Loading…
Loading…
1,087 results • Best match
Providing main PPP pipe line from Shree Krishna Biswas house to near Sapan Mondal house at Sitanagar Ward No-1 under SD-V,CD, Diglipur
Supplying of Hydraulic Excavator and Truck as when required basis
Providing HDPE Liner in Rain Water Harvesting Reservoir at Webi (Phase II) under Sub Division-II, NACD, APWD, Mayabunder
AR Supply of G.I Pipe fittings Car Nicobar.
Annual maintenance of the Internal Electrical Installations and Fans, water supply pumpsets, compound lights for the Regional Station Office of Zoological Survey of India at Port Blair, A&N Islands. (For the year 2023-2024) SH: Providing outdoor & Weather proofed type pre wired 3D sign board for Newly Constructed Visiting Scientist Hostel & Guest House. Subwork/Packages: Providing Outdoor & Weather proofed type pre wired 3D LED sign board for Newly Constructed Visiting Scientists Hostel & Guest House.
AR and MO water supply under Bambooflat Sub division during 2022 23. S.W Supply of PPR pipes, fittings, tools and plants
A R and MO Water Supply under AE I, Wimberly Gunj. S.W Emergency Repair works and providing connection under Wimberly Gunj
AR and Mo Water Supply under Bambooflat Sub-Division, RCD, APWD, Wimberly Gunj during 2021-22. S.W Supply of Pipe fittings.
AR and MO Water Supply under Ferrargunj Sub Division during 2022-23. S.W Replacement of damaged distribution pipelines under Collingpur Panchayat.
AR and MO water supply under Bambooflat Sub Division RCD, APWD, Wimberlygunj during 2022-2023. Sub Work Desilting of Panighat Dam.
A/R and M/O water supply under Wimberly Gunj Sub Division RCD,APWD, Wimberly Gunj. SW Supply of Pipe fittings.
Construction of Office Building and Residential Building of Type-II 6 Nos, ( G2 floors), Type-III 6 Nos ( G2 floors) Type-IV (G1 floor) for CBI at Quarry Hill, Port blair. SH: Building portion including internal water supply, Sanitary installations, Drainage, Electrical Installations, Development works and other miscellaneous works. SH: Dismantling and Re-installation of Electrical equipments with Accessories etc. Subwork/Packages: Dismantling and Re-installation of Electrical Items.
Sw- SITC of 01 no. 52 HP 4R1040 Kirloskar engine coupled with RKB 65 19L pump as replacement to existing 38 HP pump at Kishorinagar pump house -01
Improvement of water supply at Gandhi Nagar, GNI. Sub Work Construction of approach road and footpath at Water Treatment Plant Gandhi Nagar.
AR and MO Water Supply under SD No I during 2021 22 Fabrication works including supplying of welding machine with all accessories
AR and MO water supply under AE I, Wimberly Gunj during 2022-23. S.W Improvement of existing distribution line under Wimberly Gunj
AR MO Water Supply under Wimberly Gunj Sub Division, RCD, APWD, Wimberly Gunj. Sub Work Supply of Materials Pipe and Pipe Fittings
AR and MO water supply under SD-I of CD-I, APWD, Rangat during 2020-21. SW- Supplying and stacking of river sand
A_R and M_o water supply under SD_I PHED APWD, Prothrapur during 2020_21 _SW_ Supply of Hydraulic Excavator on as and when required basis
AR MO Water Supply under Wimberly Gunj Sub Division, RCD, APWD, Wimberly Gunj. S.W Improvement of pipeline at Vasundra Nallah Source at Mannarghat
Replacement of damaged GI pipes, Water Supply and sanitary fittings to Type-II B block Staff Quarters , in New Block, Shadipur, Port Blair
AR and MO water supply under SD-I of CD-I, APWD, Rangat during 2020-21. SW- Supplying and stacking of Quarry products
AR and MO Water Supply under PHED APWD Prothrapur during 2023-24 SW Supply of Hydraulic Excavator as on and when required basis
A_R and M_o water supply under SD_IV during 2019_20 _SW_ Repair and renovation of existing JEs office cum store at RMPoint Rutland Island
AR and MO Water Supply under Wimberly Gunj Sub Division, RCD, APWD, Wimberly Gunj. Sub Work Supply of Materials (Pipe and Pipe Fittings).
