Loading…
Loading…
51,599 results • Best match
Installation of Piped Water Supply System at Najrul SSK under Jharaltagram - I GP under 15th FC Fund
Installation of Piped Water Supply System at Bamantari SSK under Jharaltagram - I GP under 15th FC Fund
Providing piped water supply by installation of Submersible pump at Maa Manasa Mandir at Harishpur Khotel Para
Providing, installation of Pumping machineries with other electro-mechanical accessories for newly sunk TW No-I, TW No-II and TW No-III of Rampur Piped water supply scheme Block Patrasayar under Bankura Mechanical Division, PHE Dte. Dist Bankura
Construction of 250 cum capacity 20 Mtr staging height RCC Over Head Reservoir (Pipe connection and cost of pipes, specials at (Zone-VI) for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Providing, installation of Pumping machineries with other electro-mechanical accessories for newly sunk TW No-I, TW No-II and TW No-III of Danna Piped water supply scheme Block Patrasayar under Bankura Mechanical Division, PHE Dte. Dist Bankura
Construction of 900 cum capacity 20 Mtr staging height RCC Over Head Reservoir (Pipe connection and cost of pipes, specials at (Zone-XI) for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Construction of 900 cum capacity 20 Mtr staging height RCC Over Head Reservoir (Pipe connection and cost of pipes, specials at (Zone-VII) for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for AUGMENTATION OF LAHUGAON PIPED WATER SUPPLY SCHEME, TW No. III (Zone-I), TW-I and II (Zone-II) in the di
Construction of 350 cum capacity 20 Mtr staging height RCC Over Head Reservoir (Pipe connection and cost of pipes, specials at (Zone-IX) for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Balance work and crossing road by trenchless technology in different site connection with distribution network including FHTC and allied work at Andal Block of RCFA Part-II (Zone-12A) Piped water supply scheme under RCFA Division-I PHE, Dte
Supply, Installation commissioning of Gaseous Chlorination arrangement of capacity 0 - 1 kg per hr for piped water supply scheme for Jaigaon Development Area (JDA) based on Sub Surface Water source of River Torsa, Dist. Alipurduar. (Zone-II OHR site
Operation and Maintenance of Rising main Delivery main pipe line (CI/DI/HDPE/uPVC) OHRs IEP and F.H.T.C. with all related structure of Sub-Surface Water Based Piped Water Supply Scheme for Nayagram Block (Part) within Gopiballavpur Sub-Division
Supply, Installation commissioning of Gaseous Chlorination arrangement of capacity 0 - 1 kg per hr for piped water supply scheme for Jaigaon Development Area (JDA) based on Sub Surface Water source of River Torsa, Dist. Alipurduar. (Zone-IV OHR site
Balance work for construction of MS Bridge,Jackpushing and making 50 Nos thrustblock for protection of pipe line and Other allied work at Panagarh under Surface based piped water supply scheme for Panagarh Industrial Park under DWSD,PHE Dte.
Supply, Installation commissioning of Gaseous Chlorination arrangement of capacity 0 - 1 kg per hr for piped water supply scheme for Jaigaon Development Area (JDA) based on Sub Surface Water source of River Torsa, Dist. Alipurduar. (Zone-I OHR site)
Operation and Maintenance of Rising main Delivery main pipe line (CI/DI/HDPE/uPVC), OHR, IEP and F.H.T.C. with all related structure of Sub-Surface Water Based Piped Water Supply Scheme for Nayagram Block (Part), within Gopiballavpur Sub-Division
Construction of boundary wall for raising height, drain and repairing of existing boundary wall for the Head Work site of Maslandapur II Piped water supply scheme in connection with Augmentation work under JJM project within the jurisdiction of Habr
Supply, delivery and fitting Fixing of Pump spares for HSC pump installed at water treatment plant and pumping station at Dejuri , Block Borjora, Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme
Sinking of 4 nos 200 mm dia River bed tube wells in the river Ajoy at Bhaburia Head Work Site under RCFA Part-III (Zone-I) Piped Water Supply Scheme (JJM) under RCFA Division-I PHE Dte. (Part-B)
Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Newly Sunk Tube Well of Pump House No. II and NEW OHR SITE of Zone-II under JOTKAMAL PIPED WATER SUPPLY SCHEME, BLOCK- DOMKAL
