Loading…
Loading…
672 results • Best match
Supply Installation, Testing and Commissioning of 2x1500 KVA 415V Silent DG Set at 129 MLD WTP, CDA Sector-13, Cuttack
Construction of WTP and laying of RWRM and CWRM with ancillary works for Sorada NAC under AMRUT 2.0 (SWAP-III)
Operation and Maintenance of STP 100 KLD and WTP 20 Cubic Metre/Hour at Jilling Langalota mines of Barbil Region
Laying of pipe line from WTP Modipada to Samleswari Temple for Development of Samleswari Project under P.H. Section, Modipada, Sambalpur
Procurement and installation of 2 Nos 100 HP VT pump sets with VFD panel at Intake Well Koelnagar WTP Rourkela
Laying of 350mm dia-400 mtr raising main from 18 MLD WTP to Old Truck Parking, Rourkela under AMRUT 2.0
Supply, Installation, Testing and Commissioning of 3.3KV 6 pole 250 KW HT Motor at 6MGD Pump House, WTP Palasuni, BBSR
RPWS to village Budhapanka and its adjoining villages from Jhadiamba WTP under Banarpal Block in Angul District. (including OM 5Years)
Custom Bid for Services - Monitoring and Maintenance of WTP-4, 5 & 6 of Caster-4, SMS-II Similar Category Operation And Maintenance Of Water Supply Systems Operation and Maintenance of Effluent/Sewage Treatment Plant Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
REPAIR AND MAINTENANCE OF BR ITEMS AND OTHER MISC MAINTENANCE WORK IN CGAE AREA PERIODICAL SERVICES AND ALLIED WORKS IN CGAE AREA AND REPAIR AND MAINTENANCE OF INTERNAL ELECTRIFICATION COOLING APPLIANCES AND RO PLANT OTM ICG AREA AT BHUBANESWAR
Construction of WTP and allied works related to augmentation of water supply to Digapahandi NAC Including 5 years Construction of WTP and allied works related to augmentation of water supply to Digapahandi NAC including 5 years Operation and Maintena
Installation of Gas Chlorination system for 4 MLD WTP at Gunupur under Annual Action Plan for the year of 2025-26
Laying of 300mm DI pipe line, construction of valve chamber in connection for Rajgangpur WTP to sump-I under Rajgangpur block
Annual maintenance contract for day to day mechanical work(as when required) at intake well and WTP of IWSS,Lingaraj Area
Supply, Installation, commission, Testing of new V.T. Pump motor and its accessories at Raw Water Pump no.-4, at WTP Mundali
Design Drawing Construction testing and commissioning of 10Lakh liter capacity GSR inside WTP at Khariar NAC Under State Plan 2020 21
Providing and Fixing of Bulk Flow Meter at WTP, Old Pump House, Betaguda OGR, BPL Colony OGR etc. of Paralakhemundi Town
Custom Bid for Services - Outsourcing of Electrical Maintenance activities at WTP-1, 2, 3 & MSRS, SMS-II(E) Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Laying of dedicated rising main from WTP to Jayanagar MBR and other ancillary work at Jeypore Municipality
Annual maintenance contract of day to day mechanical works (as and when required) at intake well and WTP of IWSS, Lingaraj Area
Improvement of Water supply to Khandapada NAC (Improvement of raw water sources, Clear water pumping main from WTP to Zonal GSR/ESR)
Improvement of Water supply to Ranapur NAC (Raw water pumping main and Clear water pumping main from WTP to Zonal GSR/ESR)
Operation and maintenance of Head Works, 8 MLD WTP, Raw water and Clear water rising main for water supply to Pattamundai Municipality.
Replacement of filter media on the filtration bed including maintenance of existing clarifier for one year at new WTP of Basundhara Area.
