Loading…
Loading…
46,633 results • Best match
Laying of Distribution pipe line, Rising main pipe line, Pump House, Boundary Wall, with allied works of MANDARMANI its adjoining mouzas Water Supply Scheme within Ramnagar-II Block under Digha Sub-Division of Tamluk Division, PHE Dte.
Rising Main, Laying of DI (K7), gap filling of HDPE pipe, construction of sluice valve chamber for washout purpose in the command area of NARASINGPUR PWSS under Alipurduar Division, PHE Dte.
Construction of pump house, boundary wall, TW boring (by ODEX-165 method of drilling) and Rising main for 2nd TW site at Bandapani PWSS (Zone-II) under Alipurduar Division, PHE Dte.
Annual Operation and maintenance of 500 mm dia Rising Main from Searsole to Chinchuria under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. (w.e.f. 01.01.2024 to 31.12.2024)
Emergency repairing of 300 mm dia 350 mm dia rising main, construction of sluice valve chamber and other allied works under Amritnagar W/S Scheme under RCFA Division-I PHE Dte
Operation maintenance of distribution system and rising main CIDIACUPVC pipe of Kayadanga WS Scheme within the jurisdiction of Habra Sub-Division under Barasat Division, P.H.E. Dte.w.e.f. 1.07.2024 to 30.06.2025 12 Months
Balance work of 160 mm dia HDPE rising main at Joyrampur area and etc allied works at SAUTA of Aushgram-II block of SUATA PWSS under JJM of DWSD,PHE Dte
Laying, testing commissioning of Gopalpur Rising Main Partly with necessary fittings specials excluding cost of D.I. pipes including G.T. Road crossing by jack pushing method under Asansol Municipal Corporation. 3rd call
Restoration of road after dismantling and laying of 300 mm dia Rising Main at Lalbazar, Hijalgora, Pathachur village of Bijoynagar Housing Project W/S Scheme under RCFA Division-I PHE Dte.
Rising Main, Laying of DI (K7), gap filling of HDPE pipe, construction of sluice valve chamber for washout purpose in the command area of Malsagaon PWSS under Alipurduar Division, PHE Dte.
Construction of Pump House ,Boundary Wall, and Tube well Boring by Reverse Rotary method of drilling including Rising main for UTTAR KAMAKHYAGURI Piped Water Supply Scheme Under Alipurduar Division PHE DTE
Balance works related sinking of tube wells at Gangarampur village ,LDS with Jack pushing ,Rising main construction Switchroom and FHTC of Digha PWSS of Aushgram-I Block of DWSD,PHE Dte
Construction of Pump House ,Boundary Wall, and Tube well Boring by Reverse Rotary method of drilling including Rising main for UTTAR MAJHERDABRI Piped Water Supply Scheme Under Alipurduar Division PHE DTE
Cons. of pump house, boundary wall and Rising Main for Zone-II 4thTube well site at Aug. of Birpara PWSS of Birpara Sub-Division under Alipurduar Division, PHE Dte. (SM/14233)
Shifting of existing rising main for construction of new Pump House at Dendua OHR Campus under Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte
Design, Surveying, Engineering, Supplying and Construction, Erection, Installation, Testing, Commissioning of Fixed type Intake Jetty with pump house, Construction of Subs-station_ Raw Water Rising Main, Bank Protection_96 MLD_Minimum_ capacity WTP
Laying ,aligning of DI K9 rising main pipe and interconnection between 3 TW with OHR and other allied works of Augmentation of Roopganj piped W/S Scheme under DWSD ,PHE Dte
Laying aligning of DI K9 rising main pipe and interconnection between 5 tube wells with OHR and other allied works of Augmentation of Gopalpur PWSS under RCFA Division-I PHE Dte.
Laying of balance 400 mm dia K-9 rising main line with other allied works from Runakuraghat HW Site to Mallardihi and Dabar OHR under Chotkara Kanskuli WS Scheme. 2nd Call
Supply and Delivery of DI Specials for laying of Rising Main including interconnection for Chandri, Barabari, Gramohan and its adjoining mouzas Water Supply Scheme within Jhargram Block under Jhargram Division, P.H.E.Dte.
Annual Operation and maintenance of 500 mm dia Rising Main from Searsole to Chinchuria under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. (w.e.f. 01.01.2025 to 31.12.2025)
Emergency repairing work of 250 mm dia rising main of DP Colony and collecting main and other allied works under DP Colony W/S Scheme under RCFA Division-I PHE Dte.
Supply and Delivery of DI Specials for laying of Rising Main including interconnection for Patharnala, Uransol, Chakkua and its adjoining mouzas Water Supply Scheme within Jhargram Block under Jhargram Division, P.H.E.Dte.
Emergency repairing work of 700 mm dia rising main near Kalipahari railway bridge under Kalajharia to DVC more under RCFA Part-II water supply scheme under RCFA Division-I PHE Dte.