Additional works of sinking of 3 (Three) nos. 200 mm dia river bed tube well including collecting main in the river Damodar at Gourbazar H/W Site for Hourbazar Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for AUGMENTATION OF KHARIBARI ZONE - I (TW No. I) and ZONE - II (TW No. I) PIPED WATER SUPPLY SCHEME , in the dist
Operation and Guarding of Gaseous Chlorination system at OHR site Zone-F of Talanjuri under Borjora Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD, PHED
Construction of 350 cum capacity 20 Mtr staging height RCC Over Head Reservoir (Pipe connection and cost of pipes, specials at Gourandi H/W site for Augmentation of Panuria Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Operation and Guarding of Gaseous Chlorination system at OHR site Zone-B of Kotalpukur under Borjora Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD, PHED
Operation, and Guarding of Gaseous Chlorination system at OHR site Zone-I of Joykrisnapur under Borjora Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD, PHED
Operation, and Guarding of Gaseous Chlorination system at OHR site Zone-G of Saulia under Borjora Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD, PHED
Operation and Guarding of Gaseous Chlorination system at OHR site Zone-A at Maliara under Borjora Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD, PHED
Providing, installation of Pumping machineries with other electro-mechanical accessories at Betanal piped water supply scheme (Zone-A and B) for Restoration of flood affected T.W and alied works of Onda and Indus Block PWSS under BRGF(Phase -I)
Supply delivery and fitting fixing of Pump spares of HSC pumps at clear water pumping station at Kukrakuri under Chhatna, Saltora Block Sub-Surface Water Based Piped Water Supply Scheme (BRGF Phase I) under Bankura Mechanical Division, P.H.E. Dte
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for AUGMENTATION OF BUDHARUGAON PIPED WATER SUPPLY SCHEME , TW No I (Zone-II) and TW No. I (Zone-III) in the di
Construction of 150 cum capacity 20 mtr staging height RCC Over Head Reservoir (pipe connection and cost of pipes, specials at Augmentation of Jamuria Rural (Zone-II) Piped Water Supply Scheme under RCFA Division-I PHE Dte. (2nd Call)
Operation, and guarding of gaseous Chlorination system at OHR site Zone-D of Dhadimukha under Borjora Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD,PHED
Special repair and renovation of existing High lift Pump House, Boundary Walls, Guard Room, CWR, Switch Room etc, and allied works at H/W site of Ondal Phase-I Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Operation and Guarding of Gaseous Chlorination system at OHR site Zone-H of Joytunga under Borjora Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD, PHED
Operation, and guarding of gaseous Chlorination system at OHR site Zone-C of Kanchanpur under Borjora Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD,PHED
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for AUGMENTATION OF DALMORE and RAMJHORA TEA GARDEN PIPED WATER SUPPLY SCHEME,TW No.- I of Zone-I AND II under
Supply, Installation commissioning of Gaseous Chlorination arrangement of capacity 0 - 1 kg per hr for piped water supply scheme for Jaigaon Development Area (JDA) based on Sub Surface Water source of River Torsa, Dist. Alipurduar. (Zone-III,PART-A
Additional work of connecting 4 nos collecting main through 300 mm dia manifold with existing CWR at Churulia H/W site for Churulia Piped Water Supply Scheme at different places of Jamuria Block under RCFA Division-I PHE Dte.
Operation, and Guarding of Gaseous Chlorination system at OHR site Zone-E of Gadardihi under Borjora Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD,PHED
Supply delivery and Installation of 40 KVA Servo Motor Operated Copper wound line voltage corrector for Additional Tubewell No-II under Zone II Proposed for Alternative Source under Piped Water Supply Scheme for Jaygaon Development Area under NMD-II,
Ground Water based BARAMALLIKPUR Piped Water Supply Scheme
DAHAR KUNDU(ZONE-I) Piped Water Supply Scheme
Balance work of KULSHUNA Piped Water Supply Scheme
GHOL DIGRUI (ZONE-I) Piped Water Supply Scheme
GHOL DIGRUI (ZONE-II) Piped Water Supply Scheme
AMC Karandighi Zone-II Piped Water Supply Scheme
AUGMENTATION of PURBA RAMNAGAR Piped Water Supply Scheme
MALAYPUR Piped Water Supply Scheme T.W 2 Site