Loading…
Loading…
51,599 results • Best match
Mini Water Supply Scheme with Pipeline near Bagdipara Club of Sansad IX
Drinking water supply scheme at Noldara Manikumar Rai land Soureni I gp
Mini water supply scheme at Pursa Shantipara Sansad VI, Activity ID - 110558413
Chak Bajit and Kankara Shibram Pipe water supply Scheme within Debra Block
Mini water supply scheme at Bandutia Napitpara Sansad XIV, Activity ID - 110563474
Mini water supply scheme at Pursa Panchpara Sansad I, Activity ID - 110556417
RAGRA, SATKULI CHARAR, NOAGAON, RAMPURA Pipe water supply Scheme within Sankrail Block
Drinking water supply scheme at Lower Toklang Taar gaon Soureni I gp
Loyada, Madhabpur, Patna and Radhamohanpur Pipe water supply Scheme within Debra Block
SOLAR WATER SUPPLY SCHEME AT MANGALBARI MOUZA SANSAD NO XIX UNDER MATIALI BATABARI I GRAM PANCHAYET WITHIN MATIALI PANCHAYET SAMITY UNDER 15th FC (FINANCIAL YEAR 2024-25) ACTIVITY CODE- 97728849
CONSTRUCTION OF WATER SUPPLY SCHEME (SUBMERSIBLE) AT JANAKIBARH PRAMANIK PARA , MOUZA-JANAKIBARH , WITHIN BHEMUA GP.
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for MANJA TEA GARDEN PIPED WATER SUPPLY SCHEME ,(Zone-I) TW No. I and (Zone-II) TW No. I in the district of Darjee
Operation, and guarding of gaseous Chlorination system at OHR site Zone-N of Arjunpur under Bankura-II Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD, PHED
Laying of 200 mm dia rising main from Dignala OHR ste to proposed OHR site at Andal BL and LRO office for the proposed Augmentation work of Andal Phase-II B Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Providing, installation of Pumping machineries with other electro-mechanical accessories at Karisunda piped water supply scheme at OHR and CWR site for Restoration of flood affected TW and alied works of Onda and Indus Block PWSS under BRGF(Phase I
Sinking of 2 (Two) nos 200 mm dia river bed tube well including collecting main and other allied works in the river Ajoy at Darbardanga H/W site for Bijoynagar Housing Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Operation and Guarding of pumping machineries and other accessoris installation at T/W No I to IV of Chakuparsole (Zone A) and adj. mouzas ground water based Piped Water Supply Scheme (BRGF Phase I) under Bankura Mechanical Division, P.H.E. Dte.
Construction of Boundary wall including land development, approach road (Length-70 mtr) and drain (Length-160 mtr) at Bansketia OHR site of Improvement of RCFA Part-I Piped Water Supply Scheme under Salanpur Block under RCFA Division-I PHE Dte.
Operation and Guarding of pumping machineries and other accessoris installation at T/W No I to IV of Chakuparsole (Zone B) and adj. mouzas ground water based Piped Water Supply Scheme (BRGF Phase I) under Bankura Mechanical Division, P.H.E. Dte.
Construction of Boundary wall including land development, approach road (Length-65 mtr) and drain (Length-160 mtr) at Malbahal OHR site of Improvement of RCFA Part-I Piped Water Supply Scheme under Salanpur Block under RCFA Division-I PHE Dte.
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for MOHORGON TEA GARDEN AREA PIPED WATER SUPPLY SCHEME, (Zone-I) TW No. I,II and (Zone-II) TW-I in the district of
Construction of 900 cum capacity 20 mtrs staging height RCC Over Reservoir (Pipe connection and cost of pipes, specials at Ondal Block (Zone-2) for Augmentation of RCFA Part-II Piped Water Supply Scheme including Soil Investigation and chlorine Room
Operation and Guarding of pumping machineries and other accessories installation at OHR site T/W No I to IX of Kuldihi and adj. mouzas ground water based Piped Water Supply Scheme (BRGF Phase I) under Bankura Mechanical Division, P.H.E. Dte.
construction of the Service Road 35.00 Mtr. Length and 3.00 Mtr. Wide while 1.00 Mtr. wide road already existing in Head Work Site of Maslandapur- II Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdi
Construction of 350 cum capacity 20 mtr. staging height RCC Over Head Reservoir (pipe connection and cost of pipes, specials at Raniganj Block (Zone-11) for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Supply, delivery and fitting fixing of Non Return Valve on pump delivery line of WTP Dejuri ,Block- Borjora under Bankura-I and II and Borjora Block Surface water based Piped Water Supply Scheme (BRGF Phase-I) under BMD, PHED. , Dist- Bankura.
