Loading…
Loading…
229 live93 closing this weekmost from PHE and MUNICIPAL AFFAIRS DEPARTMENT
229 results • Best match
OandMofDistSystem and Rising Main Pipeline (CI/DI/UPVC) and IEP of Different Ground Based PWSS for arsenic affected Saguna, Boaliaand adjoining mouzas at Santipur Block for the period of 361Days under NADIPHED
Annual Operation Maintenance and Emergent repair of pipe line of distribution system and Rising main and IEP of Jot Gopal Piped Water Supply Scheme at Englishbazar Block under Malda Division, PHE Dte. in the District of Malda. (Period from 01/10/2026
Annual Operation Maintenance and Emergent repair of pipe line of distribution system and Rising main and IEP of Mahammadpur Piped Water Supply Scheme at Old Malda Block under Malda Division, PHE Dte. in the District of Malda. (Period from 01/10/2026
Laying of Rising main in between Tube Well -2 (at OHR site) and Distribution Line and FHTC AND PIPE LINE AT JENARAR PARA under BHATAR Z-I PWSS in BHATAR Block under Durgapur Sub-Division under Burdwan Division, P.H.E. Dte. (SM/08033)
modification of inlet and outlet pipeline and online test kit lcm 20
INSTALLATION OF SUBMERSIBLE PUMP, PIPELINE WITH TAP WATER AT BIRSHIBPUR PRIMARY SCHOOL
OandMDistsystemand Rising Main Pipeline (CI/DI/UPVC) and IEP of Different Ground Based PWSSfor arsenic affected Tarapur, Paschim Noapara, Radhakantapur, ParniamatpurKalaighata adjoining mouzas at RanaghatI Block for the period of 361 Days underNADI
MS Elbow fittings with Nut, cone and ferule for sanding pipe line length 40mm, OD- 19mm, ID-13mm, 1.25mm pitch, Length other side 42mm, OD 13mm, ID 07mm,1.5mm Pitch thread
OandMofDistSystem and Rising Main Pipeline (CI/DI/UPVC) and IEP of Different Ground BasedPWSSforarsenicaffectedareasof Duttaphulia ZI Duttaphulia ZIIAranghata Z-II adjoining mouzas at Ranaghat II Block for the period of 361 Days under NADIPHED
OandMofDistSystem and Rising Main Pipeline (CI/DI/UPVC) andIEP of DifferentGround Based PWSS forarsenic affectedareasofJoypurItaberia, Nasra Zone I Nasra Zone-II adjoining mouzasatHanskhali and Ranaghat II Block for the perio of 361 Days underNADI
OandMofDistSystem and Rising Main Pipeline (CI/DI/UPVC) and IEP of Different Ground Based PWSS for arsenic affectedareasoHalalpurKrishnapur Zone I, Matikumra, ArranghataZone Iadjoining mouzas at Ranaghat II Block for the periodof 361 Days underNADI
Annual Operation Maintenance and Emergent repair of pipe line of distribution system and Rising main of Sanjail Piped Water Supply Scheme at Old Malda Block under Malda Division, PHE Dte. in the District of Malda (Period from 01/10/2026 to 30/09/2027
Additional laying of Pipe line for improvement of FHTC functionality by UPVC pipe, Providing Functional Household Tap Connection (FHTC) for KANTHALANPUR piped Water Supply Scheme at Habibpur Dev. Block in the District of Malda under Malda Division,
Annual Mtc. Of pipeline and other misc works related to pipeline of Birpara State General Hospital W/S/S under Madarihat-Birpara Block within Alipurduar Division, P.H.E. Dte. .(For 12 months)
Day to Day Operation, efficient monitoring, maintenance and guarding ... including Raw Water Rising Main, Clear Water Rising Main and Ground Level Reservoir for Gangarampur Sub Surface Based PWSS (Eastern Sector) under Balurghat Division, PHE Dte.
Day to Day Operation, efficient monitoring, maintenance and guarding in all respect ... including Raw Water Rising Main and Clear Water Rising Main for Tapan Sub Surface Based PWSS (Western Sector) under Balurghat Division, PHE Dte.
