Loading…
Loading…
51,669 results • Best match
Annual Operation and maintenance of different dia distribution pipe line at Mangalpur Zone and Bansra under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. (w.e.f. 01.01.2024 to 31.12.2024)
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Debottar Bakshiganj Water Supply Scheme TW No.- I under NMD-II,PHE.Dte,Apd.
Laying of 110 mm dia and 90 mm dia HDPE pipe line including chokage cleaning and other allied works of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Part-A)
Laying of 110 mm dia and 90 mm dia HDPE pipe line including chokage cleaning and other allied works of Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Part-B)
Sl. No. 01... Construction of Boundary wall with drain and compound filling including laying of pipeline i.c.w. Reservoir at Head works site for BAIKUR WATER SUPPLY SCHEME under Jalpaiguri Division , P.H.E. Dte.
Supply and delivery of electrical Iron materials to WBSEDCL for effecting power connection of P H No. I Zone XVIII at Sridharkathi and adjoining mouzas water supply scheme Dist-24 PGS. N
Laying of different dia MS and HDPE Pipe line and mending works at Chanchani (Sansad-XII) of Ukhra area under Ukhra Water Supply Scheme under RCFA Division-I PHE Dte. (Part-D)
Annual Operation and maintenance of different dia distribution pipe line at Mangalpur Zone and Bansra under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. (w.e.f. 01.01.2025 to 31.12.2025)
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Lawchapra water supply scheme, TW no III under Northern Mechanical Division-II, PHE Dte.Alipurduar.
Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Data Baba Water Supply Scheme in Birbhum Sadar Sub-Division under Birbhum Division, PHE Dte. (2nd Call)
Construction of Boundary wall and allied works at 1st. Tube well site cum Head Work Site for Proposed Pipe Water Supply Scheme of Bakra and its adjoining Mouzas, Block Sankrail, District Jhargram
Additional work for the laying of Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-XI (Part-8 Distribution Segment) under RCFA Division-I PHE Dte.
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Augmentation of Krishnapur Water Supply Scheme TW No.I under NMD-II,PHE.Dte,Apd.
Annual Operation and maintenance of different dia distribution pipe line and guarding arrangement at Baidyanathpur under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. (w.e.f. 01.01.2024 to 31.12.2024)
Operation and Maintenance of Rising Main ( pipe line (HDPE, PE-80) of Barasukjora Water Supply Scheme within (Binpur-II) Block within Jhargram Sub-Division under Jhargram Division, PHE Dte. For 12 months.
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Augmentation of Baragodaikhora Water Supply Scheme TW No.I under NMD-II,PHE.Dte,Apd.
Annual Operation and maintenance of different dia distribution pipe line and guarding arrangement at Baidyanathpur under RCFA Part-II Water Supply Scheme under RCFA Division-I PHE Dte. (w.e.f. 01.01.2025 to 31.12.2025)
4 nos Pipe water supply Scheme including two years Operation and Maintainance work for Ayambar PWSS, Bara Bhagia PWSS, within Patashpur-I Block and Kalyanpur PWSS, Malikpur PWSS within Patashpur-II Bloc
Additional work for the laying of Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-XI (Part-7 Distribution Segment) under RCFA Division-I PHE Dte.
Sl. No. 05..Construction of Boundary wall with Gate and Necessary Pipeline Repairing and Sanitary Works for the Head Works Site of Chamurchi Bazar Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte
Providing and installation of pumping machineries and other electromechanical accessories for Augmentation of Dhanara and its adjoining mouzas water supply scheme under Jal Jeeven mission Progremme under Bankura Mechanical Division, P.H.E. Dte
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Sankosh water supply scheme, TW no II under Northern Mechanical Division-II, PHE Dte.Alipurduar.
Construction of Boundary wall and allied works at 1st. Tube well site cum Head Work Site for Proposed Pipe Water Supply Scheme of Gobindapur and its adjoining Mouzas, Block Sankrail, District Jhargram.
Additional supplying laying 280 mm 225 mm dia HDPE pipe line for Improvement of RCFA Part-I Water Supply Scheme within command area of Zone-VIII under RCFA Division-I PHE Dte.
Sl. No. 06..Installation of Iron Elimination Plant including construction of Blower Room (3.60MX3.00M ) Size, ..........at Head Work Site of PASCHIM SALBARI (Zone-II) Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte.
LDS, FHTC with new construction of R.C.C. OHR of capacity 750 cum and staging height 20.00 mtr. for Augmentation of Tabakhali water supply Scheme within Sutahata Dev. Block under Tamluk Division, P.H.E.Dte.
Additional work for the laying of Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-XI (Part-1 Distribution Segment) under RCFA Division-I PHE Dte.
