Loading…
Loading…
51,599 results • Best match
Construction of Boundary Wall with Gate at OHR Site (Length-120 mtrs) at Nimcha village of Raniganj Block for Augmentation of Amritnagar Zone-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman
Construction of 2 nos Boundary Wall (45 m) including land development at Kanksa Zone-II C Pump House no. 5 and 6 site of Augmentation of Gopalpur Piped Water Supply Scheme under Kanksa Block under RCFA Division-I PHE Dte
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for AUGMENTATION OF MADHYA BANSGAON PIPED WATER SUPPLY SCHEME, (Zone-I) TW No. I,II and (Zone-II) TW-I in the dis
Re-Laying of Damaged Pipe Lines during Construction of PMGSY Roads,and Left out pipe line including balance FHTC Within Zone-IV Of Nayagram (Part) Sub-Surface Based Piped Water Supply Scheme Within Nayagram Block Under Jhargram Division, PHE Dte.
Providing, installation of Pumping machineries with other electro-mechanical accessories for newly sunk TW No-I, TW No-II and T/W No-III of Mahaldanga piped water supply scheme under Bankura Mechanical Division, PHE Dte Block Joypur, Dist Bankura.
Providing, installation and commissioning of submersible pumping machinery along with allied Electro-Mechanical works for Newly Sunk Tube Well of Pump House No. I and II of Zone-II under MOMENPUR AND OTHERS PIPED WATER SUPPLY SCHEME, BLOCK- DOMKAL D
Operation and Guarding of pumping machineries and other accessoris installation at T/W No I to III of Chuamasina (Zone B) and adj. mouzas ground water based Piped Water Supply Scheme (BRGF Phase I) under Bankura Mechanical Division, P.H.E. Dte.
Providing, installation of Pumping machineries with other electro-mechanical accessories at T.W No II of Agarda piped water supply scheme for Restoration of flood affected and alied works of Onda and Indus Block PWSS under BRGF(Phase I) under BMD
Operation, and Guarding of Gaseous Chlorination system at OHR site Zone-T of Anchuri/Papurdihi under Bankura-I Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD,PHE
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector forGround Water Based Piped Water Supply Scheme AUGMENTATION OF GROUND WATER JIRANPUR ZONE-I (B),P/H No- I and II A
Construction of 450 cum capacity 20 mtr staging height RCC Over Head Reservoir (pipe connection and cost of pipes, specials at Andal Village for Augmentation of Ondal Phase-II/B Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Construction of 450 cum capacity 20 Mtr staging height RCC Over Head Reservoir (Pipe connection and cost of pipes, specials at Barabani (Zone-XIII) for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte.
Operation, and guarding of gaseous Chlorination system at OHR site Zone-O of Hariyurgara under Bankura-II Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD, PHED
Laying of proposed Rising main (Length- 1085 mtr, 4817 mtr AND 1320 mtr.) of Cha-Sundori Project (JJM- SM/10054) within Lankapara Tea Garden Area Piped Water Supply Scheme, Madarihat-Birpara block of Birpara Sub-Division under Alipurduar Division, PH
Additional works for construction of boundary wall with gate at OHR site (length 150 mtr) and land development with approach road including internal drain at Head Work Site for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Divisio
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for GROUND WATER BASED PIPED WATER SUPPLY SCHEME OF PHULBARI PART-B, TW No.-I and II under NMD-II,PHE.Dte,Alipurdua
Operation, and guarding of gaseous Chlorination system at OHR site Zone-K of Chhirabasta under Bankura-II Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD, PHED
Construction of Chlorine Room of size (4.50 x 3.50 M) at Chora of Pandabeswar Block for Augmentation of RCFA Part-II (Zone-9) Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman (2nd Call)
Installation of New IEP, construction of Blower room, surface drain, platform and up gradation of OHR site, boundary wall etc including 3 months trial run for Improvement of Zone III and IV Piped Water Supply Scheme at Shibtoli and Sahebkachhari
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for BARA PATHURAM PIPED WATER SUPPLY SCHEME, ( ZONE-I) TW No. I, II, (ZONE-II) TW No. I, II and (ZONE-III) TW No.
Repair and renovation of High Lift Pump House, Clorine Room and CWR in the Head Work site of Maslandapur II Piped water supply scheme in connection with Augmentation work under JJM project within the jurisdiction of Habra Sub-Division under Barasat
Supply delivery and Installation of 40 KVA Servo Motor Operated Copper wound line voltage corrector for Additional Tubewell No-I under Zone I Proposed for Alternative Source under Piped Water Supply Scheme for Jaygaon Development Area under NMD-II,PH
Supply delivery and Installation of 40 KVA Servo Motor Operated Copper wound line voltage corrector for Additional Tubewell No-II under Zone I Proposed for Alternative Source under Piped Water Supply Scheme for Jaygaon Development Area under NMD-II,P
Supply delivery and Installation of 40 KVA Servo Motor Operated Copper wound line voltage corrector for Additional Tubewell No-I under Zone II Proposed for Alternative Source under Piped Water Supply Scheme for Jaygaon Development Area under NMD-II,P
Operation and Guarding of pumping machineries and other accessoris installation at OHR site T/W No- I and II of Dengasole and adj. mouzas ground water based Piped Water Supply Scheme (BRGF Phase I) under Bankura Mechanical Division, P.H.E. Dte.
