under Singapur Section, SD-IIIO andM Division NoVIII Patancheru
Manufacturing, Supply, Delivery, Lowering, Laying, jointing, testing and Commissioning of 1000mm dia MS Gravity main of KDWSP Phase-I from Jupiter diesel service to Allhamduillah juice center for facilitating grade separator fly over from Aramghar to Zoo park at zoo park under KWS Monitoring section, SD-II of O&M Div.No.XI, Sahebnagar
Manufacturing, supply, delivery,lowering, laying, jointing, testing and commissioning of 1600mm dia MS gravity main of KDWSP Phase-II RingMain-I from Nafees garden function hall to Royal steel traders at Bandlaguda X road for facilitating the construction of box drain by GHMC under KWS Monitoring section, SD-II, Transmission. Div.III, Sahebnagar
Manufacturing, Supply, Delivery, lowering, laying, jointing, testing and commissioning of 1600mm dia MS gravity main of KDWSP Phase-II Ring Main-II from Uppal Bus stop towards LB Nagar (PNo.SC28) to Police outpost Uppal X Road for facilitating the construction of flyover by MMC under KWS Monitoring section, SD-II, Transmission Division No.III, Sahebnagar
SPECIAL REPAIRS TO EXTERNAL WATER SUPPLY PIPE LINE AND CONNECTED ITEMS FROM MAIN PUMP HOUSE TO OFFICERS MD ACCN AND CONNECTED AREA AT ASIF NAGAR UNDER GE GOLCONDA
Laying of UGD Pipe line at Old Neredmet from 28-72 to 28-83 in Division No.140,Malkajgiri Circle-28,GHMC (Reserved for Vaddera or Sagara Communities)
Submersible Pumpset Repairs and Maintenance material and Laying & Jointing HDPE Pipe Line work at:- Road No.36, Main Road Park Jubilee Hills, GHMC Circle-18,Khairathabad Zone, GHMC
Remodeling of UGD pipe line from Hno.4-56 to Hno.4-13 in Gangaram in Hafeezpet ward no.109, Chandanagar Division-21, Slp Zone, GHMC. (Maintenance Work)
Laying of CC Road & SWG Drain Pipe Line from H.No.3-7-625/1 to Existing Slab at Vavilalapalli, 47th Division estiamte cost of Rs. 15.00 Lakhs. (Recall)
Construction of Storm water Drain Pipe Line from Jitta Sudhakar Reddy (H) to Gopal Reddy (H) at MBR Nagar in Ward No.09 at Ibrahimpatnam Municipality under MGF
Laying of SWG 300 mm dia pipe line at sub lanes of Owaisi Play ground and Masjid e Kala in Reethigally under Golconda-67, Cir-13, KZ, GHMC
Laying of SWG 300 mm dia pipe line from 9-11-247/42 to Zamali Darwaza and beside Dargah in Rethigally under Golconda-67, Cir-13, KZ, GHMC
Laying of PVC pipe line from Ramulu Naik Hospital to BNR colony of 6th ward under Tender Premium amounts of 14th FCG 2015-16(Reserved for sc Societies)
Construction of Storm water Drain Pipe Line from Chintulla Ramulu (H) to Moddu Yadi Reddy (H) in Ward No.15 at Ibrahimpatnam Municipality under MGF.tnam Municipality under MGF.
Laying BT road on existing damaged road including restoration of trench cut for water supply pipe line machabollarum to jonnabanda road in ward no.133 of Alwal circle.
Laying of SWG Pipe line in from H.No.4-192/04 to H.No.4-192/17 at Dommara Pochampally village in Dundigal Municipality under General Funds 2019-20
Laying of 160 mm dia HDPE Pipe line and 6" sluice Valve at Vikas school front in div no.42 (General funds) (Reserved for BC Waddera Individual & Societies)
Supply,delivery and laying of 110mm dia PVC pipe line from Budegam Narsaiahy hosue to Radha Krishna house at 5th ward in Kodad Municipality under Municipal General Fund.
Laying of NP2 600mm dia SW pipe line from Bilala Beef Shop to Jamia Masjid lane via 19-2-184/17 at Ramnaspura divn (RESERVED FOR ALL WLCCS)
Laying of Strom Water Drainage pipe line from Veerabhdraiah (H) to Mustafa (H) in Padmavathi Colony Ward No.23 in Pedda Amberpet Municipality under General Fund(2nd call).
Laying of 250mm dia SWG pipe line from H.No:8-4-369/240 to 8-4-369/209/A Banjara Nagar under Erragadda Section, SD-II, O&MDn.VI.
Laying of 100mm & 150mm dia DI water supply pipe line from Hitech Hotel to GF15, Jyothi Nagar Site-III, Borabanda under SPR Hills Section, SD-II, O&MDn.VI.
Remodelling of UGD pipe line in Satyanarayana Enclave, maktha in Ward No.108, Miyapur Division No.21,WZ,GHMC (Reserved for SC,ST and Waddera Societies)- Re Call
Remodeling of UGD Pipe line from H.No.3-9-294 to H.No.3-9-279 at Saraswathi Nagar in Ward.No.12 Mansoorabad of Hayath Nagar Circle-3, GHMC.
Construction of Catchpits and removing of silt in Storm Water RCC Pipe line Opp : Icon Study Center in Ward No.12, Mansoorabad of Hayath Nagar Circle-3, GHMC
Laying of 600MM RCC Pipe line from Radhika X Road to H.NO.1-1-190/8 in Ward No.2 Dr. A.S Rao Nagar of Kapra circle,GHMC.
Laying of SWG Pipe line in B.Chandra Shekar Reddy Colony from Mogulamma (H) to Rangaiah (H) in Dommara Pochampally village at Dundigal Municipality under General Funds 2019-20
Laying of RCC 600mm dia Storm water drain pipe line at Opp.Pudami school and KLN.Sastry house to existing Suddakunta nala at Dwaraka nagar in Boduppal Municipality (Emergency Work)
Construction of Strom Water Drain by Laying 600mm dia. NP2 Class pipe Line at Vijay Diagnostic Lane in Himayathnagar Ward, Amberpet Circle-16, SBZ, GHMC (Rs. 9.00 Lakhs)