Loading…
Loading…
51,711 results • Best match
Augmentation of Bamunhati Piped Water Supply Scheme (Part L LDS FHTC of Part VI of Abhirampur Village) in Uluberia-II Block of Howrah District under Howrah Division, P. H. E. Dte.
Laying of Additional Pipeline and other ancillary works for RANIGANJ Piped Water Supply Scheme for installation of FHTC Work under Islampur Sub-Division P.H.E. Dte. under Raiganj Division, P.H.E Dte.,U.D.
Providing and installation of Low Lift pumping machineries and other electromechanical accessories for Ground water based Krishnanagar (Manachar) piped water supply scheme under Bankura Mechanical Division, P.H.E Dte.Block Barjora Dist Bankura
Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Piped Water Supply Scheme for Chirulia-Chatla Zone-3 Egra I Block under JJM Program under MMD PHE Dte.
Sl No 05 Providing functional house hold tap connection under Jal Swapno programme for Guabari village of Guabari piped water supply scheme at Phansidewa block under Siliguri Sub Division PHE Dte
Existing dismantled concrete road Construction of S V Chamber for BAGILA Piped Water Supply Scheme at various mouza under memari-I block within Burdwan Sub-Division under Burdwan Division, PHE Dte.
Construction of boundary wall with gate,drain,Land development and pathway and laying pipe line at 2 nd site of uttar Mouamari piped water supply scheme under Jalpaiguri Division, P.H.E. Dte.
Laying rising main pipe for inter connection between Proposed T.W and Distribution including Protection work of TIROL ZII Piped Water Supply Scheme under ARAMBAGH Sub-Division of Hooghly Division P.H.E. Dte.
Providing FHTC and extension of UPVC distribution pipeline at Raipur, Gumri, Namalpur and Mahipal habitation for RAIPUR Piped Water Supply Scheme at Burdwan - II Development Block under Burdwan Division, PHE Dte.
Additional work for Laying of UPVC pipeline, Construction of Culvert and Approach road of LOKHAIPUR Piped Water Supply Scheme in Suti-II Block of Jangipur Sub Division under Murshidabad Division, P.H.E.Dte.
Laying of Distribution System at Kabirajtola, Chowdhury Para for Sadipur Piped Water supply scheme at Kaliachak-II Block under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda.
Providing, and installation of Flow Meter with other electro-mechanical accessories at Intake Kukrakuri of Chhatna Saltora Sub -Surface piped water supply scheme under Bankura Mechanical Division, PHE Dte. Dist Bankura
Providing Functional House Hold Tap Connection work at Zone-XIV of Gangarampur Eastern Sector under Sub-Surface Based Piped Water Supply Scheme at Gangarampur Block in the District of Dakshin Dinajpur.
Construction of RCC column structure Boundary Walls including Jail type gate at Head Work Site and 2nd Tube well site of Kamartor Piped Water Supply Scheme under Raiganj Division, P.H.E. Dte.
Construction of Approach Road for (Head Work Site and 2nd Tubewell site), Guard wall at OHR side, HDD Boring in connection with Jal Jeevan Mission (JJM) Rampur Piped water Supply Scheme
Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Serua Piped Water Supply Scheme at Bamunara village village, ................. Bhatar Block under Burdwan Division,PHE Dte.
Laying Rising Main from Pump Houses to Over Head Reservoir with necessity connections for Augmentation of Kranti ZoneII Piped Water Supply Scheme icw Jal Jeevan Mission under Jalpaiguri Division PHE Dte
Providing Functional House Hold Tap Connection Under Jal Swapna Programme for BADMULUK KISMAT Piped Water Supply Scheme at Balurghat Block in the District of Dakshin Dinajpur under Balurghat Division P.H.Engineering Dte.
Retrofitting work for providing Functional Household Tap Connection(FHTC) from existing distribution system of kanpur Rejuvenation piped water supply scheme under Amta-I Block under Howrah Division, PHE Dte. (Part-A)
Construction of Arsenic-cum-Iron Removal Plant (AIRP) for Sadipur Piped Water supply scheme at Kaliachak-II Block under Malda Arsenic Area W/S Division, P.H.E.Dte. in the District of Malda.
Providing Functional Household Tap Connection under Jal Swapno Programme for Rupandighi and Sahananda village of Guabari Piped Water Supply Scheme at Phansidewa block under Siliguri Sub Division PHE Dte Part B
Construction of Arsenic-cum-Iron Removal Plant (AIRP) at Purba Saidpur Piped Water Supply Scheme of Manikchak Block under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda.
Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of PALASON Piped Water Supply Scheme at Raina-I Block under Burdwan Division, PHE Dte._2ND CALL
Construction of 700 cum capacity R.C.C OHR (based on Departmental Design Drawing) with 20 mtr. staging height ..for augmentation of Bansra (Zone-I) piped water supply scheme of Canning-I Block
Restoration of damaged pipeline of distribution main at Narayanpur, Dhandalsa, Kamarpara Roypara, Haribati Mohanpur and Ambona village within Banpas piped water supply scheme within Bhatar Block under Burdwan Division, P.H.E. Dte.
