Loading…
Loading…
46,563 results • Best match
Laying of Clear Water Rising Main for Zone IV within Bolpur Muninipality Birbhum.
Laying of Clear Water Rising Main for Zone- I within Bolpur Muninipality Birbhum.
O and MTc rising main from Pansuili to MIC More to ECL BSP_Pt_B
WATER PIPE LINE AT SANSAD VIII Activity Code 57924286
REPAIRING OF WATER PIPE LINE AT THAKUR PARA AREA
Cement concreting Plumbing Water Pipe line Electrical work Etc
Installation of water pipe line under Kamlpur Mannutola Sansad
Installation of water pipe line under Kamalpur Bazarpara Sansad
Day to Day inspection of pipe line, valve and maintenance of 500 mm dia Rising main from Searsol Head Work to Chinchuria OHR under maintenance of RCFA Pt II, WS Scheme under RCFA Division-I PHE Dte. (w.e.f. 01.11.2022 to 31.10.2023)
Day to Day Operation and Maintenance of Rising main and delivery main pipe line (CI/DI/ HDPE/UPVC) with all related structure i.e. FHTCs etc. of CHHANAPARA W/S scheme within Jhargram block under Jhargram Division, PHE Dte. (For 1 Year)
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) and F.H.T.C. with all related structure of Dhamro W/S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.07.2024 to 30.06.2025. (2nd Cal
Annual operation and maintenance of different dia MS/DI Rising main and distribution system pipe line from Intake site to Panagarh Industrial Park H/W site under Surface based PWSS for Panagarh Industrial Park under DWSD,PHE Dte (1 yr)
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) and F.H.T.C. with all relatedc structure of Barajharia W/S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.07.2024 to 30.06.2025. (2n
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) and F.H.T.C. with all related structure i.e. OHR etc. of Dahamunda W/S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 months.
Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC with all related structure of 03 Three nos pipe water supply scheme within Jhargram Sub Division under Jhargram Division, PHE Dte. From 12 months 1 Belia pipe ws scheme
Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of Chandalbundh and its adjoining mouzas W/S scheme in Nayagram block within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. (For 12 Mo
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) and F.H.T.C. with all related structure of Bhangabandh W/S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.07.2024 to 30.06.2025. (2n
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) and F.H.T.C. with all related structure of Simulpal W/S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.07.2024 to 30.06.2025. (2nd C
Day to Day Operation and Maintenance of Rising main and delivery main pipe line (CI/DI/ HDPE/UPVC) with all related structure i.e. FHTCs etc. of PUKURIA W/S scheme within Jhargram block under Jhargram Division, PHE Dte. (For 1 Year)
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) and F.H.T.C. with all relatedcstructure of Junsola W/S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.07.2024 to 30.06.2025 (2nd Ca
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) and F.H.T.C. with all related structure i.e. OHR etc. of Netai W/S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. for 12 Months.
Repairing and Maintenance of Pump House of Borough II Damalia Water Works Dumping Ground Pump House Robinsen Stadium Pump House Narankuri Pump House including i Rising Main Pipe line from Damalia pumping station to Robinson stadium 700 mm dia ii
Day to Day Operation and Maintenance of Rising main and delivery main pipe line (CI/DI/ HDPE/UPVC) with all related structure i.e. FHTCs etc. of LOHAMELYA W/S scheme within Jhargram block under Jhargram Division, PHE Dte. (For 1 Year)
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) and F.H.T.C. with all relatedc structure i.e. OHR etc. of Netai W/S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 months.
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) and F.H.T.C. with all relatedc structure i.e. OHR etc. of Rohini W/S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 months.
Supplying and Delivery of Different dia CIDF Sluice Valve, CIDF Pipes and Speci including Construction of Valve Chamber and allied works for Laying distribution of HDPE Pipe Line and Inter Connection between Tube Well and Rising main For Gohal Bura
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) and F.H.T.C. with all relatedc structure i.e. OHR etc. of Chhatinasole W/S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 months.
Permanent Road Restoration work for Bituminous Road of distribution pipe line and clear water rising main from DTW to OHR for Zone I, Zone II, Zone III, Zone IV and Zone V for water supply scheme within Tarakeswar Municipality area, dist.Hooghly
Laying of 150 mm dia and 100 mm dia DI(K9) Rising Main pipe line with CIDF pipe and specials of Barasubarnanagar and its adjoining mouzas Water Supply Scheme within Contai-II (Deshpran) Block under Contai Sub-Division PHE Dte.