Construction of 600 cum capacity 20 mtrs staging height RCC Over Reservoir (Pipe connection and cost of pipes, specials at Ondal Block (Zone-6) for Augmentation of RCFA Part-II Piped Water Supply Scheme including Soil Investigation and chlorine Room
Operation, and guarding of gaseous Chlorination system at OHR site Zone-P of Kendbani under Bankura-II Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD, PHED
Construction of 1000 cum capacity 20 mtrs staging height RCC Over Reservoir (Pipe connection and cost of pipes, specials at Ondal Block (Zone-12A) for Augmentation of RCFA Part-II Piped Water Supply Scheme including Soil Investigation and chlorine Ro
Operation, and Guarding of Gaseous Chlorination system at OHR site Zone-S at Jagadalla under Bankura-I Block Dist- Bankura under Bankura -I ,II and Borjora Block Surface Water Based Piped Water Supply Scheme (BRGF Phase-I) under BMD, PHED
Providing, installation of Pumping machineries with other electro mechanical accessories at OHR site Chigani piped water supply scheme for Restoration of flood affected T.W No I and alied works of Onda and Indus Block PWSS under BRGF(Phase I),BMD
Operation and Guarding of Pumping Machinery for augmentation of Surface Water Based Piped Water Supply Scheme for Arsenic Affected areas of Zone-II (Uttar Kalsur) W/S Scheme Block- Deganga under EMSD-I, P.H.E. Dte. Dist. North 24 Pgs. SM/ 15822
Construction of Switch Room Cum Chlorine Room, Approach Road, Boundary Wall, M.S. Ornamental Gate, Road Restoration works etc. for the work of 2nd Augmentation of pipe Water Supply Scheme within Tufanganj Municipality, District-Cooch Behar, WB
Installation of submersible pump to providing piped water supply for drinking water at Sukhakuti primary school AND ICDS
Installation of Piped Water Supply System at P/Dangapara AWC under Jharaltagram - I GP under 15th FC Fund
Providing piped water supply to public institutions at Sansad III Sittong II GP under 15th FC 23-24
PROVIDING PIPED WATER SUPPLY TO PUBLIC INSTITUTION (PICHALDAHA D.N PRIMARY) UNDER 15TH FC,22-23, ACTIVITY CODE-66421492
Install of Solar Submersible Pump with over head Tank at Begampur SSK_Providing piped water supply to public institutions
Providing piped water supply by installation of Sub-mersible pump at Benuchak Shib Mandir ICDS center at Benuchak.
Installation of Piped Water Supply System at Saradamaye SSK School under Jharaltagram - I GP under 15th FC Fund
PROVIDING PIPED WATER SUPPLY TO PUBLIC INSTITUTION (KOTRA JOYCHANDIPARA PRIMARY) UNDER 15TH FC,22-23, ACTIVITY CODE-66421394
Providing piped water supply to public institutions at Sansad IV Sittong II GP Under 15th FC 23-24
Operation and Maintenance of drinking/piped water supply system Mark-II Tubewell, Water ATM and Sajaldhara Id 109467889
Installation of submersible pump to providing piped water supply for drinking water at Tetikhola primary school AND ICDS
Providing piped water supply to public institutions at Sansad V Sittong II GP Under 15th FC 23-24
SOLAR WATER SUPPLY SCHEME AT AIBHEEL TG GAJALDOBA LINE SANSAD NO VII UNDER MATIALI BATABARI I GRAM PANCHAYET WITHIN MATIALI PANCHAYET SAMITY UNDER 15th FC (FINANCIAL YEAR 2024-25) ACTIVITY CODE- 97729280
SOLAR WATER SUPPLY SCHEME AT DANGI TG MURTI LINE LINE SANSAD NO X UNDER MATIALI BATABARI I GRAM PANCHAYET WITHIN MATIALI PANCHAYET SAMITY UNDER 15th FC (FINANCIAL YEAR 2024-25) ACTIVITY CODE- 97728980
Providing Water Supply scheme for high altitude 11 nos BOPs Manaybhanjang, Lameydhura, Meghma, Tumbling Fatak, Garibas, Batasey, Kalpokhari, Sandakhphu, Thakum, Molley, and Phalut at Bn Hq Geyzing Sikkim under Jorebuinglow Sukhia Block, Darjeeling.
AUGMENTATION of JANGIPARA ZONE-II Piped Water Supply Scheme
AUGMENTATION of SRIPATIPUR ZONE I Piped Water Supply Scheme
AUGMENTATION of BARAKAMALPUR ZONE III Piped Water Supply Scheme