PLTC of 600mm dia DI S/S (K-9) pipe in RWRM from proposed intake well on river Sankha to existing WTP at Beldihi for WS to Kalunga IE Rourkela (Approx 2000m) N PLTC of 450mm dia in CWRM from WTP at Beldihi to Kalunga of approx 3100 m length
Construction of Intake Well, Pump House, Foot Bridge, Laying of DI Raw Water Rising Main, 2.5 MLD WTP, CWR Pump House, DG Set, etc.,
Supply and Installation of Bulk Flow Meter Device at Intake Well, Old ESR, OGR, New WTP, and different production wells at Kashinagar Town
Repair, Maintenance, and Fabrication of Pump Motor Base Plate and Alignment of Pump Motor with Repaired/Modified Base Plate WTP at Basundhara Area
Construction of Permanent Intake structures with external electrification for 32 MLD WTP at Jeypore Municipality. Under State Plan for the year 2020-21.
Supply, Installation, testing and commissioning of Clear water Pump motor and 100HP VFD for 9.5MLD and 7MLD WTP, Mundamal, Vyasanagar Municipality, Jajpur Road
Rearrangement of Safety Protection with Miscellaneous Job Of 3.3 KV Kilburn Make DOL Starter Panel For PH-1,WTP Of IWSS Lingaraj Area
Construction, Testing and commissioning of the 1.00 ML Capacity RCC UGR at 9 MLD WTP Belgadia Under WATCO Division Baripada in Mayurbhanj district
Construction of RCC Intake Well, Pump House, 36 MLD WTP, Boundary Wall, Approach Road and Laying of Raw Water Rising Main
Improvement of Water supply to Khandapada NAC (Improvement of raw water sources, Clear water pumping main from WTP to Zonal GSR/ESR)-(Balance Portion)
Installation of bulk flow meter and control valve zones under 12.00 MLD WTP at Ranibagicha in connection with 24x7 water supply to Sundargarh Town
Construction of 1 50 ML Capacity CWR at 15 00 MLD WTP of Bargarh Municipality under State Plan BASUDHA for the year 2023 24
Transportation, welding, laying, aligning and jointing of 8 inch (200mm) dia M.S pipe line from Deulbera pit top to WTP of IWSS, Lingaraj Area
Procurement of supplying, Installation, Testing and Commissioning of Renewable Energy with Solar Panel along with all ancillaries etc at WTP site K Bandopala Bhawanipatna
Installation of bulk flow meter and control valve zones under 12.5 MLD WTP at Ranibandh in connection with 24x7 water supply to Rajgangpur Town
Construction of ESR at WTP site Subarnapur in connection with the work Augmentation of water supply system along with ancillary works for Subarnapur town.
Annual Operation and Maintenance of 7 MLD WTP Excluding Fuel, Energy charges, Chemical and Major spare parts at Mundamal of Vyasanagar Municipality, Jajpur Road
Supply, fitting and fixing of Servo Control Constant Voltage Transformer at Salia Dam WTP Pump house for water supply to Balugaon and Banapur NAC
Construction of WTP with other allied structures in connection with the work Augmentation of water supply system along with ancillary works for Subarnapur town.
Annual Operation and Maintenance of 129 MLD WTP at Sector-12, CDA and Intake Well, Chahata, Cuttack under WATCO Division, Cuttack (For Two Years)
Construction of Intake well WTP and laying of Raw water rising main in connection with the work Augmentation of water supply to Tusura Town.
Annual Operation and Maintenance of 129 MLD WTP at Sector-12, CDA and Intake Well, Chahata Cuttack, under WATCO Division, Cuttack (For Two Years)
Strengthing of Raw water chennel and Rapid mixture unit of 6MGD WTP by polymer plaster and epoxy bonding agent Sunabeda
Operation and maintenance of Head works, 8 MLD WTP, Raw water and Clear water rising main for water supply to Pattamundai Municipality for Six Months.
Supply and installation of pump sets along with other ancillary work at WTP near Pradhanpat and Patrapali Model Degree College and Sartala under Deogarh Municipality
Supply, Installation, Testing and Commissioning of Pump sets including Electrical and Piping Arrangements for New Pump House at (18 plus MLD), WTP at Panposh Rourkela