Loading…
Loading…
51,711 results • Best match
Construction of RCC column structure Boundary Walls including Jail type gate at Head Work Site and 2nd Tube well site of Faridpur Piped Water Supply Scheme under Raiganj Division, P.H.E. Dte.
Construction of Boundary Wall, Laying rising main pipe for inter connection between Proposed T.W and Distribution of NATIBPUR Piped Water Supply Scheme under ARAMBAGH Sub-Division of Hooghly Division P.H.E. Dte.
Providing And Installation of Electro_Mechanical Equipments and Allied Works for Arsenic Removal Plant at BHANDAR KHOLA (Phase-II) Piped Water Supply Scheme Block_ KRISHNANAGAR-I Dist. - Nadia under EMD, PHE Dte.
Providing Functional House Hold Tap Connection work at Zone-XII of Gangarampur Eastern Sector under Sub-Surface Based Piped Water Supply Scheme at Gangarampur Block in the District of Dakshin Dinajpur.
Construction of switch rooms and Rising main at different TW site for Baidyapur (Zone-I) Piped Water Supply Scheme under Kalna - II Block, District- Purba-Bardhaman under Burdwan Division, PHE. Dte.
Supply, Delivery, construction, commissioning and completion of all Civil works including all allied, related and enabling works for Augmentation of Chuamasina Zone-A Piped Water Supply Scheme, Block - Bishnupur, Dist- Bankura.
Construction of 900 M3 Capacity OHR with FHTC of ARIDANGA ZONE-I Piped Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte. in the District of Malda.
Retrofitting work for providing Functional Household Tap Connection FHTC from existing distribution system of Uttar Pirpur piped water supply scheme under Uluberia-II Block under Howrah Division, PHE Dte. (Part-C)
Augmentation of Bamunhati Piped Water Supply Scheme (Part I LDS FHTC of Part III of Abhirampur Village) in Uluberia-II Block of Howrah District under Howrah Division, P. H. E. Dte.
Operation Maintenance of Shyampur (Zone I II), Deuli, Silampur, Maheswarpur, Dakshin Durgapur, Belari, and Bhagabanpur Piped Water Supply Scheme (Block Shyampur-I) under Uluberia sub division of Howrah Division, PHE Dte.
Retrofitting work for providing Functional Household Tap Connection FHTC from existing distribution system of Uttar Pirpur piped water supply scheme under Uluberia-II Block under Howrah Division, PHE Dte. (Part-D)
Providing Functional Household Tap Connection (FHTC) for the balance household .......... from existing distribution system within the command area KULINGRAM Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, PHE Dte.
Providing Functional House Hold Tap connection work at Zone- IV of Tapan Western Sector under Sub Surface Based Piped Water Supply Scheme at Tapan Block in the District of Dakshin Dinajpur.
Providing Functional House Hold Tap connection work at Zone-I of Gangarampur Western Sector under Sub Surface Based Piped Water Supply Scheme at Gangarampur Block in the District of Dakshin Dinajpur.
Construction of 100 Cum capacity R.C.C OHR (based on Departmental Design Drawing) with 20 mtr. staging height, Laying Distribution System .. for augmentation of Gopalkata piped water supply scheme of Gosaba Block
SINKING TUBE WELL 250MM 150MM DIA 250 MTR DEEP BY DR METHOD WITH UPVC PIPE AND UPVC RIBBED STRAINER IN PIPED WATER SUPPLY SCHEME NEAR BARUA BARI IN SANSAD NO XXI
Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of ORGRAM Piped Water Supply Scheme and Sibda Colony habitation, Bhatar Block under Burdwan Division, PHE Dte.
Operation Maintenance of Rampur, Khalatpur, Udaynarayanpur Zone- I II, Sitapur, Sibpur, Khorda Etarai and Pancharul Piped Water Supply Scheme (Block Udaynarayanpur) under RWS Howrah sub division of Howrah Division, PHE Dte.
Providing Functional House Hold Tap Connection along with platform under Jal Jeevan Mission for Kalkut Piped Water Supply Scheme Zone II within Matigara Block under Siliguri Sub Division, P.H.E.Dte. Part I.
Providing And Installation of Electro-Mechanical Equipments and Allied Works for Arsenic Removal Plant at KULGACHI Phase-II Piped Water Supply Scheme, Block Krishnagar-I, Dist. Nadia Under EMD, PHE Dte
Laying of Parallel/ Dedicated Pipeline and Restoration of Road of SHARANPUR Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Providing Functional House Hold Tap connection for Zone- XIII of Tapan Eastern Sector under Sub Surface Water Based Piped Water Supply Scheme for Tapan Block in the District of Dakshin Dinajpur.
Providing Functional Household Tap Connection(FHTC) from existing and new proposed distribution system within the command area of Kulia Piped Water Supply Scheme at Baduria Block under Barasat Division, PHE Dte.
Construction of boundary wall at Head Work Site for Ground Water Based at Chimta (Zone-II) Piped Water Supply Scheme, Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte.
Implementation of Ground Water Based Mini Piped Water Supply Scheme(Maximum 100 House Hold) in Jugiamer village under Raiganj Block in the District of Uttar Dinajpur under Raiganj Division, P.H.E. Dte.