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for AUGMENTATION OF LALMAN PIPED WATER SUPPLY SCHEME , TW No I (Zone-I) and TW No. I (Zone-II) in the district o
Construction of 900 cum capacity 20 Mtr staging height RCC Over Head Reservoir (pipe connection and cost of pipes, specials at Amritnagar Zone-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman.
Operation and Guarding of Gaseous Chlorination system at OHR site Zone-V of Andharthole under Bankura-I Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD, PHED
Balance work of Laying and Pushing of 600 mm dia RCC (NP3) Hume pipe by adopting trench less technology (e.g. Jack Pushing Method etc) at Pathan Dahwra of Murgasole Mouza under Augmentation for Sub Surface Water Based Piped Water Supply Scheme
Providing, installation of Pumping machineries with other electro-mechanical accessories at Marar Zone-A piped water supply scheme at OHR and CWR site for Restoration of flood affected T.W and alied works of Onda and Indus Block PWSS under BRGF
Construction of Chlorine room (3.50 mtr X 3.50 mtr X 3.0 mtr) and guard room (3.50 mtr X 3.50 mtr X 3.0 mtr) with common wall at Madhaiganj for Sarpi piped water supply scheme under RCFA Division-I PHE Dte
Operation, and guarding of gaseous Chlorination system at OHR site Zone-M of Manaharpur under Bankura-II Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD, PHED
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for AUGMENTATION OF KALKUT PIPED WATER SUPPLY SCHEME, (ZONE-II) TW NO I, II, III AND (ZONE-III) TW NO I, II, III i
Operation and Guarding of Gaseous Chlorination system at OHR site Zone-U of Chaturdihi under Bankura-I Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD, PHED
Laying pushing of 600 mm dia RCC hume pipe (NP3) by adopting trench less technology (e.g. Jack Pushing Method) MS water carrier pipe and other allied works under command area of Tetikhola (Part-E) under Tetikhola Piped Water Supply Scheme,
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for KILARAM PIPED WATER SUPPLY SCHEME, (Zone-I) TW No. I, II and (Zone-II) TW-I in the district of Darjeeling unde
Construction of Chlorine room (3.50mtr X3.50 mtr X 3.0 mtr) and guard room (3.50 mtr X 3.50 mtr X 3.0 mtr) with common wall at Bhaburia H/W site for Sarpi piped water supply scheme under RCFA Division-I PHE Dte
Supply, Installation commissioning of Gaseous Chlorination arrangement of capacity 0 - 1 kg per hr for piped water supply scheme for Jaigaon Development Area (JDA) based on Sub Surface Water source of River Torsa, Dist. Alipurduar. (Zone-V, PART-A O
Operation and Guarding of Gaseous Chlorination system at OHR site Zone-W of Kustara under Bankura-I Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD, PHED
Construction of the Service Road 88.00 Mtr. Length and 3.00 Mtr. Wide while 1.00 Mtr. wide road already existing in Head Work Site of Maslandapur- I Piped Water Supply Scheme in connection with Augmentation work under JJM project within the jurisdic
Supplementary work for improvement of different dia HDPE distribution line and Road Restoration and allied works at Ukhra and Khandra area under Ondal Block of RCFA Part-II (Zone-I) Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for AUGMENTATION OF KAWAKHALI PIPED WATER SUPPLY SCHEME, (Zone-II) TW No. I, II and (Zone-III) TW-I, II in the dis
Sinking of 4 (Four) nos 200 mm dia river bed tube well including collecting main and other allied works in the river Ajoy at Darbardanga H/W site for Bijoynagar Housing Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Construction of 2 nos Boundary Wall (45 m) including land development at Kanksa Zone-II B Pump House no. 5 and 6 site of Augmentation of Gopalpur Piped Water Supply Scheme under Kanksa Block under RCFA Division-I PHE Dte.
Construction of Guard Room (size 6.0 m x 6.0 m x 3.3) at Zone-11 of Raniganj Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for DHEMAL PIPED WATER SUPPLY SCHEME, (Zone-I)TW No.- I and (Zone-II) TW No.-I in the district of Darjeeling under
Operation, and guarding of gaseous Chlorination system at OHR site Zone-L of Chhatrakanali under Bankura-II Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD,PHED
Construction of 450 cum capacity 20 mtrs staging height RCC Over Reservoir (Pipe connection and cost of pipes, specials at Ondal Block (Zone-5) for Augmentation of RCFA Part-II Piped Water Supply Scheme including Soil Investigation and chlorine Room
Operation and Guarding of pumping machineries and other accessoris installation at T/W No I to V of Chuamasina (Zone A) and adj. mouzas ground water based Piped Water Supply Scheme (BRGF Phase I) under Bankura Mechanical Division, P.H.E. Dte.