Loading…
Loading…
2,578 results • Best match
Repair renovation and painting both inside and outside and also roof treatment work of entire Garages infront of Bhabani Bhawan main building Alipore Kolkata 700027 during 2023 2024
RENOVATION WITH WALL PUTTY,PAINTING, TOTAL VITRIFIED TILE,ALUMINIUM WINDOW, S.S.NET AND ROOF TREATMENT IN THE MATANGINI BHAWAN WITH G.B.ROOM,GUEST ROOM AND DINING HALL, UNIVERSITY OF KALAYNI.
All as per BOQ
As per Tender document
Waterproofing, Roof Shed and other allied works at Darjeeling CCC under Darjeeling Division, WBSEDCL
Painting of Superintendent Bungalow (Due to change of occupation) and roof treatment at Burdwan Central Correctional Home premises under Burdwan East Sub Division, P.W.D during the year 2024-2025.
Chittaranjan Seva Sadan College of Obs., Gynae. and Child Health Kolkata --- Thorough Roof treatment works of the Goenka Block of CSS COGCH, during the year 2024-25. (Civil work).
Renovation work at LIG 2 BG Lane Howrah for repairing of roof treatment with APP on flat roof of block A B C D E and F _6 Blocks
Up gradation of Guest Waiting Room , Secretary , Additional Deputy Secretary , CAs room , Corridor including Roof Treatment of the Wing of MZP Building. (XVFC-Untied 2023-24 Suppl.)(Code-107061905)
Roof treatment, repairing and painting of pump house, Chlorine room, CWR, SEDCEL room and construction of plinth protection and drain with other allied works under BARJORA Water Supply Scheme
Roof treatment by APP membrane of Old Court Building at Ld. District Judge Court in the district of Purba Bardhaman under Burdwan Division, P.W.D. during the year 2021-2022.
Urgent Repair and Renovation of WBSEDCL Meter Room, Panel Room, Gear Room Inside including Roof Treatment within the compound of Ranaghat Sub-Divisional Hospital in the District of Nadia
Const of Roof Treatment of 246 No ICDS Center within Gorarash Kulingram Gram Panchayat under Basirhat II Block under Amader Para Amader Samadhan Fund PS No 114 Priority 9
Repairing roof treatment, Lift shed, setting up to DO partition and ancillary works at Dr. J.R.Dhar Sub-Divisional Hospital under Bongaon Sub-Division PWD during the year 2023-2024.
Repair and renovation of toilets corridors and roof treatment at block A old building in the compound of Hiralal Mazumder Memorial College for Women during the year 2020 2021
Renovation of front verandah, plinth protection, drain, roof treatment, outside painting and electrical work of Dog Kennel at Barrackpore Police Commissionerate under Dy. Commissioner of Police, Barrackpore Police Commissionerate.
Repair and Rehabilitation including Painting for Inside as well as Outside portion and Antitermite Treatment Roof Treatment at Bangladesh Library and Information Centre at 3 Suharawardi Avenue Kolkata-700017
Taking out of old damaged screed concrete, levelling, roof treatment and other allied works at roof of quarter no. -W/160 and W/161 (1st floor roof) in NBU
REPAIR / MAINTENANCE OF SEWAGE LINE, AREA DRAIN, ROOF TREATMENT, WATER STORAGE TANKS AND BR SERVICES TO BLDG NO. P-128 (JAMUNA) AT BM CAMP UNDER GE (I) (CGP) KOLKATA
Roof Treatment with allied civil works on the roof of Green Qtr. buildings (1st floor level) within the compound of Medical College and Hospital during the year 2025-26.
Maintenance and repair of Boundary wall, Main Drain along with roof treatment work of Division Bill Section at Sekhpura Irrigation campus in Block Midnapore Sadar, P.S.Kotowali, Dist Paschim Medinipur
Outside and inside fully renovation including painting, repairing, roof treatment and outside drain cover casting, and miscellaneous S and P work of U.G. Hostel at V.L. College Campus. C.U.