Mtc. of pipeline (Distribution and rising main) S.V / SSP etc and Operation of Sluice valve related to daily supply of water to the consumers of Bolpur Sub-Divisional Hospital WSS under Bolpur Mech. Divn. PHED.
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe, Providing FHTC for DUBA KHOSKAN piped Water Supply Scheme at Gazole Block in the District of Malda under Malda Division, P.H.E.Dte. (2nd Call)
Construction of Approach Road Land Development and laying of pipeline at HW Site 2nd TW site of Kasmali PWSS scheme under Amta-II Block under Uluberia Sub-Division, under Howrah Division P.H.E. Dte.
Additional laying of pipeline at different habitations under the command area of Harop (Zone-II) PWSS of Bagnan-I block under Uluberia Sub-Division of Howrah Division, PHE Dte. (Location- Agunshi Bhunera Purnal)
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe and Providing FHTC for DUBA KHOSKAN piped Water Supply Scheme at Gazole Block in the District of Malda under Malda Division, P.H.E.Dte. (3rd Call)
OandMofDistSystem and Rising Main Pipeline (CI/DI/UPVC) and IEPof Different Ground Based PWSSfor arsenic affected Goalpur Zone I, Goalpur Zone II ,Nabla, Beharia, Nrisinghapuradjoining mouzas at Santipur Block for the period of 361 Days underNADI
OandMofDistSystem and Rising Main Pipeline (CI/DI/UPVC) and IEP of Different Ground Based PWSS for arsenic affectedareasofRamnagar, Chupria Zone IChupriaZone II Mamjoani adjoining mouzas at Hanskhali Block for the period of 361 Days under NADIPHED
Construction of boundary wall at HW site 2nd TW Site with Laying of pipeline at different places of Augmentation of Kanupat PWSS of Udaynarayanpur Block in Uluberia Sub-Division, under Howrah Division P.H.E. Dte.
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe an providing FHTC and Construction of Boundary Wall, Earth filling and Approach road at 3rd and 4th Tubewell Site for Kadirpur PWSS in Habibpur Dev. Block
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe,Providing Functional Household Tap Connection (FHTC) , Boundary wall,Aproach Raod at HW and 2nd TW site in for JIGIN piped Water Supply Scheme of Gazole
SPL REPAIR/ REPLACEMENT OF WATER PIPELINE FROM PUMP HOUSE NEAR BLOCK 19 TO BLDG NO 16, 17, 18 and 19 AT TURF VIEW COMPLEX UNDER GE (A) KOLKATA
Operation and Maintenance of Distribution System including Rising Main Pipeline (DI-K7 an K9) with IEP, House Service Connection, E/M works and Other Different Components of Dhupguri Municipal Piped Water Supply Scheme under Dhupguri Municipality, Dt
Operation and Maintenance of Distribution System including Rising Main Pipeline (DI-K7 an K9) with IEP, House Service Connection, E/M works and Other Different Components of Dhupguri Municipal Piped Water Supply Scheme under Dhupguri Municipality, Dt
OandM ofDistSystem and Rising Main Pipeline (CI/DI/UPVC) and Iron Elimination Plant of diff Ground BasedPWSS for arsenic affected Ukilnara Zone I Ukilnara Zone II Birnagar adjoining mouzas atRanaghat I Blockfor the period of 361Days underNADIPHED
Laying Distribution pipe line Orgonda (OHR Site) to Dhuapahari Village (Tail End) via Parusuli Village and Canal parh for Augmentation of BarasukjoraPWSS in Binpur-II Block within Jhargram District under Jhargram Division, PHE Dte.
Trail run for operating distribution system by regulating different valve including FHTC over 250 mm dia pipe line distribution network at Bonjemari Colliery area under RCFA Division-I PHE Dte. (w.e.f. 01.10.2026 to 31.03.2027)
Installation of Submersible pumpa with pipeline near Nimai Bera house at Jotebani, Fy-2025-26 Activity ID- 109912843
Shifting of Rising Main 900 mm Dia DI (K9),E pipe line at SH-9 (Bankura-Durgapur Road) from KM 35.740 TO KM 38.54 of Bankura - I, II and Barjora Block W/S Scheme (BRGF Ph - I Project) under Bankura Sadar Sub - Division of Bankura Division, PHE Dte.
