Loading…
Loading…
46,540 results • Best match
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure of Banspahari WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all relatedc structure of Ragra WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all relatedc structure of Balibandh WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure of Aulia WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation and Maintenance of Rising Main (pipe line (HDPE PE-80) of Barasukjora Water Supply Scheme within (Binpur-II) Block within Jhargram Sub-Division under Jhargram Division, PHE Dte. for 12 Months.
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure of Kechanda WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation and Maintenance of Rising Main ( pipe line (HDPE, PE-80) of Barasukjora Water Supply Scheme within (Binpur-II) Block within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 months.
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all relatedc structure of Sankrail WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC with all related structure of Tamajuri WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte.For 12 Months
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure of Jhitka WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure of Domsole WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Laying of 150 mm dia DI K9 Rising Main pipe line of Baharampur and its adjoining mouzas Water Supply Scheme within Bhagwanpur-II Block under Contai Sub-Division,PHE Dte .(2nd Call)
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all related structure of Bahadurpur WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all relatedc structure of Pathardahara WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC F.H.T.C. with all relatedc structure of Banshia WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Annual Operation and maintenance of distribution and rising main pipe line including FHTC at Andharia, Baguli, Chinchurbil, Churulia, Rakhakura, Joynagar, Desher mohan, Madhabpur and Madhudanga Mouza under Churulia Water Supply Scheme under
Operation Maintenance of Rising main Delivery main pipe line CIDIHDPEuPVC with all relatedc structure F.H.T.C. of Loudaha WS scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.04.2024 to 31.03.2025
Laying of different dia., CIDF, DI, UPVC, HDPE Pipeline, Trenchless Pipe laying by HDD Process, HDPE pipe line for left out household connection, Trial and run the entire PURBA KATHALBARI ZONE-4 PWSS Scheme with maintaining for 3 months after success
Laying of different dia., CIDF, DI, UPVC, HDPE Pipeline, Trenchless Pipe laying by HDD Process, HDPE pipe line for left out household connection,Trial and run the entire PURBA KATHALBARI ZONE-3 PWSS Scheme with maintaining for 3 months after successf
Supplying Sinking of 125 mm 50 mm 270 m deep Tube Well along with Submarshible Pump with laying of Pipe line at Brajalalchak near Aditya Maity Shop
Construction of Drain, Concrete Road and Water Pipe Line beside house of Gopal Banerjee with C.C. Road beside Bakultala Gamkal in Ward No-3 under Bansberia Municipality. (APAS 193-Saptagram, Booth No-181)
Installation of Submarseble pump with water pipe line AND tank at Babulal Mahatas Land At Salika Mouza- Salika J.L.No- 68 Plot no- 210 UNDER APAS FUND OF 2025-26 UNDER ARJUNI GRAM PANCHAYAT
Extension of drinking water pipe line at Bankola 4 no Nim Dhawra and Pankha Dhawra, Sansad No XIV within Chhora G.P. Scheme Code No- 15th FC (CFC) / 2024-25 / 46. (Activity Code- 89729859 )
Installation of Water Pipe Line from Asit Patras house to Nimai Dalapatis house via Mrityunjay Patras house JL No 44 Plot No 626 to 640 under Basantapur GP Fund from APAS 2025 2026
Extension of drinking water pipe line from Konchowki to Sitola Mandir at Panna Paschim, Mouza Panna, JL No 120 within Ajabnagar-I GP under Ghatal Panchayat Samity under 15th CFCG tied 2022-23
INSTALLATION OF TUBE WELL INFRONT OF AWC AT DHABANI and INSTALLATION OF WATER PIPE LINE FROM THE HOUSE OF PHELI NAYEK TO LAXMIKANTA NAYEK AND FROM SUBHANKAR KANRI TO SWAPAN NAYEK AT SHURIAM
Installation of Water Pipe Line from Srinibas Senapatis house to Dilip Bhanjas house via Nilkamal Saus house JL No 44 Plot No 390 to 423 under Basantapur GP Fund from APAS 2025 2026
Supply, Installation and Commissioning of RO UV Water Purifier with water cooler with associated water pipe line connection up to 100 m and all required accessories for each machine (on turn-key basis).
