Loading…
Loading…
46,552 results • Best match
Operation and maintenance of distribution system, rising main and allied pipelines, valves, valves chambers, stand posts including repairing of FHTC connection and providing new FHTC connection for Chunchura water supply scheme
Operation and maintenance of distribution system, rising main and allied pipelines, valves, valves chambers, stand posts including repairing of FHTC connection and providing new FHTC connection for Fakirtakia water supply scheme
INSTALLATION AND LAYING PIPELINE AT BHARAMALPUR MATH FOR AGRICULTURE AT BHARAMALPUR BALIGORI-II GRAM PANCHAYAT UNDER TARAKESWAR DEVELOPMENT BLOCK DISTRICT HOOGHLY
Laying Pipeline from Nimtala to Rajab Ali house at Sadichak under Monoharpur-II Gram Panchayet under 15th Finance (TIED) 2023-24 .
INSTALLATION AND LAYING PIPELINE AT NAZIRPUR MATH FOR AGRICULTURE AT NAZIRPUR BALIGORI-II GRAM PANCHAYAT UNDER TARAKESWAR DEVELOPMENT BLOCK DISTRICT HOOGHLY
Laying Pipeline from Samanta Para to Sannyasi Para at Gopmahal under Monoharpur-II Gram Panchayet under 15th Finance 2023-24 (TIED).
Supplying Sinking of 125 mm 50 mm 270 m deep Tube Well along with Submarshible Pump with laying of Pipe line at Dalimbachak near Jame Masjid booth 55
Supplying Sinking of 125 mm 50 mm 270 m deep Tube Well along with Submarshible Pump with laying of Pipe line at Dalimbachak near Dalimbachak Board Primary School
Additional work for laying of pipe line, concrete cutting and other allied works at Lalganj, Nuni and adjoining areas within Zone-VIII under RCFA Division-I PHE Dte.
Laying of pipe line at Rabibhagdihipara to Kajipara at Mouza Rabibhag JL NO 92 Sansad XI under chandrabhag Gram panchayat within Bagnan II P Samity Code no 89451491
Supplying Sinking of 125 mm 50 mm 270 m deep Tube Well along with Submarshible Pump with laying of Pipe line at Barbajitpur near Sakti Pradhan Booth 51
Drinking water pipeline (Submersiable) at near Hazrat Kha house (Joypur Road ) at Sherpur house at Sherpur UttarMondal house (Paschimpara) at Mallikpur Marjit house at Diara Sansad
Supplying and Laying of distribution pipeline with different diameter D.I. K7 Pipes, OPVC Pipes, HDPE Pipes and M.S. Pipes including all D.I., OPVC, and HDPE Specials, Valves, Valve chambers including filling, Cleaning, Disinfection, Hydro testing,
INSTALATION OF SUBMERSIBLE PUMP WITH PIPE LINE AT AYMAMADHUYA LASA BASKE PARA AND PIPELINE BHAGIRATHPUR BERA PARA
Sinkingof 200 X150mm diaX150 mtr. rig bored tubewell, interconnection pipeline from propose tubewell to rising main pipeline and construction damged boudary wall of Junsola PWSS within Gopiballavpur-II Block, under Jhargram Division, PHE Dte.
Additional work for laying of pipe line ( left out) with HDPE pipe line with FHTC within command area of Lohar para , Ghorui para,Badyakar Para ,Dighir para, Bagdi para, under Kanksa Zone-I PWSS with reconnection of esisting FHTC and other allied wor
Repairing/maintenance of wallow pool and concrete base for water retention, repairing of pilkhana, protection camps, mahut-patawala wooden barrack, barbed wire fencing, maintenance of water pipe line and elephant proof trench at NIlpara, Madarihat an
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Bhangadali WS scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From 12 Months
Annual Operation and maintenance of distribution and rising main pipe line for Improvement of Barabani and Majiara under RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte. (w.e.f. 01.01.2025 to 31.12.2025)
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC with all related structure of Tamajuri W S scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From 12 Months
Fabrication and erection of MS structural bridge used to cross 600 mm dia rising main pipe line near Bankura more under surface based W/s Scheme for Panagarh Industrial Park under DWSD,PHE Dte
Annual Maintenance (Two Years) of CI/DI Water Supply Rising Main Pipe line (Pipe Dia. 900mm, 70Omm, 600mm, 500mm, 450mm, 400mm, 35Omm, 300mm.) under 14MGD and 15MGD Water Supply Scheme within Durgapur Municipal Corporation.
Fabrication aligning and laying of 600 dia MS rising main pipe line in structural bridge at Birbhanpur near intake under of Surface based piped W/S Scheme ofPanagarh Industrial Park under DWSD ,PHE Dte
Additional work of Supplying, laying and aligning of HDPE distribution pipe line / rising main allied works at Bistupur Head Works Site and Saraswatingunj command area of Bistupr PWSS under RCFA Division-I PHE Dte.
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC with all related structure of Odalchua W S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Jhitka WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Baraberia WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Banspahari WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Dhamro WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Bhangabandh WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Junsola WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC with all related structure of Belaberia W S scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From 12 Months
Annual Operation and maintenance of distribution and rising main pipe line for Improvement of Barabani and Majiara under RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte. (w.e.f. 01.01.2024 to 31.12.2024)
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Kechanda WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Bahadurpur WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Aulia WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Domsole WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Simulpal WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure of Ramgarh Zone-II WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Maintenance of Rising main Delivery main pipe line CI DI HDPEuPVC with all related structure of 3Three nos pipe water supply scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC F.H.T.C. with all related structure of Bhangadali WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 Months
Supply , delivery , installation Commissioning of submersible pump motor set in the Newly sunk Tube Well size 250mmx200mm x250m depth and electrical accessories including control panel board and inter connection with existing water pipe line at
Construction of two Nos. community shed with water pipe line near Health Center and Chandi mandir in Bahula G.P. under 15th FC (BG) CFCG, Scheme Code No.- (98036986)/15th FC(BG)CFCG/BGP/2024-25,
Restoration work for the open trench done for the water pipe line laying by PHE Department in Bamongola Habibpur Road from 1.00 kmp to 3.00 kmp under Malda Highway Division in the district of Malda.
Installation of UPVC water pipe line , interconnection in place of Battola Chawk from Vidyasagar Road to Homeopathy College via Golkua Chawk Sadhu Goli Boarding Para in ward No-12 within Midnapore Municipality under 15th F.C
Restoration work for damaged flank for laying water pipe line by PHE Department from 2.400 km to 7.900 km in stretches of Eklakhi to Rashikpur road under Malda Highway Division in the district of Malda.
Implementation of various developmental works (icds repair,submersible pump,water pipe line,2 nos pcc drain) at polling station no 18 under RAJGRAM GP under Murarai I Dev. Block under the fund-APAS-2025-26
Restoration work for damaged flank for laying water pipe line by PHE Department from 0.552 km to 9.943 km in stretches of Bulbulchandi to Katlapukur road under Malda Highway Division in the district of Malda.
Installation of water pipe line and 01 number of face pump at B9A panel and 03 numbers of face pumps at B8C for dewatering in R-VI seam at Khottadih Colliery under Pandaveswar Area, ECL.
CONSTRUCTION OF COMMUNITY TOILET WITH WATER PIPE LINE NEAR GACHBAGAN DAG NO 404 AT MOUZA MANOHARPUR UTTAR IN MANOHARPUR-II GRAM PANCHAYET WITHIN CK1 PANCHAYET SAMITY, IN THE YEAR OF 2021-2022.FUND 15TH CFC