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) with all related structure of 11 nos 45 Mini Pipe Water Supply Scheme in Nayagram Block within Gopiballavpur Sub-Division, under Jhargram Division PHE Dte. (For
Operation and Maintenance of Rising main and Delivery main pipe line (CI/DI/HDPE/uPVC) and F.H.T.C. with all related structure of Khamar W/S scheme within Jhargram Sub-Division under Jhargram Division, PHE Dte. From 01.07.2024 to 30.06.2025. (2nd Cal
Annual Operation and maintenance of Rising main pipe line from Ondal Head Work Site to Dignala OHR and Distribution Pipe lines from Dignala OHR of Ondal Phase-II(A) Water Supply Scheme under RCFA Division-I PHE Dte. (For 365 Days)
Day to Day inspection of pipe line, valve and maintenance of 500 mm dia Rising main from Searsol Head Work to Chinchuria OHR under maintenance of RCFA Pt II, WS Scheme under RCFA Division-I PHE Dte. w.e.f. 01.03.2022 to 31.08.2022
Maintenance of Rising main, Delivery main pipe line CIDIHDPEuPVC, F.H.T.C all related structure of 6 nos Mini pipe water supply scheme out of 179 nos Mini PWSS of Binpur-1 Block within Jhargram Sub-Division under Jhargram Division, PHE Dte.
Maintenance of Rising main, Delivery main pipe line CIDIHDPEuPVC, F.H.T.C all related structure of 5 nos Mini pipe water supply scheme out of 269 nos Mini PWSS of Binpur-1 Block within Jhargram Sub-Division under Jhargram Division, PHE Dte.
Maintenance of Rising main, Delivery main pipe line CIDIHDPEuPVC), F.H.T.C all related structure of 5 nos Mini pipe water supply scheme out of 179 nos Mini PWSS of Binpur-1 Block within Jhargram Sub-Division under Jhargram Division, PHE Dte.
Maintenance of Rising main, Delivery main pipe line CIDIHDPEuPVC, F.H.T.C all related structure of 6 nos Mini pipe water supply scheme out of 179 nos Mini PWSS of Binpur-1 Block within Jhargram Sub-Division under Jhargram Division, PHE Dte.
Maintenance of Rising main, Delivery main pipe line CIDIHDPEuPVC, F.H.T.C all related structure of 5 nos Mini pipe water supply scheme out of 269 nos Mini PWSS of Binpur-1 Block within Jhargram Sub-Division under Jhargram Division, PHE Dte.
Day to day Operation and Maintenance of Rising Main and Delivery Main Pipe Line (CI/DI/HDPE/uPVC), F.H.T.C and all related structure of Kapgari Water Supply scheme at Jamboni Development Block within Jhargram RWS Sub-Division under Jhargram Division,
Day to day Operation and Maintenance of Rising Main and Delivery Main Pipe Line (CI/DI/HDPE/uPVC), F.H.T.C and all related structure of Gidhni Water Supply scheme at Jamboni Development Block within Jhargram RWS Sub-Division under Jhargram Division,
Day to day Operation and Maintenance of Rising Main and Delivery Main Pipe Line (CI/DI/HDPE/uPVC), F.H.T.C and all related structure of Kultikri Water Supply scheme at Sankrail Development Block within Jhargram RWS Sub-Division under Jhargram Divisio
Day to day Operation and Maintenance of Rising Main and Delivery Main Pipe Line (CI/DI/HDPE/uPVC), F.H.T.C and all related structure of Balibandh Water Supply scheme at Jamboni Development Block within Jhargram RWS Sub-Division under Jhargram Divisio
Day to day Operation and Maintenance of Rising Main and Delivery Main Pipe Line (CI/DI/HDPE/uPVC), F.H.T.C and all related structure of Chichira Water Supply scheme at Jamboni Development Block within Jhargram RWS Sub-Division under Jhargram Division
Maintenance of Rising main Delivery main pipe line CI DI HDPE uPVC FHTC all related structure of 6nos Mini pipe water supply scheme out of269 nos Mini PWSS of GopiballavpurII Block within JhargramSub Division underJhargram Division PHE Dte For 12 Mo.
Maintenance of Rising Main, Delivery Main Pipe Line (CI/DI/HDPE/uPVC),FHTC and all related structure of 09(Nine) nos.Standalone Piped Water Supply schemes out of 269 nosStandalone PWSS at Jamboni Block within Jhargram RWS Sub-Division under Jhargram
Maintenance of Rising Main, Delivery Main Pipe Line (CI/DI/HDPE/uPVC),FHTC and all related structure of 09(Nine) nos.Standalone Piped Water Supply schemes out of 269 nosStandalone PWSS at Jamboni Block within Jhargram RWS Sub-Division under Jhargram
Laying Pipeline from Kalsar Para to Ganesh Dolai house via Tapas Dolai house at Sadichak under Monoharpur-II Gram Panchayet under 15th Finance 2023-24 (TIED).
Flow control of rising main and different Dia distribution system by different regulating apparatus for shifting of pipeline due to construction of dedicated freight corridor under RCFA Division-I PHE Dte.
Laying Rising main Distribution Pipeline and Accommodate FHTC under JJM for Rupnarayanpur Zone_I PWSS in Kharagpur_I block under Midnapore Division PHE Dte. PART_II
Additional Distribution Pipeline work at KARJJANA Piped Water Supply Scheme with Rising Main, LDS and FHTC work under Bhatar Block, District- Purba-Bardhaman.