Sinking of submerssible pump and pipe line near Sl Halim house at Padumpur
Laying of Pipe Line from the to H/o Arjun Chakraborty to H/o Somnath BHowmik in ward no 02,under Gangarampur Municipality,Gangarampur Dakshin DInajpur Municipality,Gangarampur Dakshin DInajpur.Dakshin Dinajpur.
Laying, testing, Commissioning of sub distribution pipeline at Agent office, Shiv mandir, Dobalia para, Bhutdoba at ward no - 38 under AMC.2nd Call
Laying of distribution pipeline from masterpara road at nutan singh club(approx 200 meter), Booth no-248 Wrad-101, Borough IX UNDER AMC.
Damage Repair of Distribution pipeline of Chilkigarh-III and IV in Jamboni Block under Jhargram R.W.S Sub Division within Jhargram Division P.H.E. Dte
Laying Pipeline with Water Tank near Swashan at Harisingpur under Monoharpur-II Gram Panchayet under 15th Finance 2023-24 (TIED).
Laying pipeline from bore hole to 6 no. pit at Khas Kajora for bunker (600 mtr.) under Khas Kajora Colliery.
Installation of submersible pump with pipe line near Narayan Chandra janas house booth no.- 116
Installation of Water Pipeline and Street Stand Post in Ward No. 07 Booth No.50 under Budge Budge Municipality.
Laying of Pipe line from Dakshin Khasmulda Gramya mandir Pond to Uttar khasmulda Basu Jana s pond under Mulda JL no 337 338 Plot No 3 45
Laying of Pipe Line from the to H/o Houakalitala Primari School to H/o Arun Das in wardvno 02,under Gangarampur Municipality,Gangarampur Dakshin DInajpur.Dakshin Dinajpur.
Supplying with laying of Pipe Line at Booth No 54 55 56 62 68 under GP Area over JL No 57 58 Plot No 1708 2234 905
Laying of Pipe Line for Sub-Mersible Pump Laying of Cable at Damra Pump House To Improve The Quality Quantum of Drinking Water Under Asansol Municipal Corporation.
Installation of Submersible Pump near Binanda Bag House And laying of Pipe Line via Sakti Mallick to Bibhuti Hazra House at Pakuriapal For Supply of Drinking Water
ESTIMATE FOR SINKING OF TUBE WELL WITH SUBMURSHIBLE PUMP MOTOR LAYING OF PIPE LINE AT WARD NO-10 PLAY GROUND BOOTH NO-208 UNDER COOPERS CAMP NAA
Repairing of Damaga Distribution Pipeline and Rising Main Pipeline due to widening of NH Road and Leakage of Pipeline and Interconnection Between Rising main and Distribution and Rising main with New CWR at Balarampur Zone-II W/S Scheme under Balar
Sl. No. 12.. Laying pipeline in place of damaged pipeline along and across of Dhupguri - Daukimari Road for Dhupguri Municipal Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte.
REPAIRING OF ROAD IN (WATER PIPELINE CUTTING ROAD IN DIFFERENT SANSAD UNDER RAGHUDEBBATI GRAM PANCHAYAT, UNDER 15TH FC UNTIED, ID- 97750550
O and MTc rising main from Pansuili to Madhaiganj_Pt_A
Inspection of rising main pipeline and necessary repairing over the command area by engaging maintenance manual labour mistry necessary materials daily maintenance 80 mm to 500 mm dia pipeline under Borough I AMC
Repairing/maintenance of wallow pool and concrete base for water retention, repairing of pilkhana,protection camps, mahut-patawala wooden barrack, barbed wire fencing, maintenance of water pipe line and elephant proof trench at Jaldapara East, Jaldap
Repairing/maintenance of wallow pool and concrete base for water retention, repairing of pilkhana,protection camps, mahut-patawala wooden barrack, barbed wire fencing, maintenance of water pipe line and elephant proof trench at Chilapata and Kodalbas