Loading…
Loading…
13,302 results • Best match
Rajbhawan colony stith awas no type 5 ke awas no 33 se 36 tak ke awaso vahya sateh ka sudharikaran toote hue chajjon ki marammat shatigrast drainage pipe ke sthan per nai pipe line bichane avem anya civil karya.
WARD NO. SAKET NAGAR NEW BASTI SHREE SHREE JYOTI SHANKAR MISHRA RAISHREE KE MAKAN TAK SHREE RAMPRAVESH MAURYA SE HARENDR SINGH/MAMU KE DUKAN SE SAMBHU NATH SINGH SE MUNNA RAISHREE SE ARVIND RAI TAK PIPE LINE VISTAR KARY
Work no-12 Mohan nagar zone antargat ward 37 Shalimar garden me Chaudhary building material builders se lekar makan no-465 80 futa road tak 160mm vyas ki kul 250 mtr PVC payjal pipe line bichakar milan ka kerya
WARD NO 22 RAMESH NISHAD SE PRABHAKAR SINGH TAK SUDARSHAN CHAURASIYA TAK, RADHEY CHAURASIYA SE AKHILESH KANNOJIYA TAK NITIN SHRIVASTAVA SE VERMA JI TAK FANISH SHARMA KE MAKAN SE CHANDESH JAISWAL SE SURAJ KUSHWAHA TAK PIPE LINE VISTAR KARYA.
Rajbhawan colony stith awas no type 5 ke awas no 41 se 44 tak ke awaso vahya sateh ka sudharikaran toote hue chajjon ki marammat shatigrast drainage pipe ke sthan per nai pipe line bichane avem anya civil karya.
11. NPP Gursarai Mohalla Narayanpura GIC School ke pas ek bada bore karne ke pashchat Mohalla Narayanpura Ward no 08 and Mohalla Parkota Daxini Ward no 19 me Pipe line Apurti sahit bichhane and Stand Post Lagane ka Karya
Pipe line Extension- 63mm Dia. to 110mm Dia, Functional Household Tap Connection (FHTC) works (200) in New / Existing W/S Distribution main with all materials, labour, T and P etc. complete in Sardarnagar Block at Khairabad W/S Scheme
Laying of 110 mm HDPE Pipe Line From Chairman Sahab Furniture Store to Master Nandram house Mohalla Kila bharat Nagar Length 640 Mtr./dr. rizwan house to jahir house Mohalla Hasanpura length 330 mtr total length 970 mtr. kiratpur.
Rajbhawan colony stith awas no type 5 ke awas no 25 se 28 tak ke awaso vahya sateh ka sudharikaran toote hue chajjon ki marammat shatigrast drainage pipe ke sthan per nai pipe line bichane avem anya civil karya.
Pipe line Extension- 63mm Dia.to 110mm Dia, Functional Household Tap Connection (FHTC) works (325) in New / Existing W/S Distribution main with all materials, labour, T and P etc. complete in Sardarnagar Block at Rampur Rakba W/S Scheme
WARD NO 25 SUGRIV GOND KE GHAR SE SURENDRA KUSHWAHA TAK, MANGLI TOLA MAIN ROAD SE RITU CHAUHAN TAK, KESHAW PRASAD SE VISHAL SE KIDEZ SCHOOL TAK, SHIV KUMAR GOND HOTE HUE DHARMENDRA CHAUHAN TAK PIPE LINE VISTAR KARYA.
Rajbhawan colony stith awas no type 5 ke awas no 33 se 36 tak ke awaso vahya sateh ka sudharikaran toote hue chajjon ki marammat shatigrast drainage pipe ke sthan per nai pipe line bichane avem anya civil karya.
Zone No.-20 Zonal contract for all works including pipe line, sanitary works, Road and other wood works etc. in all service building staff quarters & level crossing falling in between sonenagar(Excl.) to Garhwa Road (Excl.) under ADEN/JPL.
Laying of 110 mm dia PVC Pipe line 300 MTR From H.No. 130 Wali Gali to H.No. 170 Wali Gali Via H.No. 82 and 68 Wali Gali in Barra-8 B Block Wad No. 45 Kanpur.Ward No. 45 Kanpur
Laying of 110mm HDPE Pipe line Ward No-24 Moh. Julhan From Ayyub house to Faheem house length-26mtr/ From Shahid house to Shamim house Ahmad length-28mtr/From Javed house to Shahid Ahmad length-27mtr/ (Total length-81mtr)
Rajbhawan colony stith awas no type 5 ke awas no 21 se 24 tak ke awaso vahya sateh ka sudharikaran toote hue chajjon ki marammat shatigrast drainage pipe ke sthan per nai pipe line bichane avem anya civil karya.