Supply, installation, commissioning of electro-mechanical components at T/W no. II of Saguna Water Supply Scheme(Replacement Tubewell) in the District of Nadia under Eastern Mechanical Sub-Division-II , PHE Dte.
Sinking of 1 (One) no river bed tube wells including collecting main other allied works at Damalia Damodar river under Amritnagar Zone-II Water Supply Scheme under RCFA Division-I PHE Dte.
Extension by HDPE Pipeline instead of DI pipeline for the left out villages for proposed Augmentation of Bhadrapur Zone-I Water Supply Scheme under Nalhati Sub-Division within Birbhum Division, PHE Dte
Sinking of 4 (Four) nos river bed tube wells including collecting main and other allied works at Damodar river under (Part-II) Unionpara Water Supply Scheme under RCFA Division- I PHE Dte.
Supply Delivery Installation and Commissioning of Secondary Gaseous Chlorination Arrangement along with Other Allied Works at Chaighari OHR of Central Sector _Part_I Surface Based Water Supply Scheme under Berhampore Mechanical_Electrical Division P
Conducting route survey, design rising main network and preparation submission of source augmentation DPR for BAHULA Water Supply Scheme for Implementation of JJM at Pandabeswar Block under RCFA DIVISION-I, P.H.E. Dte.
Additional work for the laying of Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-XI (Part-5 Distribution Segment) under RCFA Division-I PHE Dte.
Construction of Boundary wall and allied works at 1st. Tube well site cum Head Work Site for Proposed Pipe Water Supply Scheme of Kendana and Kuliana PWSS, Block Gopiballavpur-II, District Jhargram
Conducting route survey, design rising main network and preparation submission of source augmentation DPR for Panchgachia Majiara Water Supply Scheme for Implementation of JJM at Barabani Block under RCFA DIVISION-I, P.H.E
Supply and Delivery of residual chlorine testing kits and DPD-1 Tablet for residual chlorine at different ground water based pipe water supply scheme under Eastern Mechanical Sub-Division-II , PHE Dte.
Restoration of Laying distribution system by replacing of damaged AC pipeline with UPVC pipeline and constructon of boundary wall, toilet and repairing of pump house (2nd site) at Narathali Water Supply Scheme
Day to day repair, Operation and maintenance of distribution system, rising main and allied pipelines for Niruli water supply scheme, Minakhan block under Hasnabad Sub-Divn. P.H.E. Dte. (Period - For 6 Months).
Sinking of 2 (Two) nos. river bed tube wells including collecting main for drought like situation on riverbed Ajoy at Bagdiha under Baghdiha water supply scheme under RCFA Division-I PHE Dte.
Augmentation Modification of EM works related to CWR and existing pumps and three months trial run Kulti Area for Water Supply Scheme under AMRUT 2.0 within Asansol Municipal Corporation on Turnkey Basis
Repair and Renovation of Pump house and Cholorine Room under at Augmentation of Silda Pond Based Water Supply Scheme at Binpur-II Development Block under within Jhargram RWS Sub- Division ,PHE Dte
Conducting route survey, design rising main network and preparation submission of source augmentation DPR for Parasia Water Supply Scheme for Implementation of JJM at Jamuria Block under RCFA DIVISION-I, P.H.E. Dte.
Conducting route survey, design rising main network and preparation submission of source augmentation DPR for BAHADURPUR Water Supply Scheme for Implementation of JJM at Jamuria Block under RCFA DIVISION-I, P.H.E. Dte.
Laying of 150 mm dia DI K9 Rising Main pipe line of Baharampur and its adjoining mouzas Water Supply Scheme within Bhagwanpur-II Block under Contai Sub-Division,PHE Dte .(2nd Call)
Supplying and Laying of HDPE Materials grade PE 100 PN 6 or OPVC pipes pipes including HDD in Distribution system for Proposed water supply scheme at Zone 2 within Alipurduar Municipal Area
Sl. No. 05....Installation of Iron Elimination Plant including construction of Blower Room (3.60MX3.00M ) Size......at Head Work Site of PASCHIM SALBARI (Zone- I) Water Supply Scheme under Jalpaiguri Division, P.H.E. Dte.
Annual Operation and maintenance of distribution and rising main pipe line including FHTC at Andharia, Baguli, Chinchurbil, Churulia, Rakhakura, Joynagar, Desher mohan, Madhabpur and Madhudanga Mouza under Churulia Water Supply Scheme under
Annual Operation and maintenance of Garden including guarding at Darbardanga Head Work Site under Jamuria Rural Zone- I and II Water Supply Scheme under RCFA Division-I PHE Dte. (For 365 Days)
Annual Operation and maintenance of Caretaking etc. Kalyaneswari Inspection Bungalow, New, Old Annexe and Bankim Nibas under RCFA Part-I Water Supply Scheme under RCFA Division-I PHE Dte. (For 365 Days)