Loading…
Loading…
46,557 results • Best match
Laying of Distribution Pipeline At Vikash Nagar, from Pappu Shawas House to Govinda Majhias House via Vijay Thakuras House of W-No. 36, BOOTH-47 AMC.
Laying of distribution pipeline water from master para to mustafa House. at Neamatpur Saudagar mahalla 1-Ward no-59 Borough-Vlll Booth mo-107 282 Kulti
Supplying Sinking of 125 mm 50 mm 270 m deep Tube Well along with Submarshible Pump with laying of Pipe line at Kumarpur near Maity Manna Pally Booth no 61
Supplying Sinking of 125 mm 50 mm 270 m deep Tube Well along with Submarshible Pump with laying of Pipe line at Barbajitpur near Nilkamal Jana under Chakdwipa Gram Panchayat
Laying of pipe line tank with soak pits and chatal for drinking water in front of rankanki (89154904) under Laxmipur Gram Panchayat within Chandrakona-I Panchayat Samity, fund- 15th CFC
Supplying Sinking of 125 mm 50 mm 270 m deep Tube Well along with Submarshible Pump with laying of Pipe line at Brajalalchak near Das Palli Gurupada Ghorai booth 66
Extension of drinking water pipe line from BDO office to Basulia Rural Hospital at Basulia of Mouza- Basulia, J.L. No.- 105 under Satish Samanta Gram Panchayat within Mahishadal Panchayat Samity under 15th CFC Fund (2024-25) (Tied)
REPAIR TO ROOF SHEETS, CEILING, JOINERY, BOUNDARY WALL, SECURITY WALL, FENCING AND REPAIR/MAINTENANCE OF DIFFERENT SIZE CI/GI/DI WATER PIPE LINE, GATE VALVE AND MISC WORKS AT AIR FORCE STATION SALUA UNDER GE (AF) KALAIKUNDA
Construction of Installation of Over Head Water Resorvoir with Elevated Structure,Under Ground Water Resorvoir,Laying Water Pipe Line Including Rain Water Harvesting System For SWM Project in Ward No-5, Mohalla - Sarat Satabdi Sarani, Under Bansberia
Restoration of Pathashree road damaged by laying of drinking water pipe line from Jagita Sarda House to Khalpar Bypass Via Roy bahadur Via Projit Mondal To Nikfiil Ranjan Roy House Via Khardhya Math Via Bapi Naskar House
Set of flange and clamp for water pipe line/drain system of coaches consisting of 4(Four)items:- (1)Flange for chute pipe for lavatory size;-180x130x3.15mm.to sk.no.LLH-45/78,item No.-2,alt no-5(Five)
Supplying laying MS pipe line, sluice valve chamber, street stand post and other allied works within Amritnagar Rising main Distribution of Tirat Colliery under Augmentation (Part-II) W/S Scheme under RCFA Division-I PHE Dte.
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Sankrail W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. (For 12 Months).
Emergency work for different dia valve change, leakage repairing and other allied work of Khandra OHR rising main and Ukhra distribution pipe line of RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte.
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Banshia W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. (For 12 Months)
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Sashra W/S Scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. (For 12 Months).
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Nakrasuli W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte.(From 12 Months)
Operation and Maintenance of Rising Main,Delivery Main Pipe Line (CI/DI/HDPE/uPVC),F.H.T.C and all related structure of Gidhni Water Supply schemes within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Pukuria W/S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 months.
Operation and Maintenance of Rising Main,Delivery Main Pipe Line (CI/DI/HDPE/uPVC),F.H.T.C and all related structure of Kultikri Water Supply schemes within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Dahamunda W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. for 12 Months.
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Sonarimara W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. for 12 Months.
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Rohini W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. for 12 Months.
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Chhatinasol W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. for 12 Months.
Laying of rising main from Union Para River Bed side to Ballavpur CWR and distribution pipe line laying of Napur colony at Ballavpur W/S scheme under Zone-16 Part-II RCFA Div-I PHE Dte.
Laying, testing, commissioning of Rising Main Pipe line of Ismile CWR to Ismile Overhead Reservoir with necessary fittings, specials (excluding cost of D.I. pipes)under Asansol Municipal Corporation.(D.I. pipes supplied by the department).3rd call
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Alampur W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. For 12 Months
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all relatedc structure of Lalgarh W/S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Additional work supplying and laying of alternative rute for extra rising main of 250 mm dia DI (K9) and 200 mm dia HDPE pipe line with necessary allied works from Ramnagar H/W site to Mohal
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Ragra W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. (For 12 Months).
Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC with all related structure of 03 Three nos pipe water supply scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From 12 months
Operation and Maintenance of Rising Main,Delivery Main Pipe Line (CI/DI/HDPE/uPVC),F.H.T.C and all related structure of Kapgari Water Supply schemes within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Laudaha W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. (For 12 Months).
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Bhera W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. (For 12 Months).
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Pitanow W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. (For 12 months).
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Gopiballavpur W/S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months.
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Ramgarh Zone-II WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CIDI HDPE uPVC with all related structure of Lalgarh Bamal Mouza WS scheme Bamal mouza within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Khasjangal Dhansola W S scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From 12 Months
Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC with all related structure of 03 Three nos pipe water supply scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From 12 months
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Gopiballavpur W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC with all related structure of Silda Pond Base W S scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Baratilaboni Loagan W S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation and Maintenance of Rising Main,Delivery Main Pipe Line (CI/DI/HDPE/uPVC),F.H.T.C and all related structure of Balibandh Water Supply schemes within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Pitanow W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. (For 12 Months).
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Sashra W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. (For 12 months).
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Banshia W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte.(For 12 months)
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Bhera W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. (For 12 months).
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Alampur W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. (for 12 months)
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Gohalbura W/S scheme within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. (For 12 months)