Pipe line Extension/ Replacement of 63 mm Pipes 1.500 km Repairing work of Pump house OHT Construction of Staff Quarter 1 No. Functional House Tap Connections (FHTC) works (304) and other appurtenant works in Udotpura Jagir village ws Scheme
REPAIR/MAINT OF INTERNAL/EXTERNAL ELECTRIFICATION SYSTEM, B/R WORKS AND OTHER CONNECTED WORKS SUCH AS FIRE FIGHTING EQPT, WATER SUPPLY PIPE LINE SUBMERSIBLE PUMP AT WATER SUPPLY INSTALLATION AT PRABUDH VIHAR (PCDA) DEVIKHERA UNDER GE E/M LUCKNOW
SPL REPAIR TO REPLACEMENT OF VARIOUS ITEMS IN ELECT SUPPLY AT KANPUR CANTT, PROVN OF DESERT COOLERS, ACS AND WATER COOLERS AT 9 SIKH LI AND PROVN OF WATER SUPPLY PIPE LINE TO CHILDREN SCHOOL UNDER GE (I) KANPUR
Survey investigation design supply laying commissioning and testing of sewer pipe line in lateral branch sewers and house connections road reinstatement and its appurtenant works in sewerage district 3 part 1 phase 1 in Lucknow city under AMRUT 2.0
Rajkiya Colony Laplas colony sthit Awas No.-A-704, Shreni-5 ke dono jeernasheern bathroomon ko pipe line badalte hue navinikaran ka karya, purani avem tooti hui kitchen top avem sink badalne ka karya avem anya avashyak marammati karya.
Laplas Colony sthit Awas No.-A-803, Shreni-5 me aa rahi seelan ke rokthaam hetu dusre avshesh bathroom ke jarjar pipe line ko badalte hue bathroom ka navinikaran, bathroom ke shatigrast darwaze badalna avem anya avashyak marammati karya.
Laying of 110 mm dia P.V.C pipe line in Ward 12 shobhapur me - shiriya pandit travels ke samne se kabristan tak , ashok ke yha se satish ke yha tak aur mandap ke samne pyaare lal ke makaan tak I
Laying of 110 mm dia P.V.C pipe line in Ward 12 shobhapur me - shiriya pandit travels ke samne se kabristan tak , ashok ke yha se satish ke yha tak aur mandap ke samne pyaare lal ke makaan tak I
Customized AMC/CMC for Pre-owned Products - CAMC AND OPERATION OF MEDICAL GAS PIPE LINE WORK ENTIRE EXISTING SYSTEM AT VARRIUS SITE AT UPUMS CAMPUS SAIFAI; AS PER SCOPE OF WORK; Comprehensive Maintenance Contract (CMC); AS PER REQUIRED; Yes
line expansion work. Work of expansion of 75 mm dia GI pipeline from Chopan Road in extended area Ga (Q3), Expanded area work of expansion of 75 mm dia GI pipeline from Alauddin house to Gym in Ward 14 Ahm (Q3), Expansion work of 75 mm dia GI ... GI pipeline from ...
Construction of OHT TW BW PH SQ HC Laying and Jointing of Distribution System Rising Main and other appurtenant works
Construction of OHT TW BW PH SQ HC Laying and Jointing of Rising Main Distribution System and other appurtenant works
CONSTRUCTION OF OHT 800 KL/16mt, PH, SQ, BW, Laying and Jointing of rising main, DS and House Connection Works
Construction of OHT TW BW PH SQ HC Laying and Jointing of Rising Main Distribution System and other appurtenant works
Construction of OHT TW BW PH SQ HC Laying and Jointing of Distribution System Rising Main and other appurtenant works
Construction of OHT TW BW PH SQ HC Laying and Jointing of Rising Main Distribution System and other appurtenant works
Construction of OHT TW BW PH SQ HC Laying and Jointing of Distribution System Rising Main and other appurtenant Works
Civil Works as Pump House RCC OHT Rising Main Distribution System Staff Quarter Ground Water Recharge and other Related Works
Construction of OHT TW BW PH SQ HC Laying and Jointing of Rising Main Distribution System and other appurtenant works
Civil Works as Pump House RCC OHT Rising Main Distribution System Staff Quarter Ground Water Recharge and other Related Works
Construction of OHT TW BW PH SQ HC Laying and Jointing of Rising Main Distribution System and other appurtenant works
Construction of TW, Pump House, Staff Quarter, OHT, laying of distribution and rising main, SCADA, renovation of existing infrastructure etc
Construction of OHT PH TW House connection and laying of pipe lines
Pipeline extension work in the old tehsil fair ground in Satianpura ward no. 12 in Kulpahar Nagar Panchayat.
90,110 mm diameter PVC pipeline expansion work behind Laxmi Hospital in Nagla Mirza Chhota in Ward No. 16.
Ward-3 Hathipur Durbal Ashram From House of Arvind Gupta to House of Indrapal Chaurasiya Pipeline Extension work.
Pipeline extension work In front of Pitamra Palace near canal in Hatwara Ward No. 6 Nagar Panchayat Kulpahar
3- Ward no 4 oran me raja traders ke samne borewell ki sthapna aur pipeline bichane ka karya.
Repairing of wire mesh and pipeline work of Broiler Farm Shed No. 01 to 06 at CARI, Izatnagar
MOH. DARBARKHURD RETEWALA CHADIYAN WARD NO 10 ME 90 MM LAGBHAG 910 MTR PVC PIPELINE BICHANE KA KARYA
Temp. Diversion of Kakri Industrial pipeline at railway bridge Kakri due to expansion of railway bridge at IWSS.
Providing one no. water reservoir with pump house near GM office and miscellaneous pipeline work at Khadia Area
9. Nagar Panchayat Nanauta ke Mohalla Afganan Ward No. 9 mai Vibhinn Sathano par Pipeline Dalne ka karya.
prince petrol pump to green city road shamsuddin darshan rathor shabbir rakesh, main chaurhaha to devendra bhadauriya pipeline