Loading…
Loading…
5,516 results • Best match
Improvement / Repair to different water supply schemes in Shiendara/ Bandi Tassan L Nerian/ Kalai Section pertaining to small /petty works of Distt. Capex, M AND R, BADP/ TSP and other deposit works falling under the jurisdiction of PHE Sub Divisio
Construction of 250 mm Dia. Production Tube Wells by any suitable method (Reverse/Direct/Dual rotary) using Mud-Rotary Drilling Rig for 05 Water Supply Schemes (06 nos. Tube wells) of District Kathua of JAMMU Province under Jal Jeevan Mission
Construction of 250 mm Dia. Production Tube Wells by any suitable method (Reverse/Direct/Dual rotary) using Mud-Rotary Drilling Rig for 05 Water Supply Schemes (06 nos. Tube wells) of District Kathua of JAMMU Province under Jal Jeevan Mission
Improvement / Repair to different water supply schemes in Seri Chowana/Phagla/Chakli Dhundak Section pertaining to small /petty works of Distt. Capex, M AND R, BADP/ TSP and other deposit works falling under the jurisdiction of PHE Sub Division Sur
Construction of 250 mm Dia. Production Tube Wells by any suitable method (Reverse/Direct/Dual rotary) using Mud-Rotary Drilling Rig for 05 Water Supply Schemes (06 nos. Tube wells) of District Kathua of JAMMU Province under Jal Jeevan Mission
Supply of material as per BIS standards and relevant IS Codes as per BOQ (Valves pipe fittings, spindle rods, wrenches, HDPE Pipes, Die Set, T and P Material and other necessary items for routine works at various Water Supply Schemes
Improvement of various water supply schemes by way of providing and fitting of CS valves alongwith allied works at pumping station Thill Roun, Providing and fitting of MCCB and bus bar sets alongwith allied works at pumping station Spring Source / So
Construction of 250 mm Dia. Production Tube Wells by any suitable method (Reverse/Direct/Dual rotary) using Mud-Rotary Drilling Rig for 05 Water Supply Schemes (06 nos. Tube wells) of District Kathua of JAMMU Province under Jal Jeevan Mission
Construction of 12 No. 1000, 15 No. 2000, 01 No. 3000 Gallons per hour capacity Slow Sand Filtration Plant for providing house hold water connections to un-covered Habitations for 10 No. Water Supply Schemes Sawani, SanasarPhase-II, Dharmond, Ch
Construction of 01 No. 3000 , 16 No. 2000 , 04 No. 1000 , 04 No. 500 Gallons per hour capacity Slow Sand Filtration Plant and 14 No. Sedimentation Tank / Filtration Gallery for 11 No. Retrofitting of Water Supply Schemes Balwat, Tanger, Demote, Ka
Permanent Restoration/Construction of Protection Work at spots and Providing Laying and Fixing of G.I Pipes in Gravity main, Sub main and Distribution Systems of various Water Supply Schemes WSS Pul Doda, WSS Old Trown, WSS Jangalwar, WSS Pranoo, W
Construction of Protection Work and Providing Laying and Fixing of DI/GI/HDPE Pipes in Gravity main, Sub main and Distribution Systems of various Water Supply Schemes WSS Shankoja, WSS Dhar Chobia, WSS Chunna Seri, WSS Neota, WSS Chobia, WSS Hanga,
Permanent restoration/Construction of Protection work, Providing Laying Fitting of DI/GI/HDPE Pipes in Gravity main, Sub main and Distribution Systems of various Water Supply Schemes WSS Puneja, WSS Bhaderwah Town, WSS Thuba and WSS Jai Chinta of PHE
Supply of material as per BIS standards and relevant IS Codes as per BOQ (Valves pipe fittings, spindle rods, wrenches, HDPE Pipes, Die Set, TP Material and other necessary items for routine works at various Water Supply Schemes and office purposes
Repairs/maintenance and restoration of damaged pipe lines at spots viz. near shop of Mohd. Altaf Tak, at Jan Mohalla, Near Hospital road, Ganie Mohalla Shopian, Baba Mohalla, Dabi dathur in water supply scheme Shopian TownShopian in water supply sch
Annual Stage Contract for repairing work/Periodical Maintenance/Documents, of the Departmental Water Tankers and DG Set Divisional Office (25KV, 03 Phase) of Jal Shakti (PHE) Rural Water Supply Division Ganderbal / Sgr for the Financial year 2023 24
Providing, installation, testing and commissioning of pumping machinery and electro-mechanical works along with allied jobs to be executed at water supply scheme Changran of Jal Shakti PHE Mech. Sub Division Kathua under JJM
Providing, installation, testing and commissioning of pumping machinery and electro-mechanical works along with allied jobs to be executed at water supply scheme Mahanpur of Jal Shakti PHE Mech. Sub Division Mahanpur under JJM
Design, Construction, Testing and Successful Commissioning of 03 Nos. Slow Sand Filtration Plant 500GPH Capacity and Chain Link Fencing Around the Structure at Spots of Water Supply Scheme Saras under Jal Jeevan Mission
Shifting of 600mm dia D.I Supply Main from existing alignment along Baily bridge to under Construction of RCC Bridge at Sharifabad across Flood Spill Channel for Water Supply Scheme Sukhnag. (Under Deposit Contribution).
