Annual maintenance of water cooler cum reverse osmosis water purifier unit including spare parts located at different location of Bhabani Bhaban Main Building of WBPD Alipore Kolkata 27_ One Year
Precommissioning and trail run activities work for construction of Joist structure with MS Pipe over the bank of damadar canal for laying of RWRM ,Jack pushing ,GAP closing of RWRM road restoration thrust block arrangement
Annual operation and maintenance of different dia MS/DI Rising main and distribution system pipe line from Intake site to Panagarh Industrial Park H/W site under Surface based PWSS for Panagarh Industrial Park under DWSD,PHE Dte (1 yr)
Operation and guarding of pumping machinery in the District of South 24pgs
STRENGTHENING OF PERFORATED PART OF SURFACE BODY OF MS 1500 MM DIA CC GRID OPPOSITE TO VEELINE MEDIA WITH ALLIED WORKS AT TARATALA ROAD UNDER GRWW DISTRIBUTION NETWORK
Dismantling and reconstruction of RCC surface drain along panagarh industrial park main entrance road and allied works in distribtuion network system under surface based PWSS for Panagarh Industrial Park
Design, Development and upgradation of existing water supply system along with other civil works With One Year O and M for Panagarg Zone I for 5.32 MGD Capacity Panagarh Industrial Park Water Supply Scheme under DWSD, P.H.E. Dte
RE-WINDING WITH MECHANICAL REPAIRING OF 90KW/120HP, 550V, 2900RPM. 100M, HEAD, 5-STAGE PULLEN MAKE SUBMERSIBLE PUMP WITH MOTOR SET INSTALLED AT BEGUNIA PROJECT UNDER CV AREA-XII.
MANUALLY LIFTING AND LOWERING OF 90HP/550VOLT/550GPM 4STAGE, 100MTRS. HEAD SUBMERSIBLE PUMP WITH MOTOR SET AT BEGUNIA COLLIERY(5NO. PIT) FOR RAW WATER SUPPLY TO BCCL RIVER SIDE COLONY AT BEGUNIA COLLIERY.
Balance portion for construction of 50 mtr clear span MS structural bridge for crossing of Panagarh branch canal
Designing, Surveying,Construction of Boundary Wall, guardroom, Chlorine Room including mono rail arrangement etc. Works such as access roads and pathways
Daytoday working cleaning of toilet floor doors windows, kitchen, appliances etc including cleaning routine maintenance of kitchen appliances including deployment of caretaker, cook and service man for inspection bungalow etc. under NAD I PHE Dte
Crossing of 500 mm dia pipe line by mordern trechless technology throguh jack pushng method at Sonai underbypass along the (Zone-II)
LIFTING AND LOWERING OF SUBMERSIBLE PUMP WITH PIPE AT 5 NO. PIT AT BEGUNIA COLLIERY.
Annual Operation and Maintenance of Arsenic cum Iron Removal Plant for Nabla Capacity 30 m3 Hr Gravity Type Beharia Capacity 119 m3 Hr Gravity Type and Nirsinghapur Capacity 216 m3 Pressure Type WS Scheme under NAD I PHE Dte
Operation and Maintenance of distribution system and rising main pipe line CI / DI / UPVC/HDPEand Operation and Maintenance of Arsenic cum Iron Removal Plant of Gobordanga Model AIRP Capacity-23.94 cub.m/Hr and allied works of Bansgara Zone-I
Operation and Maintenance for Arsenic cum Iron Removal Plant of Kakramari PWSS( Capacity 120 m3/hr), Ramakantapur PWSS( Capacity 55 m3/hr), Harua PWSS( Capacity 72 M3/hr) PWSS , Ahiron ( Capacity 72 M3/hr) PWSS Under Murshidabad Division P.H.E.
Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 174 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Baruipara to accommodate FHTC within Karimpur-I block under Tehatta Sub-division under Nadia Division, P.H.E. Dte.
Operation and Maintenance of distribution system and rising main pipe line CI / DI / UPVC/HDPE and Operation and Maintenance of Arsenic cum Iron Removal Plant of Gobordanga Model AIRP Capacity-21.88 cub.m/Hr and allied works of Hazi Mohammadpu
Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of capacity 65 m3/hr at Subarnabihar Zone-II Water Supply Scheme including 3 Months Trial Run 3 Years O and M within Krishnanagar-I Block under Nadia Division, P.H.E. Dte
Construction of Arsenic-cum-Iron Removal Plant (AIRP) of 47.81 cum/Hour capacity at existing headwork site for Augmentation of Ground Based Water Supply Scheme at Andharkota to accommodate FHTC under Tehatta Sub-Divn under Nadia Divn, PHE Dte.
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-XII and Arsenic Iron Removal Plant at Uttar Chandipur (Zone-II) Piped Water Supply Scheme in the district of Malda
Construction of Arsenic-Cum-Iron Removal Plant (AIRP)of 93.44 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Karimpur Jalangi Zone-IV to accommodate FHTC within Karimpur-I block underTehatta Sub-division under Nadia Div
Operation and Maintenance of distribution system and rising main pipe line CI / DI / UPVC/HDPE and Operation and Maintenance of Arsenic cum Iron Removal Plant of Gobordanga Model AIRP Capacity-11.00 cub.m/Hr and allied works of Diar shyampu
Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 120 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Palshipara to accommodate FHTC within Tehatta-II block nder Tehatta Sub-division under Nadia Division, P.H.E. Dte.