Construction of RCC Column Structure Boundary Walls including Jail type Gate at Head Work Site and 2nd Tube Well Site of KHOWASPUR piped Water Supply Scheme under Raiganj Division PHE Dte
Supply Delivery and installation of Breaker Unit at Kukrakuri under Chhatna, Saltora Block Sub-Surface Water Based Piped Water Supply Scheme under Bankura Mechanical Division, P.H.E. Dte. Block Saltora, Dist- Bankura
Construction of boundary wall including land development at 2nd Tube well site of SHURA Zone II Piped Water Supply Scheme in Jamalpur Block under Burdwan Division, PHE Dte. (Length - 60 Mtr.)
Retrofitting work for providing Functional Household Tap Connection FHTC from existing distribution system of kanpur Rejuvenation piped water supply scheme under Amta-I Block under Howrah Division, PHE Dte. Part-B
Construction of boundary wall at Head Work Site for Ground Water Based at Kumirmari Zone-II Piped Water Supply Scheme, Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte.
Relaying of PMGSY-damaged pipeline due to road construction along with allied works at Bansberia Piped Water Supply scheme in Krishnanagar-I Block under Nadia Arsenic Civil Division-II,P.H.E. Dte.
Laying of Distribution System at Nutun Tofi, Jalimtola, Sripur Colony, Sripur, Bakhrabaj ,for Hamidpur Piped Water supply scheme at Kaliachak-II Block under Malda Malda Arsenic Area W/S Division, P.H.E.Dte
Construction of Boundary Wall, Laying rising main pipe for inter connection between Proposed T.W and Distribution of RASULPUR Piped Water Supply Scheme under ARAMBAGH Sub-Division of Hooghly Division P.H.E. Dte.
Providing Functional House Hold Tap Connection in connection with Retrofitting for Hili Piped Water Supply Scheme at Hili Block in the District of Dakshin Dinajpur under Balurghat Division, P.H. Engineering Dte.
Laying distribution pipe line for piped water supply scheme for Domran and its adjoining mouzas at Hili Block in the District of Dakshin Dinajpur under Balurghat Division P.H.Engineering Dte Part - II
Implementation of Ground Water Based Mini Piped Water Supply Scheme(Maximum 100 House Hold) in Chakbhabanipur village under Kaliaganj Block in the District of Uttar Dinajpur under Raiganj Division, P.H.E. Dte.
Providing Functional House Hold Tap Connection work at Zone-IX of Gangarampur Eastern Sector under Sub-Surface Based Piped Water Supply Scheme at Gangarampur Block in the District of Dakshin Dinajpur.
Additional Work for providing HDPE Pipe 20 mm OD, PE100, PN16 for piped water supply scheme from 7th mile Jhora to Algarah bazar DIF. under kalimpong Block ii under Kalimpong District
Construction of boundary wall including land development at Headworks site of DERIAPUR Piped Water Supply Scheme in Raina-I Block under Burdwan Division, PHE Dte. (Length - 130 Mtr., 52 nos Column)
Laying of Rising Main including Specials and Valves for Bamangram Piped Water Supply Scheme at Bamongola Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal. (2nd Call)
Operation Maintenance of Bargachia Zone V, Bargachia Zone VI, Bargachia Zone VII, Ichapur and Sealdanga Piped Water Supply Scheme (Block Jagatballavpur) under Howrah Sadar sub division of Howrah Division, PHE Dte.
Providing 100 percent FHTC and Laying distribution system from Big dia deep Tube Well under ground water based piped water supply scheme at Chakraborty Abad (Kalabaru,J.L-114) of Baruipur Block
Construction of boundary wall at Head Work Site for Ground Water Based at Amtali (Zone-I) Piped Water Supply Scheme, Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte.
Construction of 600 Cum capacity R.C.C OHR (based on Departmental Design and Drawing) with 20 mtr. staging height including foundation, pipeline connection .. of Goranbose piped water supply scheme of Basanti Block
Distribution System with FHTC work and construction of Boundary wall at OHR Site of Saltore-Hijuli Piped Water Supply Scheme of Raghunathpur Sub-Division under Purulia Division, PHE Dte. Part-II
Supply, Delivery, construction, commissioning and completion of all Civil works including all allied, related and enabling works for Augmentation of Chuamasina Zone-B Piped Water Supply Scheme, Block - Bishnupur, Dist- Bankura .
Retrofitting work for providing Functional Household Tap Connection FHTC from existing distribution system of Paschim Gazipur piped water supply scheme under Amta-II Block under Howrah Division, PHE Dte. Part-B
Augmentation of Bamunhati Piped Water Supply Scheme (Part O LDS FHTC of Part IX of Abhirampur Village) in Uluberia-II Block of Howrah District under Howrah Division, P. H. E. Dte.
Laying of rising main and additional pipeline for distribution system, construction of Boundary Wall, pump house, approach road and land development for RASHKHALI Piped Water Supply Scheme of Bishnupur-I Block
Construction of boundary wall at CWR for Augmentation of Ground water Based at Gosaba (Zone- II) Piped Water Supply Scheme Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte.