Loading…
Loading…
6,178 results • Best match
Water Supply Schme Bhalaipur Purba Block Rayya District Amritsar under PRWSSIP 2a i and JJM
P/L Water Supply Lines in Ward no. 20, 21 and 22, East Constituency, Amritsar
P/L OF WATER SUPPLY LINE NEW TUBEWELL SAVITARY ENCLAVE TO SUNRISE OHSRM MC ZIRAKPUR
Replacement of 4 inch PVC Water Supply line in various area of Ward No.26
Providing and Laying Water Supply and Sewerage Line in SSST Nagar Shri Chand Colony, Patiala.
Replacement of Water supply line at Ajay and Subedar wali gali ward 62 Zone 8
Maintenance of water supply line of various sizes in various area of Ward No.33
For One year Contract of 10 Fitter Colies for Maintenance of water Supply pipe line
Annual Operation And Maintance Of Tubewells and Water Supply Line (2025-26)In Dhakola Zone
REPAIR/ MAINT OF WATER SUPPLY NETWORK SYSTEM IN DOMESTIC AREA AT AIR FORCE STATION PATHANKOT
REPAIR AND MAINT OF DG SET AT WATER SUPPLY INSTALLATION UNDER GE WEST FEROZEPUR CANTT
Repair / Maint of external water supply at Dholewal, CG Complex and Doraha under GE Ludhiana.
SPL REPAIR TO REPLACE BER DG SETS OF WATER SUPPLY INSTALLATIONS UNDER GE(WEST) PATHANKOT
MANNING AND OPERATION FOR CERTAIN WATER SUPPLY AND AC INSTALLATION AT AIR FORCE STATION PATHANKOT
Laying of Water Supply line 100mm dia DI Line in different areas of Zone 6
Annual estimates for repair of Water Supply and Sewer lines under Surgical and Leather complex
Operation and maintenance of tubewells, water supply line zone Baltana-1 (2021-22), M.C. Zirakpur.
Operation and maintenance of tubewells, water supply line zone Baltana-2 (2021-22), M.C. Zirakpur.
Laying 2 inch GI water supply line in Fauji wali Gali Ekta Nagar Ward 13
ANNUAL ESTIMATE FOR REPAIR AND MAINTENANCE OF WATER SUPPLY AND SEWERAGE SYSTEM IN W.NO.24,25,26,27
ANNUAL ESTIMATE FOR REPAIR AND MAINTENANCE OF WATER SUPPLY AND SEWERAGE SYSTEM IN W.NO.72,74,75,76
P/L WATER SUPPLY LINE MISSING LINK IN WARD NO 23 AND 24 MC ZIRAKPUR
Annual Operation And Maintance Of Tubewells and Water Supply Line (2025-26)In Lohgarh Zone
P/L Water Supply and Sewerage in wards 4,5,6,7,8,9,10 and 61 North Constituency. 3rd Attempt
Replacement of old AC Water Supply pipe line with DI pipe in Anand Nagar, Kharar.
Annual Estimate of Water Supply and Sewerage System in Ward no. 11,12 zone 9 Central
Repair & replacement of water supply pump set at New Customs Colony, Ranjit Avenue, Amritsar. (PB).
ANNUAL ESTIMATE FOR REPAIR AND MAINTENANCE OF WATER SUPPLY AND SEWERAGE SYSTEM IN W.NO.37,38,39,40
Annual Estimate of Water Supply and Sewerage System in Ward no. 22,25,29 zone 5 Central
Repair and rewinding of submersible motor and pump set for water supply pumps M.C. Kapurthala.
Annual Estimate of Water Supply and Sewerage System in Ward no. 19,20,21 zone 5 Central
SUPPLY OF MANPOWER FOR MAINTAINCE OF WATER SUPPLY AND SEWER LINES OR DISPOSAL IN CITY
Repair and Renovation of room for fire brigade Staff at markit commette water supply tanki
Replacement of 4 inch PVC Water Supply line in various abadies of Ward No.44
Providing House Connection for new and Existing Pipe Line, Prov. and Laying jointing, testing PVC pipe, specials for Distribution system, Dismantling of brick on edge, Sluice valves, S.V. Chambers, painting of sign board, Chlorinator , Repair
Operation and Maintenance of Water Supply and Sewerage System at Mullanpur Town Distt. Ludhiana for the period of 01.04.2023 to 31.03.2024
Providing and installing 200 mm id straight tubewell drilling of 500 mm 20 of suitable size up to 180 mtr Depth Rising main Pumping Machinery
Providing and Installing deep Tubewell 200 mm i/d straight 150 mtr depth with reverse rotary rig 20 mtr stainless strainer , P/F Pumping machinery, OHSR 100 KL Capacity, Pump Chamber, All Civil work, complete in all respect.
Providing and installing TW 250 x 200 mm I d depth 150 mtr with Reverse Rotary Rig, Providing and installing Submersible pumping set reputed make discharge 731 LPM Head 79.00 mtr (22.50 BHP)
Providing, Stringing out PVC pipes , Household Connections, Water Meter, Painting/ Installation of Sign Board etc. complete in all respect and all other works contgent there to
Work for Tubewell, OHSR, Civil and 3 months Operation and maintenance and etc.
ProvandInstallingstraighttubewellof150mmid150mtrdeepwith10mtrStainlessstrainerwithHandBoringMachineConstofPumpChamberSize250mtr250mtrswithWCPumpingMachineryandConst15000Ltrscapacityhavingheightof13mBottom1550mtruptoFSLAllCivilWorkscompleteinallrespec
Replacement and Repair of damaged water supply and sewerage line and Const. of M.H. Chambers and Prov. and Laying of 4 inch,3 inch and 6 inch dia PVC water supply line in Ward No.8
PROVIDING AND FIXING WOODEN FURNITURE, WOODEN PANELLING FOR THE OFFICE OF CHIEF ENGINEER, PDANDQA, WATER SUPPLY AND SANITATION, PUNJAB AND SUPERINTENDING ENGINEER, WATER SUPPLY AND SANITATION, CIRCLE PUNJAB, CHANDIGARH AT SCO NO. 44-45 (GROUND FLOOR,
Replacement and Repair of damaged water supply and sewerage line and Const. of M.H. Chambers and Prov. and Laying of 4 inch,3 inch and 6 inch dia PVC water supply line in Ward No.9
Replacement and Repair of damaged water supply and sewerage line and Const. of M.H. Chambers and Prov. and Laying of 4 inch,3 inch and 6 inch dia PVC water supply line in Ward No.10
PROVIDING AND INSTALLING NETWORKING, EPABX AND PUBLIC ADDRESS SYSTEM (LOW VOLTAGE) IN THE OFFICE OF CHIEF ENGINEER, PD AND QA, WATER SUPPLY AND SANITATION, PUNJAB AND SUPERINTENDING ENGINEER, WATER SUPPLY AND SANITATION, CIRCLE PUNJAB, CHANDIGARH AT
O and M of Water Supply and Sewerage Scheme at Maloud Distt. Ludhiana for the period of 12 months 01.04.2022 to 31.03.2023
Operation and Maintenance of Water Supply and Sewerage System at Mullanpur Distt Ludhiana for the period 01.07.2020 to 31.03.2021 for 9 Months
Providing and Fixing of pipe for water supply line after removing after un-serviceable old pipes in Quarters of Police Line Amritsar