Implementation of Ground Water Based Mini Piped Water Supply Scheme(Maximum 100 House Hold) in Balahar village under Kaliaganj Block in the District of Uttar Dinajpur under Raiganj Division, P.H.E. Dte.
Day to Day Operation, efficient monitoring and Maintenance in all respect for Zone - XII of Gangarampur Eastern Sector under Sub Surface Based Piped Water supply scheme under Balurghat Division, PHE Dte.
Retrofitting work for providing Functional Household Tap Connection FHTC from existing distribution system of Paschim Gazipur piped water supply scheme under Amta-II Block under Howrah Division, PHE Dte. Part-D
Augmentation of Bamunhati Piped Water Supply Scheme (Part N LDS FHTC of Part VIII of Abhirampur Village) in Uluberia-II Block of Howrah District under Howrah Division, P. H. E. Dte.
Preparation of Details Project Report (DPR) incl. route survey in connection with augmentation of Porjhar Piped water supply scheme under Rajganj block , Jalpaiguri District under Siliguri W/S Division, PHE Dte.
Relaying and Repairing of damage Pipeline at different places at Chandidas Nanoor Piped Water Supply Scheme to increase functionality at Nanoor Block under Bolpur Sub-Division within Birbhum Division, PHE Dte.
Restoration and Maintenance of Pump House(2nd Pump Site) Boundary Wall with Gate of Debiganj Piped Water Supply Scheme under Islampur Sub-Division PHE Dte.under Raiganj Division,PHE Dte.,U Dinajpur.
Repair and renovation of the pump House and Others allied Works at Chamt ( T/W No-3) site of Chamta Piped Water Supply Scheme under Siliguri W/S Division P.H.E. Dte.
Trial Run of PUTIA Piped Water Supply Scheme at Harischandrapur - II Block under Malda Division, PHE Dte. in the District of Malda.(Period From 01/11/2024 to 31/01/2025).
Providing, installation of Pumping machineries with other electro allied electro mechanical accessories for Augmentation for Dubrajpur Zone A piped water supply scheme (BRGF Phase I) under Bankura Mechanical Division, PHE Dte
Construction of boundary wall at Head Work Site for Ground water Based at Kamarpara Piped Water Supply Scheme Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte. (2nd Call)
Laying of Rising main with necessary interconnection with TW Distribution System etc at 4 th.TW site under KAMARHATI Z I Piped Water Supply Scheme under RAINA II Block, District Purba Bardhaman
Day to Day Operation, efficient monitoring and Maintenance in all respect for Zone - V of Tapan Western Sector under Sub Surface Based Piped Water supply scheme under Balurghat Division, PHE Dte.
Construction of boundary wall at Head Work Site for Ground Water Based at Amtali (Zone-II) Piped Water Supply Scheme, Block - Gosaba under Canning Sub-Division of Alipore Division, PHE Dte.
Providing Functional House Hold Tap Connection along with platform under Jal Jeevan Mission for Kalkut Piped Water Supply Scheme Zone III under Matigara Block under Siliguri Sub Division, P.H.E.Dte. Part A.
Construction and commissioning of FHTC (Functional House Hold Tap Connection) in Dhepua (111), Chaknara (112), Deuli (113), Narayanpur (114) Dharmapur (133) mouzas by retrofitting of Piped Water Supply Scheme for Chiltore
Laying of Distribution System of Chanchal Zone -I, II and III Piped Water Supply Scheme at Chanchal -I Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
Annual maintenance of Retrofitting for FHTC improvement of piped water supply scheme for Pedong Bazar adjoining areas in connection with for the period of 365 Days Under NKWSMD, PHE Dte. Kalimpong
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room at Aihorani Piped Water Supply Scheme at Old Malda Dev. Block under Malda Division, PHE Dte, Govt. of West Bengal.
Supply,delivery and installation of voltage stabilizer and other allied works for pump house no-II at Kanksa Zone-I(Shilampur) piped water supply scheme under Asansol Mechanical Division, PHE Dte.
Augmentation of Bamunhati Piped Water Supply Scheme (Part F LDS FHTC of Southern Part of Palera Village) in Uluberia-II Block of Howrah District under Howrah Division, P. H. E. Dte.
Emergent work for better functionallyof existing FHTC connection and different diameter Pipeline for MIRZAPUR Piped Water Supply Scheme at Bamangola Dev. Block in the District Malda under Malda Division, PHE Dte.
Construction of 450 Cum. capacity R.C.C OHR (based on Departmental Design and Drawing) with 20 mtr. staging height ..for Augmentation of Uttar Angadberia piped water supply scheme of Canning-I Block
Repairing works of Pump House at Head Work Site of Badmuluk Kismat Piped Water Supply Scheme within Balurghat Block, in the District of Dakshin Dinajpur, under Balurghat Division, P.H. Engineering Dte.
Construction of 400 M3 Capacity OHR with FHTC of ARIDANGA ZON-II Piped Water Supply Scheme at Ratua-II Dev. Block under Malda Division, PHE Dte. in the District of Malda.