Loading…
Loading…
13,533 results • Best match
Laying of 300mm i/d RCC pipe channel 55 Mtrs., Construction of 1 No. S/S Tank of size 30.5mx30.5mx3.66 Mtrs., 2 No. Filter beds of size 6.10mx3.96m, 1 No. clear water tank of size 6.70mx4.57mx 2.44 mtrs., 1 No. High Level Tank of
Unbranded Cast Brass 15 millimeter plug cock for water supply, Unbranded Cast Brass 15 millimeter plug cock for water supply purpose
Operation and maintenance of water supply system for attending day to day complaints of water supply in ward 32 under MCG
Attending day to day water supply leakage of GI and DI water supply line in ward no.15, under MC, Manesar
Providing and Laying of 300mm id RCC pipe Inlet Channel, 01 No. RCC Filter Beds 28x19, 01 No. Clear Water Tank of size 20x13, 01 No. High Level Tank of Size 24x16 Head Works Pipeline, Repair of water works structures, Distribution
Providing and Laying of 350mm i/d RCC Pipe Channel, Construction of One No. RCC High Level Tank , One No. RCC Filter Bed, One No. RCC Clear Water Tank, Laying of Head Works Pipe Line, Construction of C.C. Road and Path, Painting, Distempering
A Mtc works for water supply and erection
12255 dated 09 Nov 2020 Sohna Water Supply
Bhuna Balance DI Pipe Water Supply 24.30 lakhs
A mtc of Water supply scheme in sector 2 6 7HBC 9 9A R Stock HSVP Bahadurgarh Work for mtc of water supply scheme of Sector 2 6 7HBC 9 9A 10 11 12 13 Bahadurgarh completer in all respect and all other works contingent thereto
A/mtc of water supply,sewerage,SWD in sector 29 Gurugram
A/mtc of water supply,sewerage,SWD in sector 29 Gurugram
Work for repair of water supply leakages Sector-13-17, Panipat
RAKHOTA estimate for improvement water supply scheme by laying distribution pipe line in village rakhota and all other works contingent
Estimate for improvement water supply scheme by laying of distribution pipe line in village Aherwan and all other work contingent
Annual maintenance estimate of Master Water Supply Scheme in U/E , Narnaul for he Year for the year 2024-2025
Operation and maintenance of complete water supply scheme, Repair of pipeline, Civil structures and all other works contingent there to.
AUGMENTATION OF WATER SUPPLY SCHEME BY CONSTRUCTION ADDITIONAL REQUIRED STRUCTURES and LAYING THE DISTRIBUTION NETWORK IN BALANCE AREA OF MC
Sanpli Kasola A Mtc estimate for water supply scheme Sanpli and Kasola Dist Rewari for the financial year 2025 26
Majra Mustil Bhalkhi Annual Operation and Maintenance of Water Supply Scheme of Village Distt Rewari for the year 2025 26
Annual maintenance estimate of Master Water Supply Scheme in U/E , Narnaul for he Year for the year 2024-2025
Annual maintenance estimate of Master Water Supply Scheme in U/E , Narnaul for he Year for the year 2024-2025
Annual maintenance estimate of Master Water Supply Scheme in U/E , Narnaul for he Year for the year 2024-2025
Comprehensive maintenance of water supply scheme of Village RATTA KHERA.(The Detail shop of work is attached in additional documents)
Annual maintenance estimate of Master Water Supply Scheme in U/E , Narnaul for he Year for the year 2024-2025
Annual Maintenance estimate for Water Supply Scheme Jhajjar Town Distt. Jhajjar for the year 2023-24 (Based on Canal System)
ROUGH COST ESTIMATE FOR PROVIDING INTERNAL WATER SUPPLY SCHEME IN SECTOR - 16, U/E, GOHANA - INCLUDING FIVE YEARS MAINTENANCE COST.
Annual maintenance estimate of Master Water Supply Scheme in U/E , Narnaul for he Year for the year 2024-2025
Annual Maintenance estimate for Water Supply Scheme Jhajjar Town Distt. Jhajjar for the year 2023-24 (Based on Canal System)
Annual maintenance estimate of Master Water Supply Scheme in U/E , Narnaul for he Year for the year 2024-2025
Chuli Bagrian DNIT A Mtc Operation and Maintenance of Water Supply Scheme in villages Chuli Bagrian Tehsil and Distt. Hisar
Annual maintenance estimate of Master Water Supply Scheme in U/E , Narnaul for he Year for the year 2024-2025
Annual maintenance estimate of Master Water Supply Scheme in U/E , Narnaul for he Year for the year 2024-2025
Santhawari Improvement of water supply scheme by laying/Replacement of distribution pipeline and Regularise connections in village Santhawari, (District Nuh).
Mohmadpuria Estimate for Aug. Water Supply Scheme, Laying of Distribution Pipe Line and FHT Connection, of Village Mohmadpuria, Distt. Sirsa.
Annual Maintenance for Water Supply Scheme Khaleta Pond of Submersible of motor valave and all other works contingent there to
Sanpli Kasola A Mtc estimate for water supply scheme Sanpli and Kasola Dist Rewari for the financial year 2025 26
Annual maintenance estimate of Master Water Supply Scheme in U/E , Narnaul for he Year for the year 2024-2025
Annual maintenance estimate of Master Water Supply Scheme in U/E , Narnaul for he Year for the year 2024-2025
Comprehensive maintenance of water supply scheme of Village NANGAL,SARDAREWALA.(The Detail scope of work is attached in additional documents)
Annual maintenance estimate of Master Water Supply Scheme in U/E , Narnaul for he Year for the year 2024-2025
Annual maintenance estimate of Master Water Supply Scheme in U/E , Narnaul for he Year for the year 2024-2025
Annual maintenance estimate of Master Water Supply Scheme in U/E , Narnaul for he Year for the year 2024-2025
Baded Rough cost estimate for improvement of water supply scheme laying of balance disribution pipe line and all other works
Kirtan AMtc Water Supply Scheme Kirtan Repair of Parapet wall of S S Tank and all other works contingent thereto
Bhodia Khera updating of water supply scheme and strengthening of Distribution system in Village Bhodia Khera Teh. and Distt. Fatehabad
Chhachhrauli Various Rural - Annual Maintenance Water Supply Scheme for the Year 2024-25. Comprehensive maintenance diaphragm metering Chemical Dozing System
Annual maintenance estimate of Master Water Supply Scheme in U/E , Narnaul for he Year for the year 2024-2025
Annual Maintenance estimate for water supply scheme Kheri Asra for the year 2025-26. OandM for the next 12 months
Annual Maintenance estimate for water supply scheme Akheri Madanpur for the year 2025-26. OandM for the next 12 months