Loading…
Loading…
13,277 results • Best match
Laying and Dismantling of MS Pipelines of Various Sizes in Purewa Top and Bottom (East Section) for Monsoon Preparation, Dudhichua Project
Statutory testing 10 years testing of underground Auto LPG vessel connected pipelines and other associated works at 2 ALDSs in UPSOII
Emergency Work (M/o Expressway MSPS/SPS Sewer line (Shifting of 700 mm dia Sewer Rising Main Line at Ch. 2.360 on Noida Gr. Noida Expressway LHS of Noida Gr. Noida Expressway at Sector 96 B due to Construction of major under pass) Noida
Construction of Sumpwell for Village-Chhalera, Sec-44 and Group Housing Society in Green Belt infront of G.H. Plot No-8A Sector-44 and P/L Rising Main Line from GH-D-8A Sec-44 Sumpwell to Nr H-Block Sec-44 Sumpwell, Noida.
Ward No 2 Near Madan Lohar House Mini Bore well and Extension of Pipeline Work.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Government Office; Supply and Laying of water pipe line under the railway track as per attached scope of work; Service Provider, and Installation of ... MS pipe line under ...
Laying of 160mm M.S./DI-K7 Raising Main Pipe Line From Tube Well to Raising Shifting Work in wardo ke andar NPP Tanda. (1000 MTR)
160 MM HDP PIPE LAYING AND INTER CONNECTION WORK OF STATION ROAD TO SHANKAR KI CHAKKI AND CONNECTED STREET IN WARD NO 18 RAM NAGAR NAGAR PANCHAYAT KHAGA
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Nagar Panchayat Auraas Unnao ke Vibhinn Wardo Me Pipe Line Vistar Ka karya; Pipelines; Service Provider
As per tender document
ward no. 48in Shivnagar for newly constructed tube well, 150 mm DI pipeline 100 m and 160 mm diameter PVC pipeline 500 m extension work
Work of Shifting DI K-7 pipeline in from jalkal parisar gate to ice factory and supply and laying 102 mtr DI K-7 pipeline.
GEOTECHNICAL INVESTIGATION FOR PLANT AREA AND ASH PIPELINE CORRIDORINCLUDING NALA CROSSING
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Laying, Jointing, Testing, Commissioning and Trial Run of Pipe Line Extension Work and Providing Functional Household Tap Connections (FHTC) in Existing, New Water Supply Line, in Village Water Supply Scheme, District Banda under JJM on Turnkey Basis
Sarna Gaon mein nav-nirmit pump house se 8 inch main pey-jal distribution line vistaar ka karya.
Ward No. 01 Radheshyam Phase 01 mein Shyam Vatika Gate se hote huye ID Public School tak, Bob Tyagi ke makan se Prem Chand Tyagi ke makan tak, Manoj Kumar Tyagi ke makan se Vijay Kumar ke makan tak, Rajesh Tomar ke makan se Vinod Yadav ke makan tak
Ward No. 01 Radheshyam Phase 01 colony mein Jasveer Devi ke makan se Poonam ke makan tak aur Arjun Tyagi ke makan se Tajendra Kumar ke makan tak aur Jaspal ke makan se Anil Kumar ke makan tak aur Ashok Kumar ke makan se Sonu Kumar ke makan tak, Sure
Sarna Gaon mein Rawli road se Birju Pandit ke makan tak, Birju Pandit ke makan se Rajveer ke makan tak, Rajveer ke makan se Sunil Tyagi ke makan tak, Nathu Tyagi ke makan se Monu ke makan tak va aage ki aur badhate huye Pritam ke makan tak evam anya
Ward No. 02 (Sahbiswa) Nav-nirmit Pump House se Jalalpur Road hote huye Trimurti Vihar mein Bijendri Tyagi ke makan se Yashpal Singh ke makan tak evam Deepak Singh ke makan se Musafir Ram ke makan tak, va Saroj ke makan se Parmindra Mahesh ke makan
Sarna Gaon mein Raju ke makan se Neeraj Pradhan ke makan se hote huye Dayanand Tyagi ke makan tak, Jitendra ke makan se Rakesh ke makan tak, Yash ke makan se Kanti ke makan tak, Dushyant Tyagi ke makan se Jai Bhagwan ke makan tak, Yuvraj ke makan se
Sarna Gaon mein Bobi ke makan se Satish ke makan tak, Jaikishan ke makan se Subhash ke makan tak, Narendra Tyagi ke makan se Sonu ke makan tak, Naresh ke makan se Raju ke makan tak, Ghanshyam ke makan se Omprakash ke makan tak, Rampal ke makan se Yog
Sarna Gaon mein nav-nirmit pump house se 8 inch main pey-jal distribution line vistaar ka karya.
PIPE LINE EXTENSION 5.47 Km AND HOUSE CONNECTIONS Works 298 Nos 1 No NEW TUBE WELL IN NEW EXISTING WS LINES with all materials Labour t p etc
PIPE LINE EXTENSION 11.25 Km AND HOUSE CONNECTIONS Works 1836 Nos 1 No Rebore Tube well IN NEW EXISTING WS LINES with all materials Labour t p etc
PIPE LINE EXTENSION 2.77 Km AND HOUSE CONNECTIONS Works 302 Nos 1 No Rebore Tube well IN NEW EXISTING WS LINES with all materials Labour t p etc
Line no 01 Ward No.01 Basant vihar evam Khushhalpur ki Vibhinn galiyon main 110 mm Vyas ki PVC pipe line Bichane evam Jodne ka karye.(1224 mtr)
Laying 110mm HDPE Pipe Line work in mohalla sarairafi ward no 01 from royal garden Mod Basta road to chuna bhatti and nurani masjid to nurani madarsha
13- Installation of 110 MM PVC Pipe Line for Water Supply in Ward No 13 Mo Pukhtabazar East from Paramhans Ashram to Pawan House and Links Streets.
work no-22 ward-20 Mohan nagar jone antargat ward-20 bhopura me payjal aapurti hetu 3000 meter 110mm vyas ki HDPE pipe line dalne ka karya
Pipe line Extension and strenthaning of road at Ikauna Sitadvar road Durga Mandir to Thakur Prasad Verma ke makan in ward no 2 moh. Bechubaba, NagarPanchayat Ikauna.
WORK 13E INDRAPURAM ISTH WARD 79 NAYE KHAND 02 MAI VIBHIN ISTHANO PAR 110 EVAM 160MM VAYAS KI 3065 METER HDPI PAYJAL PIPE LINE BICHANE KA KARYE
PALIKA KE MOHALLA AALDARMIYAN WARD NO 1 VE MOHALL ARYAPURI WARD NO 28 NAI BASTI AADI MEIN 90MM KI 2500 METER PVC PIPE LINE BICHANE KA KARYA