Roof treatment with APP membrane over the roof of Munsiff Building along with other allied works within the premises of the Alipore Judges Court Compound under Alipore Division PWD
Roof Treatment and Repairing and Renovation work at 2nd floor of old existing college building at Birla Institute of technology Kolkata under Kolkata North Division PWD during 23 24
Emergent thorough Roof Treatment work at Roof of South-West wing, South Ball Room, North Portico of Raj Bhavan Main Building under SGE, W.B during the year 2024-2025
Roof treatment of Rajnagar Health Centre SSK No 18 within Ghoraarsh Kulingram GP under Basirhat -II Dev Block Under Amder Para Amader Samadhan Fund. PS No 104 Priority 1
Repair and Renovation of the District Registrars office Building at Collectorate Compound internal 2nd floor roof treatment and tank platform, External wall at Balurghat during 2023-24. (3rd Call)
Renovation with Wall Putty, Painting, Vitrified Tile in Common space, Aluminium Window, S.S net and Roof Treatment in the Banyan South Hall and Common Dining Hall under Kalyani University.
Emergent Roof Treatment works at main existing old building in Acharya Girish Chandra Bose College, 35, Rajkumar Chakraborty Sarani Scott Lane, Kolkata 700009 during the year of 2022 23.
Roof treatment of Existing Potato Cold Storage (Unit-1, and 2, 5600 M.T. Capacity Each) of Adina Samabay Himghar Ltd. P.O. - Adina Station, Dist. - Malda, PIN - 732128 (West Bengal)
Essential Roof Treatment works at both side stair case portion on 5th Floor at Open Air Theatre UTTIRNO 1A Reformatory Street Alipore Kolkata 700027 during the year 2024 2025
Urgent roof treatment work by APP of high roof of SDO Court Building to prevent the water leakage from roof within Collectorate Compound Paschim Medinipur during the year 2025_26
ROOF TREATMENT BY APP MEMBRANE WITH REPAIRING AND PAINTING, SANITARY, PLUMBING WORK AND OTHER ANCILLARY CIVIL WORKS OF HEALTH DEPARTMENT, BROUGH-VII, AT 149 A.J.C. BOSE ROAD, KOLKATA-700014.
REPAIR TO SHUNKEN FLOOR, PLUMBING, PLASTERING, FLOORING, SANITARY FITTINGS, ROOF TREATMENT, JOINERY AND PERIODICAL SERVICES AND CERTAIN MISC REPAIRS TO OFFRS MD ACCN AT BMC UNDER GE (C) KOLKATA
Outside Repair and roof treatment, renovation of inside toilet block, kitchen, dining with allied S and P Works at different floor of Annexe Building within Circuit House, Midnapore premises.
Roof treatment with 3mm thick APP Membrane repair of false ceiling with some minor repairing works of office cum Laboratory building at FSBS Haringhata During the year 2021-22.
Roof treatment to the entire part of old Civil Court Building and ADJ 1st Track court Building at Asansol, Paschim Bardhaman during the year 2022-23. Project Id JD232402062S000.
Thorough roof treatment by APP and installation of GCI Sun shed with allied works of Gosala Complex Building at Barrackpore Lat Bagan under S.G.E.W.B. during the year 2025 - 2026
PROVISION OF EMERGENCY EXIT AND RAMP FOR SPECIAL NEEDS (CWSN) AND REPAIR REPLACEMENT OF ROOF TREATMENT AND MISC WORKS OF PM SHRI KENDRIYA VIDYALAYA KANKINARA UNDER GE (NORTH) KOLKATA
Special repair work of roof treatment of Working Womens Hostel at Haldia under Basudevpur Section under Haldia Sub-Division under Medinipur Division, Housing Directorate during the year 2026-27
Repairing and maintenance work of roof treatment and allied works of Double Lock Building under Treasury-II, Nadia at the Old Collectorrate Building, Krishnagar in the District of Nadia
Repair/renovation of C&BP Divn Pilot (inside & outside) with ancillary work and repair of floor with roof leakage & seepage control and ancillary work in the old 100 KV Generator Room at ICAR-NINFet etc as required. (SH:Point / power point wiring, S/f LED fitting wall bracket fans etc P-I)
As per Tender Documents
All as per BOQ
As per NIT
All as per BOQ
Repairing and waterproofing for a segment of roof at SDF1 building at Paridhan Garment Park
Waterproofing work at Main Municipal Building roof (partly) in Ward no. 11 under Madhyamgram Municipality.
Special repairing and renovation of both outside and inside (Gr. Floor, some parts of 1st Floor and 2nd Floor) of School Building including roof treatment at S.M.M. Home, Liluah, Howrah
Proposed additional work for structural strengthening of inside and outside of electrical room, ambulance garage, blood bank, roof treatment work, surrounding drainage system etc at Salt Lake Sub-Divisional Hospital