AR and MO water supply under EE PHED Prothrapur during 2023 to 24 SW Hiring of water tanker on as and when required
Dismantling existing G.I pipe line at Khudirampur village Sitanagar under SD-V, CD, APWD, Diglipur
Construction of Office Building, Pump Room and Retaining Wall for National Centre for Disease Control (NCDC) branch at Nayashar, South Andaman. SH-1 Building Portion including water supply, underground sump, ETP, sanitary installation, drainage. SH-2 Providing Internal Electrical Installations, Sub-Station, Fire alarm, Fire Fighting, VRV AC, CCTV, EPBAX, LAN, AV System, UPS, DG set and Street light, ETP & Solar PV power generation system with allied works.
A/R and M/O water Supply under Ferrar Gunj Sub Division, RCD, APWD, Wimberly Gunj during 2021-22.SW Supply of Pipe Fittings.
Annual maintenance of ALHW residential colony at Shadipur and South Point including maintenance of providing water supply arrangement for the period of one year
AR MO Water Supply under Sub Division NoI PHED APWD Prothrapur during 2025_26 SW Supply of Hydraulic Excavator on as and when required basis
AR and MO water supply under SD-IV, Kadamtala of CD-I, APWD, Rangat during 2020-21. SW- Supplying and stacking of river sand
AR and MO water supply under SD-II of CD-I, APWD, Rangat during 2023-24. SW - Extension of Check weir at Chappa Tikrey
AR and MO Water supply Sub Division NoIII under E, PHED APWD Prothrapur during 2023to24. SW Providing and fixing openable gate at Lallmitti Checkweir
A_R and M_o water supply under Sub _ Division No_IV PHED APWD Prothrapur during 2020_21 SW_ Conducting bathymetric survey of proposed sweet water lake at Sippighat
A_R and M_o water supply under Sub_Division No_1 during 2020-21 SW_ Supplying, Installation and commissioning of clamp on Ultrasonic flow meter at Dhanikhari Dam
A/R and M/O water supply under AE-I Wimberly Gunj during 2021-22. SW Minor Repair works and providing connection under Wimberly Gunj.
AR and MO water supply under SD-I of CD-I, APWD, Rangt. SW - Improvement of pipe line at various places at Rangat Sub Division
AR and MO water supply under SD-I, CD-I, APWD, Rangat during 2023-24 De-silting with in the Rangat river basin at Parnasala.
AR and MO Water supply under EE, RCD, Wimberly Gunj during 2022-23. S.W Improvement of distribution pipeline at Machi Basthi under Ferrargunj Sub division.
AR and MO Water supply Sub Division No.I, under EE PHED APWD Prothrapur during 2023 to 24 SW Repair of vertical gate at Dhanikhari Dam
Water proofing to IQ terrace , miscellaneous Civil Repairing to Water supply and Sanitary fittings and Painting works in IQ Suites at Telephone Bhawan, Sri Vijayapuram
AR and MO Water Supply under Ferrargunj Sub Division during 2023-24. SW Development of Japani Pond near Police land Dunduspoint. SH Hiring of Hydraulic Excavator.
AR and MO Water Supply under Sub Division No I PHED APWD Prothrapur during 2025_26 SW Supply of Hydraulic Excavator on as and when required basis
AR and MO water supply under AE FG RCD APWD Wimberly Gunj during 2022-23. SW Desilting of Dam No.-I at RCD APWD Wimberly Gunj.
AR and MO water supply under Section-II, Sabari, SD-II of CD-I, APWD, Rangat during 2020-21. SW- Supplying and stacking of river sand
AR and MO water supply under Section-V, Bakultala, SD-II of CD-I, APWD, Rangat during 2020-21. SW- Supplying and stacking of river sand
Structural repair works, Renovation to two nos rooms, Provision of separate Toilet, Water supply arrangement, Vitrified floor tile and other miscellaneous Civil works in proposed Transit
AR MO Water Supply under, RCD, APWD, Wimberly Gunj. Sub work Supply of Bleaching Powder Gr. I for Mannarghat Sub Division under RCD, APWD, Wimberly Gunj.
AR and MO water supply under AE I, Wimberly Gunj during 2021 22. S.W Repair and Maintenance including painting of water storage tank under Wimberly Gunj