Loading…
Loading…
46,552 results • Best match
IMPROVEMENT OF DRINKING WATER PIPELINE CONNECTION, ROAD REPAIRING ETC IN VARIOUS LOCATIONS IN WARD NO 03 UNDER BUDGE BUDGE MUNICIPALITY UNDER APAS SCHEME
Probable estimated cost for Laying Pipeline at Goswami Para at Ramdebpur at Ramdebpur Mouza under Rajnagar G.P. under Daspur-I Panchayat Samity
LAYING RISING MAIN DISTRIBUTION SYSTEM OF PIPELINE AND CONSTRUCTION OF VULVE CHEMBER PRAMANICK PARA TO DASPARAVIA SAU MANNA PARA AT SAN XIII, SANSAD-XIII (XV), UNDER DEHIMONDALGHAT-1 GP, SCHEME- 15TH CFC-14/23-24, ACTIVITY CODE- 67923747
Maintenance of water pipe line and other aligned work at different ICDS center in GP area under Ukhra Gram Panchayat under 15th FC (BG) CFCG, Scheme Code No.- (109967361)/15th FC (BG) CFCG/UGP/2025-26.
Installation of Submersible pump in Existing Rig Bore along with water pipe line connection from the house of Jalsa Oraon to the house of Etowa Oran, Part no-10/11 under Turturikhanda GP within Kumargram Block.
Installation of UPVC water pipe line interconnection in place of Akarsanagar Rakhi Bibi house to SK Mujibur Rahaman and from Bankim Sritikona Pry School to Syad Yahasin Ali house in ward no 22 within Midnapore Municipality
Extension of Drinking water Pipe line with Tank at four nos F P School under Chhora G P Area, Sansad No.- I-XXII within Chhora G.P. Scheme Code No- 15th FC (CFC) / 2021-22 (Sup) / 05
Operation and Maintenance of Rising Main, Delivery Main Pipe Line (CIDIHDPEuPVCF.H.T.C andall related structure 09 nos Standalone piped Water Supply schemes within Jhargram RWS Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Laying of 160 mm dia HDPE pipe line, 75 mm, 125 mm UPVC Pipe line for Augmentation of Rising Main System for distribution pipeline with interconnection along with road restoration at village Dogachhi, Block Karimpur-II under Nadia Divn, P.H.E.Dte
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Banspahari W S scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Baraberia W S scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From 12 Months
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC with all related structure of Lalgarh Bamal Mouza WS scheme Bamal mouza within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Jhitka W S scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From 12 Months
Sinking of Tube Well , Pump House , 150 cum GLR, Rising main pipe line, LDS, FHTC,etc. for GRAMOHAN AND ITS ADJOINING MOUJAS PWSS in JHARGRAM Block within Jhargram Sub Division under Jhargram Division, PHE Dte.
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Kechanda W S scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From 12 Months
Sinking of Tube Well , Pump House , 100 cum GLR, Rising main pipe line, FHTC etc. for KANKRIDAHI AND ITS ADJOINING MOUJAS PWSS in GOPIBALLAVPUR-I Block within Jhargram Sub Division under Jhargram Division, PHE Dte.
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC with all related structure of Silda Pond Base WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure i.e. OHR etc. of Khasjungle WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Bahadurpur W S scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From 12 Months
Laying and alinging of DI K9 rising main pipe line supplying DI Specials valves and allied works under command area of Gopapur mouza for Augmentation of Gopalpur piped W/s Scheme under DWSD,PHE Dte
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Domsole W S scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Lakat W S scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Khamar WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Khasjangal Dhansola WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Aulia W S scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From 12 Months
Annual Operation and maintenance of Distribution pipe line from 500 mm dia. Rising main to Topsi and Kunustaria G.P under RCFA Part- II Water Supply Scheme under RCFA Division-I PHE Dte. (For 365 Days)
Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC with all related structure of 3Three nos pipe water supply scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. For 12 Months
Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC with all related structure of 3Three nos pipe water supply scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Shifting of PHE pipe line 250 mm dia rising main due to Eastern dedicated freight corridor construction at Amritnagar Rail Gate Lodge under RCFA Division-I PHE Dte. (CH 199-630 to 199-690 KM)
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Birkarnar W S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Laying distribution pipeline Rising main and FHTC for Garmal PWSS in Salboni block under Midnapore Division PHE Dte. PART_B
Extension of water pipeline from Sunil Sahoos house to Kanu Sahoos house at Haripur Sansad J.L.No-215 Plot No.-179-195 via 259 ID -67737733
Rep and RENOBATION OF water pipeline with new tap GP Office WITHIN DHABAN GRAM PANCHAYET UNDER 14TH CFC BG FUND DURING THE YEAR 2020 21
Installation of Submersible Pump with Pipe line at Radhapara ,JL NO- 303 ,under Berajal GP. Activity ID- 58426126
Interconnection work for rising main of Chotkara Kanksuli to Roshna OHR including MS work in existing rising main at Runakuraghat under RCFA Division-I PHE, Dte
Laying of 200 mm. dia D.I. Pipes for Rising Main at J.R.R. Road new Tube Well in Ward No. 2.
EXTENTION PIPE LINE FOR DRINKING WATER FOR UTTARGERIA VILLAGE FROM BELGERIA SSK PIPELINE AT UTTARGERIYA UNDER JHENTLA GP
185_Instalation of Sub Marcible with Pipe Line under Ramchak GP at Sudampur 1 near Harekrishna Adhikary (pipeline) (57903612)
Laying of Pipeline with pump house at Dandipur Adak Para under Dandipur High Sansad at Mouza Dandipur JL NO-62, Plot No-, With In Birsingha GP, under Ghatal Panchayat Samity under the fund of 15 th C.F.C.G (TIED). for the year 2022 - 2023, Annua
Cons. Of balance portion of pump house, boundary wall, rising main, laying of DI and UPVC pipeline for Aug. of Banchukamari PWSS under Alipurduar Division, PHE Dte.
EXTENTION OF WATER PIPELINE SYSTEM WITH GENERATOR SUPPLY FROM MAHIDHAR PATRA TO YUVARAJ PATRA AT SHIBPUR PATRAPARA UNDER SHIBPUR MOUZA, JL NO-103
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in KAPILESWARPUR water supply scheme
Operation and maintenance of distribution system, rising main and allied pipelines, valves, valves chambers, stand posts including repairing of FHTC connection and providing new FHTC connection for Kanmari water supply scheme (Z-I)
Operation and maintenance of distribution system, rising main and allied pipelines, valves, valves chambers, stand posts including repairing of FHTC connection and providing new FHTC connection for Kalinagar water supply scheme (Z-II)
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in MAGURALI water supply scheme
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in PATUA water supply scheme
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in DHANYAKURIA water supply scheme
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines for Chutkia Radhanagar water supply scheme, Minakhan block under Hasnabad Sub-Divn. P.H.E. Dte. (Period - For 6 Months).
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in HAROA water supply scheme
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines including FHTC conection (CI/DI/UPVC/HDPE/GI), valves, valves chambers, stand posts in AKIPUR water supply scheme