SPL REPAIR TO BLDG NO LA 13 AND SOLAR STREET LIGHTS AND EXTERNAL WATER SUPPLY DISTRIBUTION PIPE LINE AND REPLACEMENT OF EXISTING WATER SUPPLY PIPE LINE FROM MES WATER POINT TO SHAUGAON B AT BAGRAKOTE UNDER GE SEVOKE ROAD
Extension of pipe line from Gokul Digar House to Kajal Bag house At Matihana and Extension and Repair of pipe line and Tank from Srikanta Khilari house to Bimal Sing house At Matihana and Land levelling of Matihana SSK
Laying of 200mm Dia. Dl Pipe line (Supplied by DMC) and 110mm (OD) Dia. ,160mm (OD) Dia. HDPE (PE-100 and PN-6) pipe line (Supply, fitting, fixing) at Gopalmath (NH side extension), within Ward No- 35,Under DMC.
Laying of 200mm Dia. DI Pipe line (Supplied by DMC) and 110mm (OD) Dia.160mm (OD) Dia. HDPE (PE -100 and PN -6) pipe line (Supply, fitting , Fixing) at Nalanda Fortune Park, Gopalmath, within Ward No -35, under DMC.
Re_Drilling Maintenance of Pipe Line Minor Repairing of Pump House with Extension of Pipe Line along with Construction of Spout Chamber at 117/N Madhugari DTW Scheme at Mouza_Madhugari Block_Karimpur_I in the District of Nadia under the Executive E
CIVIL WORK a) INST OF SUBMARSIBALE PUMP WITH TANK AND PIPE LINE RADHAGOBINDA MANDIR AT PASCHIM PANCHKAHANIA 100M b) INST OF SUBMARSALABLE PUMP WITH TANK AND PIPE LINE INFRONT OF SUKUMAR SENAPATI HOUSE NEAR MAIN ROAD 100M AT PANCHKAHANIA
Set of Air pipe connection assembly for BA panels EP contactors of Electric Loco as per Drg No.TRS/ACL/P/621. 1) Air pipe line assembly for EP line contactor - 07 Nos/Set .2) Air pipe line assembly f
Set of Air pipe connection assembly for BA panels EP contactors of Electric Loco as per Drg No.TRS/ACL/P/621. 1) Air pipe line assembly for EP line contactor - 07 Nos/Set .2) Air pipe line assembly fo
INSTALLATION OF 1.5 HP SUBMERCIBLE PUMP PIPE LINE AND WATER RESERVER
Installation of submersible pump with pipe line near Ser Ali Khan house at mouza- Chhototara under Karsa Gram Panchayat within Garhbeta - III Panchayat Samity
Installation of submersible pump with pipe line near Natundanga Adibasi Nichu Para at mouza- Chanchagote under Karsa Gram Panchayat within Garhbeta - III Panchayat Samity
Road damage Restoration work at Guma-Prithiba Road from 2.00 km to 4.00 km due to Laying of clear water pipeline rising main from GLR at Ashokenagar Gaighata for Habra Gaighata W/S Scheme under PHE Dte under Barasat Highway Division - II
Road damage Restoration work at Digha-Gangapur-Balisha Road from 2.35 Km. to 6.55 Km. due to Laying of clear water pipeline rising main from GLR at Ashokenagar Gaighata for Habra Gaighata W/S Scheme under PHE Dte under Barasat Highway Division
Road damage Restoration work at Guma-Rajibpur-Balisha Road from 4.00 km to 8.680 km due to Laying of clear water pipeline rising main from GLR at Ashokenagar Gaighata for Habra Gaighata W/S Scheme under PHE Dte under Barasat Highway Division
Road damage Restoration work at Bongaon-Jhawdanga-Panchpota Road from 8.70 Km. to 14.90 Km. due to Laying of clear water pipeline rising main from GLR at Ashokenagar Gaighata for Habra Gaighata W/S Scheme under PHE Dte under Barasat Highway Di
Road damage Restoration work at Habra-Kumra Road from 1.40 km to 8.90 km due to Laying of clear water pipeline rising main from GLR at Ashokenagar Gaighata for Habra Gaighata WS Scheme under PHE Dte under Barasat Highway Division - II in the
Maintenance of existing Water Pipeline for ward no 10,12,14 and 17 Zone_IV_CIVIL
Maintenance of existing Water Pipeline for ward no 04,09,15 and 16 Zone_II_CIVIL
Arrangement of PHE Water Pipeline and repairing door of 41, ICDS Centre
Water Pipeline from near Maliya Bibi Doughter of Anower to Mujibors House
EXTENSION OF DRINKING WATER PIPELINE FROM PUCCA BRIDGE TO BHAIRABPUR NAYEK PARA
CONSTRUCTION OF SUB MERSIBLE WITH WATER PIPELINE AT JAYKRISHNAPUR MOLLA PARA MASZID.
Construction of toilet , water pipeline and allied works at Barabazar High School
Maintenance of existing Water Pipeline for ward no 11,13, and 18 Zone_V_CIVIL
Construction separate toiletfor male and femalewith water pipeline system at ankrobarakadam GP
Repairing of Water pipeline from Masjidtala to Neoyaj Sk house at Dakshinpara