Construction of boundary wall, Approach Road at 4th TW Site with Laying of pipeline at different places of Udang Zone-I PWSS of Amta-I Block in uluberia Sub-Division, under Howrah Division P.H.E. Dte.
OandMofDistSystem and Rising Main Pipeline (CI/DI/UPVC) and IEP of Different Ground Based PWSS for arsenic affectedSabdalpur, Goalsalua Zone I, Goalsalua Zone II adjoining mouzas at Ranaghat -II Block for the period of 361 Days under NADIPHED
OandMofDistSystem and Rising Main Pipeline (CI/DI/UPVC) and IEP of Different Ground Based PWSS for arsenic affectedGobindapur Zone I, GobindapurZone II Gayespur Zone I, Gayespur Zone II adjoining mouzas at Santipur Block for the period of 361Day
Construction of boundary wall, Intenal Pathway and Land Development including interconnection of Tube wells with DI pipes and Laying distribution pipeline at HW site of Augmentation of Bamunhati PWSS under Uluberia-II Block in Uluberia Sub-Div.PHE
Sinking of Additional Source to resolve tail end pressure along with allied works like Interconnection and Laying distribution pipeline, Construction of Pump House, Construction of KHARBA Piped Water Supply Scheme at Chanchal-I Block of Malda Distric
Repairing of distribution line, laying of HDPE pipe line, repairing of FHTC at Kalikamali village, Narayanpur village, Jamjuri village, Kashidanga village, Khayerbani village and Jamgram village under Jamgram PWSS under Barabani Block in the District
Electrical General work in connection with "Water balancing of South Tank with North Tank through underground pipe line with sump well, pump house & desilting, slope protection etc. of south Tank at Liluah under CWM/LLH"
REPAIR REPLACEMENT OF OLD RUSTED CI GI DI PIPE LINE FOR MAIN WATER SUPPLY LINE FROM FILTER HOUSE AT DEPOT AREA INCLUDING ENGR SUB PARK RHPD AND NEARBY LOCATION UNDER AGE EM OF GE BENGDUBI
Operation Maintenance of distribution system including rising main, FHTC, OHR of Thakuachak-I II W/S Scheme
Day to day Operation and Maintenance of Distribution system and Rising main pipeline (CI / DI / UPVC / HDPE /FHTC) and allied works, including Arsenic cum Iron Removal Plant of Modified Sujapur Sadipur Model (Capacity - 30.00 CuM/Hr) of MOKTARPUR P
Additional and alternative laying of laying distribution pipeline system for the sources constructed by GP authority to mitigate the water scarcity at Paschim Narit and adjacent area under Tajpur G.P.at Amta-II Block in Uluberia Sub-Division,HWH.
GUN METAL GATE VALVE 25MM BORE FOR TRANSFORMER OIL PIPE LINE OF BHEL EMUs AS PER KPA WORKSHOP DRG NO. ER/KPA/EL/TF.3HE.581E, ITEM 2.(Q FORM ATTACHED AT F/4 - F/5 ).
Upgradation of STPS New Intake Pipeline Corridor Road for Civil part (Phase-I) (Capex 2025-26)
Rectification or repairing of existing FHTC connection from /Each C.I./D.I./UPVC/HDPE/G.I./A.C. distribution pipeline with labour cost for cutting trench (1m X 0.9m X 1.2m,installation of Sluice valve for functional 571 FHTC under Malipakor Water
Estimate For Installation of pipe line with water tank at Kali bazar at Makarampur under Sarberia-II Gram Panchayat within Daspur-I Panchayat Samity.fund under 15th C,F,C, during the year (2026-27). Id no 109606837
Sinking of tube well (200 mm X 150 mm) upto required 90 m depth with installation of nos. vertical wet type submersible pump with necessary fittings at Garpurusottampur near Kaderiya Masjid at Ward No-14 and laying of pipe line at Uttar malik par