Construction of GSRs 5000 Gls GSR (five Number),10000 Glns(one Number), ,Pump Room(two Number), including compound wall, entrance gate,R.M, pipe network for Water supply scheme Tanvi Dharan Mohra under JJM
Supply, installation, testing and commissioning of electro-mechanical equipments and construction of pump house/panel room/ operator room at water supply scheme Bathen Batadalav Bajnari of Jal Shakti (PHE) Mechanical Division South Awantipora
Balance/Leftout works for Newly Constructed Chowkidar quarters at Filter Plant Beoli and Machan of Water Supply Scheme Doda 09 No Newly Developed Habitation LUP No. 2317 under UT Capex on JKSSR 2022
Construction Testing Commissioning of 0.25 Lac Gallons Capacity OHT of Shell type with staging height of 22 mtrs including construction of sluice chamber near Hostel of Kashmir University Delina Water Supply Scheme Delina
Construction of 05 Nos. R.C.C. Ground Service Reservoir 15000 Gallons Capacity 01 No. at Zangra and 02 Nos. 5000 Gallons and 02 Nos. 3000 Gallons Capacity for Water Supply Scheme Kuddhar under Languishing.
Construction of 01 No. Inlet Tank at source, 20 No. Water Storage Tank at various spot and Chain Link Fencing around Civil Structures of Water Supply Scheme Gurmul under Languishing (JKIDFC) re-tendered
Supply, Installation, Testing and Commissioning of Electro-Mechanical equipments at water supply scheme New Logripora including construction of New clear water sump of 10,000 Gallons capacity at Reshkulbal Stage-2nd under District Capex.
Construction of Water Supply Scheme Jhulla Chidi Maidanan by way of Construction/Commissioning and Testing of Intake Chambers Protection works, , Chain Link fencing providing and laying of GI Pipes and other allied works
Construction of GSRs 5000 Gls GSR five Number,10000 Glns one Number, ,Pump Room two Number, including compound wall, entrance gate,R.M, pipe network for Water supply scheme Tanvi Dharan Mohra under JJM
Construction of GSRs 5000 Glns one Number, 10000Glns five number, pump rooms two nos. including compound wall, entrance gate,R.M pipe network for Water supply scheme Dheri Hundi Dakki Narman Behra under JJM
Construction of GSRs 5000 Gls GSR one Number 10000 Glns five Number Pump Room(one Number Spring Cover Zero including compound wall entrance gate, pipe network for Water supply scheme SheikhanBerja under JJM
PITC of pumping machinery alongwith Electro-Mechanical Components at different locations of Water Supply Scheme BAGLA of Jal Shakti PHE MECH Division Rajouri UT of J AND K under JJM on Turnkey basis
Water Supply scheme Draman under JJM , Components Construction of 4000 glns per hour capacity Slow Sand Filteration Plant, Dug Well, Pump room Building , 10000 Glns Sump Tank and compound wall at WSS Draman
Water Supply scheme Larkutti under JJM , Components Construction of 4000 glns per hour capacity Slow Sand Filteration Plant, Dug Well, Pump room Building , 10000 Glns Sump Tank and compound wall at WSS Larkutti
Construction of Water Supply Scheme Braripora Mayan Bijhama by way of Construction/Commissioning and Testing of Intake Chambers Protection works, Chain Link fencing, providing and laying of GI Pipes and other allied works
Construction of Water Supply Scheme Pehlipora A B by way of Construction/Commissioning and Testing of Intake Chambers Protection works, Chain Link fencing, providing and laying of GI Pipes and other allied works
Construction of Water Supply Scheme Braripora Mayan Bijhama by way of Construction/Commissioning and Testing of Intake Chambers Protection works, Chain Link fencing, providing and laying of GI Pipes and other allied works
Construction, Testing and Successful Commissioning of Slow Sand Filtration Plants/Filtration Gallery and Chain Link Fencing Around the Structure at Spots of Water Supply Scheme Punekhar Malwana under Jal Jeevan Mission (JKSSR 2020)
Construction, Testing and Successful commissioning of Filtration Gallery 04 No. of 1000 GPH Capacity and Chain Link Fencing Around the structure at Spots of Water Supply Scheme Kandhote Lift under Jal Jeevan Mission
same as above
samme as above
same as above
same as above
same as above
same as above
same as above
same as above
same as above
same as above
JJM