Loading…
Loading…
12,044 results • Best match
RENOVATION AND CONSTRUCTION OF PRECAST SLAB AND PATHWAY SURROUNDING FILTER HOUSE AND ADJOINING SLUDGE CARRYING DRAIN WITH ALLIED WORKS UNDER WTP-1, GRWW.
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF FRONT TRACTION WHEEL WITH ALLIED COMPONENTS FOR BRIDGE STRUCTURE OF CLARIFLOCCULATOR NO-4 UNDER WTP-I, GRWW.
SUPPLY, DELIVERY, INSTALLATION AND FITTING FIXING OF TRIPLEX CHAIN SPROCKET ARRANGEMENT AND OTHER ALLIED ACCESSORIES FOR CLARIFLOCCULATOR NO-3 UNDER WTP-I, GRWW.
REPAIRING AND REPLACEMENT OF DAMAGED CHLORINE BOOSTER LINE, CHLORINE DOSING LINE WITH RELATED VALVES AND ACCESSORIES AND ALLIED WORKS UNDER WTP-I, GRWW.
REPAIRING, SERVICING, OVERHAULING, TESTING AND COMMISSIONING OF AIR COMPRESSOR NO-2 AT BACK WASH PUMP ROOM WITH ALLIED WORKS UNDER WTP-I, GRWW
REPAIRING, SERVICING AND OVERHAULING OF BACK WASH MOTOR NO - 3 AT BACK WASH PUMP ROOM WITH OTHER ALLIED ACCESSORIES UNDER WTP-I, GRWW.
RENOVATION WITH REPLACEMENT OF DAMAGED SPARE PARTS, TESTING AND COMMISSIONING OF RECIPROCATING AIR COMPRESSOR NO. 3 WITH ALLIED WORKS AT WTP-III, GRWW.
RENOVATION OF LT PANEL FOR SLUDGE PUMP MOTOR NO 1,3 AND 4 WITH ALLIED ACCESORIES AT SLUDGE PUMP HOUSE UNDER WTP-1, GRWW.
RE-ARRANGING AND SETTING THE ARRANGEMENT FOR ISOLATION THE INLET OPENING OF FILTER BED NO - 4 WITH ALLIED WORKS UNDER WTP-1, GRWW.
INSTALLATION, FITTING, FIXING AND COMMISSIONING OF BACK TRACTION WHEEL WITH ALLIED COMPONENTS FOR BRIDGE STRUCTURE OF CLARIFLOCCULATOR NO-4 UNDER WTP-I, GRWW.
RENOVATION OF LT PANEL FOR SLUDGE PUMP MOTOR NO 2 AND 5 WITH ALLIED ACCESORIES AT SLUDGE PUMP HOUSE UNDER WTP-1, GRWW.
REPAIRING, SERVICING AND OVERHAULING OF BACK WASH MOTOR NO - 1 AT BACK WASH PUMP ROOM WITH OTHER ALLIED ACCESSORIES UNDER WTP-I, GRWW.
IMPROVEMENT OF PNEUMATIC ARRANGEMENT FOR OUTLET VALVE AND DRAINAGE VALVE AGAINST FILTER BED NO-7 WITH OTHER ALLIED WORKS AT WTP-II,GRWW.
REPAIRING AND REPLACEMENT OF DIFFERENT SPARE PARTS OF SLUDGE PUMP NO-01 AT SLUDGE PUMP HOUSE WITH ALLIED WORKS UNDER WTP-II,GRWW.
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF FRONT TRACTION WHEEL WITH ALLIED COMPONENTS FOR BRIDGE STRUCTURE OF CLARIFLOCCULATOR NO-3 UNDER WTP-I, GRWW.
MODIFICATION AND REPLACEMENT OF DIFFERENT SPARE PARTS OF SLUDGE PUMP NO-4 AT SLUDGE PUMP HOUSE WITH ANCILLARY WORKS AT WTP-II , GRWW.
IMPROVEMENT OF DESLUDGING SYSTEM OF CLARIFLOCCULATOR NO-3 WITH OTHER ALLIED WORKS AT WTP-II. GRWW.
RENOVATION AND REPLENISHMENT OF FILTER BED SYSTEM OF FILTER NO-5 OF WTP-II,UNDER GRWW.
MODIFICATION OF PNEUMATIC SYSTEM FOR FILTER BED NO-01 WITH ALLIED WORKS AT WTP-II,GRWW
Renovation of L.T. electrical installation work surrounding the chemical house building at Jorabagan WTP cum BPS.
Facility Management Service- Manpower based (Version 2) - Residential, Industrial; Housekeeping, Horticulture, Grass Cutting, Maintenance of Water Treatment Plant and Pest Control; Skilled, Maintenance of Water Treatment Plant and Pest Control; ... of Water Treatment Plant and ...
Servicing ,testing and commissioning of 33KV HT VCB panel with cable end termination , dehydration and top up of the transformers oil including replacement of gaskets.....with allied work at Madhyamgram 140 MLD WTP under Madhyamgram Municipal Area.
Thorough overhauling and servicing of 1 no. 7.5 ton EOT crane, 450 mm dia valves, supply, delivery and laying of Al. conductor cable and allied works at Clear Water Booster Pumping Station under 48 MLD WTP, Bally.
SUPPLY, DELIVERY AND FITTING-FIXING OF NEW BOCKETS AND AIR PIPE LINES IN PNEUMATIC CYLINDERS FOR 3 NOS FILTER BEDS UNDER WTP-I OF GRWW.