Operation and Maintenance of distribution system and rising main pipe line CI / DI / UPVC/HDPE and Operation and Maintenance of Arsenic cum Iron Removal Plant of Gobordanga Model AIRP Capacity-11.00 cub.m/Hr and allied works of Diar shyampu
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I and Arsenic Iron Removal Plant at Sukurullapur Piped Water Supply Scheme in the district of Malda Under Malda Mech
Supplying Fabrication Erection on suitable RCC foundation and Commissioning with 3 months Trial Run of pressure type Iron Removal Plant with Blower cum Compressor Room of internal size 3600 mm 3000 mm with Platform of size 9000 mm 4500
Annual Operation and Maintenance of Arsenic cum Iron Removal Plant, IEP and Day to day Operation, Maintenance and Emergent repair at Talimnagar distribution Zone in Manikchak Block under Malda Arsenic Area W/S Division, PHE Dte. for One Year
Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 125 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Badkulla-I to accommodate FHTC within Hanskhali block under Ranaghat Sub-division under Nadia Division, P.H.E. Dt
Annual Operation Maintenance of Arsenic cum Iron Removal Plant of LAXMIGHAT Water Supply Scheme under Malda Malda Arsenic Area W/S Division, PHE Dte. Malda. In the District of Malda. (Period from 01/01/2021 to 31/12/2021).
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I and Arsenic Iron Removal Plant at Jotparan Piped Water Supply Scheme in the district of Malda Under Malda Mechanic
Supplying Fabrication Erection on suitable RCC foundation and Commissioning with 3 months Trial Run of pressure type Iron Removal Plant with Blower cum Compressor Room of internal size3600 mM 3000 Mm with Platform of size 9000 mm 4500 mm
Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 26.25 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Karimpur Jalangi Zone-IX B to accommodate FHTC under Tehatta Sub-division under Nadia Division, P.H.E. Dte.
Construction of Arsenic-cum-Iron Removal Plant (AIRP) of 56.13 cum/Hour capacity at proposed headwork site for Augmentation of Ground Based Water Supply Scheme at Andharkota to accommodate FHTC under Tehatta Sub-Divn under Nadia Divn, PHE Dte.
Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 135 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Tehatta to accommodate FHTC within Tehatta-I block under Tehatta Sub-division under Nadia Division, P.H.E. Dte.
Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 30 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Karimpur Jalangi Zone-X B to accommodate FHTC under Tehatta Sub-division under Nadia Division, P.H.E. Dte.
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I and Arsenic Iron Removal Plant at Bakhrabad Piped Water Supply Scheme in the district of Malda Under Malda Mechani
Annual Operation Maintenance of Arsenic cum Iron Removal Plant for Beharia (Capacity-119m3/Hr., Combined ) Saguna (Capacity-78 m3/Hr., Gravity Type ) W/S Scheme under Nadia Arsenic Division - I P.H.E. Dte. for a period of 1(One) Year.
Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 206 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Karimpur to accommodate FHTC within Karimpur-I block under Tehatta Sub-division under Nadia Division, P.H.E. Dte.
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-I and Arsenic Iron Removal Plant at Kadamtala Piped Water Supply Scheme in the district of Malda Under MLMD PHED
Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 57 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Anandapur to accommodate FHTC within Karimpur-I block under Tehatta Sub-division under Nadia Division, P.H.E. Dte.
Supply,delivery, installation and trial operation of Electro-Mechanical components and allied works at Ground Water Based Tubewell No-XIII and Arsenic Iron Removal Plant at Uttar Chandipur (Zone-III) Piped Water Supply Scheme in the district of Malda
Operation Maintenance of Arsenic cum Iron Removal Plant at Santoshpur Zone-I (92.00 cum/hr) Santoshpur Zone-II (82.00 cum/hr) OHR site at Bongaon Block under North 24 Pgs. Water Supply Division-I, PHE Dte. for 365 days.
Annual Operation Maintenance of Mechanical unit of Arsenic cum Iron Removal plant for Digri (capacity-75 M3/hr) piped water supply Scheme under Nadia Arsenic Civil Division-II, PHE Dte.Period of work 01/07/2024 to 30/06/2025
Annual Operation Maintenance of Arsenic cum Iron Removal Plant for Muragachha ZoneI Capacity-65 m3 Hr.Pressure Type Muragachha Zone-II Capacity-75m3 hr. Pressure Type WS Scheme under NAD I PHED Period 01/03/2026 to 28/02/2027
Annual Operation Maintenance of Arsenic cum Iron Removal Plant for Bhayna Zone-I Capacity-125 m3HrPressure Type Betna Capacity-50m3 hr Pressure Type WS Scheme under Nadia Arsenic Division I P.H.E.Dte. Period 01/03/2026 to 28/02/27
Annual Operation Maintenance of Arsenic cum Iron Removal Plant for Dubli Zone-I Capacity-105 m3/Hr Pressure Type Dubli Zone-II Capacity 73m3 hr. Pressure Type WS Scheme under Nadia Arsenic Division - I PHED Period 01 (One) year
Annual Operation Maintenance of Arsenic cum Iron Removal Plant for Itaberia Capacity 60 m3 Hr Gravity Type Jaypur Capacity 86m3 hr Gravity Type WS Scheme under Nadia Arsenic Division I PHED Period 01/03/2026 to 28/02/2027
Annual Operation and Maintenance of Arsenic cum Iron Removal Plant and Day to day Operation, Maintenance and Emergent repair at Mahabbatpur Water Supply Scheme in Manikchak Block under Malda Arsenic Area W/S Division, PHE Dte. (For One year)