Restoration of two toilets at Jorabagan WTP cum BPS.
Construction of Stair case
Operation and Maintenance of Arsenic cum Iron Removal Plant of Gobordanga Model including Compressor Room for Ramnachandpur ZoneII
Operation and Maintenance for Iron Removal Plant of Ghoramara PWSS Under Murshidabad Division P.H.E. Dte.for 12(Twelve) Months.
Speciation Based Optimization of hydraulic and process parameters of arsenic and iron removal plant to improve treatment efficiency.
Augmentation of Brohmottar Manikchak Piped water supply scheme to accommodate construction of OHR,Arsenic cum Iron Removal Plant
Operation and Maintenance of Arsenic cum Iron Removal Plant of Gobordanga Model including Compressor Room for Bansgara ZoneII
Construction of Water Treatment Plant (WTP) near HO Meherul Sardar at Fatullapur Paschimpara Sansad-IV Bajitpur GP Under Baduria Block Fund 15TH FC TIED FY 2024 25 Activity Code 97161799
ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Potable Water Purification System Reverse Osmosis Or UV Based; As per ATC; PACKAGE-3 : Water purifier and conditioning system maintenance involving basic servici.., ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) - Drinking Water Cooler; As per ATC; PACKAGE-1 : Water purifier and conditioning system maintenance involving basic servicing
Supply, delivery ,installation and commissioning of 2 Nos Submersible sludge pump (Q.790 Cum/hr., H.15M) , 350 mm NRV and Gate valve including delivery piping all complete with allied work of WWRS....at..WTP under Madhyamgram Municipality.
water supply
RENOVATION WITH REPLACEMENT OF WORN OUT SPARE PARTS, TESTING AND COMMISSIONING OF CHLORINATION SYSTEM FOR CHLORINATOR (20KG/HR.) NO. 2 AT WTP-III, GRWW.
REGRADATION, RENOVATION AND SURFACE TREATMENT WITH CHEMICAL COATING OF COAGULANT DOSING TANK NO-B- 1AND 2 WITH OTHER ALLIED WORKS AT WTP-IV, GRWW
RENOVATION WITH REPLACEMENT OF WORN OUT SPARE PARTS OF PNEUMATIC SYSTEM OF TUBE SETTLER NO. 8 WITH OTHER ALLIED WORKS AT WTP-III, GRWW.
RENOVATION WITH REPLACEMENT OF WORN OUT SPARE PARTS, TESTING AND COMMISSIONING OF CHLORINATION SYSTEM FOR CHLORINATOR (20KG/HR.) NO. 3 AT WTP-III, GRWW.
DISMANTLING, REPAIRING AND FITTING FIXING OF STRUCTURAL LOCK GATE INCLUDING DRAW SHUTTER ASSEMBLY WITH ALLIED WORKS FOR CLARIFLOCCULATOR NO-2 AT WTP-1,GRWW.
RENOVATION WITH REPLACEMENT OF WORN OUT SPARE PARTS, TESTING AND COMMISSIONING OF CHLORINATION SYSTEM FOR CHLORINATOR (20KG/HR.) NO. 4 AT WTP-III, GRWW.
RENOVATION WITH REPLACEMENT OF WORN OUT SPARE PARTS, TESTING AND COMMISSIONING OF CHLORINATION SYSTEM FOR CHLORINATOR (20KG/HR.) NO. 1 AT WTP-III, GRWW.
MS JACKETTING OF DAMAGED PART 1500MM DIA AND 1050MM DIA CC GRID ADJACENT TO CHEMICAL HOUSE OF WTP-II OF GARDEN REACH WATER WORKS.
REPAIRING AND ROOF TREATMENT OF LABORATORY ROOM AND INTERMEDIATE PASSAGE BETWEEN CHEMICAL HOUSE AND FILTER HOUSE WITH OTHER ALLIED WORKS AT WTP-I, GRWW.
REPAIRING OF 750MM DIA SLUDGE CARRYING PIPE LINE NEARER TO AKBAR FURNITURE AND BIJOY SALOON ON PAHARPUR SANTOSHPUR LINK ROAD UNDER WTP-I, GRWW.
RENOVATION OF SIDE WALL AND ADJOINING RAILING WITH ALLIED WORKS AT INCOMING RAW WATER CHANNEL NEARER TO CHEMICAL DOSING ZONE UNDER WTP-I, GRWW.
PROVIDING CONCERTINA BARBED WIRE FENCING ALONGWITH NECESSARY Y-SHAPE ANGLES IN PLACE OF DAMAGED ONE ALONG EASTERN PERIPHERAL BOUNDARY WALL OF WTP-III, GRWW.
REPAIRING OF 750MM DIA SLUDGE CARRYING PIPE LINE NEARER TO NASHIMA STEEL AND TAJ TELECOM ON PAHARPUR SANTOSHPUR LINK ROAD UNDER WTP-I, GRWW.
REPAIRING,REPLACEMENT AND PAINTING OF DAMAGED BRIDGE COMPONENTS AT ABOVE WATER LEVEL FOR CLARIFLOCCULATOR NO-3 WITH OTHER ALLIED WORKS AT WTP-II,GRWW.
REPAIRING OF 750MM DIA SLUDGE CARRYING PIPE LINE NEARER TO DIPAK MARBEL AND MOSTAFA FURNITURE ON PAHARPUR SANTOSHPUR LINK ROAD UNDER WTP-I, GRWW.