Loading…
Loading…
2,578 results • Best match
Roof treatment by APP membrane over security room and false ceiling of visitors room at District Magistrate Bungalow, Purba Bardhaman under Burdwan East Sub Division,P.W.D. during the year 2024-2025.
Roof treatment work by APP of backside sloped low roof of SDO office Building to prevent the water leakage from roof within Collectoreate Compound Paschim Medinipur during the year 2025-26
Emergent strengthening of slab, beam and partly roof treatment by APP with other allied works at Block Nos. 9 and 10 in KIT Scheme No. LIGH-I under Housing Sector, KMDA
IMPROVEMENT OF THE ROOF TREATMENT WORK OF THE 2-STORIED LABOUR QUARTER NO-D1/17 TO D1/24 BLOCK-D/1 TYPE NO-3 BY LAYING OF TARFELT LAYER AT IGWTP
Emergent repair work of roof treatment to stop the water leakage from different location of the Hospital Building, PWD Building, Pump House and Canteen Building of Baghajatin SGH, South 24-Pgs.
ID and BG Hospital, Beliaghata at Emergent toilet epoxy grouting work including expansion joint treatment with roof treatment work at GB Block left and right Wing during the year 25-26.
Roof treatment work of IPS Quarter with APP along with other allied works within the compound of Body Guard Line at 7 Diamond Harbour Road Kolkata during the year 2024 25
As per tender docus
All as per BOQ
All as per BOQ
A/R & M/O to residential and non-residential building at singur / paltagarh / nasibpur / balitipa / nanda / anadanagar / dearah under RHU & TC at singur during 2023-24. SH: C/o outdoor patient waiting shade i/c seating arrangement, repair to doors & ... for roof treatment work ... for roof treatment work ...
Repair and maintenance of Basketball court, roof treatment with APP along with other allied works at Sardeshwari Govt. Girls High School at Darjeeling under PWD., Darjeeling Division during the year 2021-2022.
Repair renovation both inside outside roof treatment work to Guard room Meter room including quarter _ Pump houses within the campus of GNM Training Centre at Ranchi Road in the District of Purulia
Roof treatment at entrance portico, IAS quarter roof and 2nd floor level roof (East and North) of State Govt. Circuit House, 9by1, Hunger Ford Street, Kolkata-700017 during the year 2025-26
Emergent thorough Roof treatment work at north-east wing and petty repair and paint work at north marble hall of Raj Bhavan Main Building under SGE, W.B during the year 2024-2025.
Repair along with Roof Treatment works at the inside compound of Female Ward at the inside periphery of BARDHAMAN CENTRAL CORRECTIONAL HOME, BURDWAN UNDER BURDWAN DIVISION, PWD DURING THE YEAR 2021-2022.
Roof treatment work with 3 mm thick APP of New Administrative Building BG9 storied at Collectorate compound of South 24 Parganas Alipore Kolkata 27 under Alipore Division, PWD for the year 2023_24
Repairing and renovation of both outside and inside including roof treatment of main building along with repairing of boundary wall and construction of new entrance gate etc. of Salkia Government Sponsored P.T.T.I.
Emergent repair work of Roof treatment to stop the leakage of water from different location of roof of the Administrative building at K S Roy TB Hospital during the year 2024-25 .
Emergent repair work of roof treatment to stop the leakage of water from different location of roof of the PWD building at K S Roy TB Hospital during the year 2025-26 .
Roof treatment work with PU roof coat on the roof of Linton Street Boys Hostel Northern side building erstwhile Dental College hostel building within 33 Linton Street CNMC Hostel compound Kolkata 14
Roof treatment works with Screed Concrete and P U roof coat at roof of Department of Political Science (old part), Himalayan Studies (old part), Guest House (VIP rooms portion) within NBU Campus.
Repair work of Roof Treatment to stop the leakage of water from different location of Roof of the OPD Building at Bijoygarh S.G. Hospital, South 24 Pgs. during the year 2025-26.
Tit-bid repair and maintenance of Suri Divisional store office building, surface drain, roof treatment and other allied civil works at Suri Divisional store under Suri Division in the district of Birbhum.
Replacement _Renovation work for Entally Govt Housing Estate LIG 106 Sundari Mohan Avenue Kolkata Roof Treatment for Block A_B_C_D_E _ ancillary buildings with APP membrane including removing damaged lime terracing_levelling Course _ other a
ROOF TREATMENT AT ICDS NO 19337140513241 AND SUPPLY OF ELECTRICITY OF BOOTH NO 102 WITHIN CHAITA GP UNDER BASIR II DEVELOPMENT BLOCK UNDER AMADER PARA AMADER SAMADHAN FUND PS 102 P 1
Repairing and Roof Treatment of First Floor of Krishak Sahayak Building (Sufal Bangla Hub) and Paver Block in front of Sufal Bangla Hub at Falakata Krishak Bazar under Alipurduar ZRMC (2nd Call)
Roof treatment work and construction of tin shed in stretches on Academic and administrative Buildings of West Bengal University of Animal and Fishery Sciences at Belgachia campus during the year 2022 23
Roof Treatment Work at DEIC whole Building in Hospital Campus of Deben Mahato Govt. Medical College and Hospital under Purulia Sub Division PWD of Purulia Division PWD during the year 2023-24
Kolkata Police Hospital ------ Roof treatment work by APP Membrane to stop water leakage at Main Building and Annex Building at Kolkata Police Hospital, Kolkata - 25 during the year 2023-24._Civil Work.
Upgradation , Addition and Alteration of ADM_G and ADM_Dev_ Bungalow building _outside_ including Compound development , boundary wall, security room ,roof treatment etc. at Chinsurah, in the District of Hooghly during the year 2021_22.
Renovation and Repairing works of roof treatment with APP membrane for the building roof tops of Block _A B C D E F and Section Offices at RHE_ 2_R K Ghosh Road
Repair and Renovation Work at N type quarter and corridor along with roof treatment at Deben Mahato Government Medical College and Hospital Purulia under Purulia sub-Division PWD of Purulia Division PWDte.
Internal repairing including roof treatment of existing of laboratory building, renovation of other existing structures and related maintenance work including campus development work at Bishnupur Head Work Site under Rajarhat Block etc.
Roof Treatment Work at DEIC whole Building in Hospital Campus of Deben Mahato Govt. Medical College and Hospital under Purulia Sub Division , PWD of Purulia Division PWD during the year 2023-24
Roof treatment, repairing and painting of pump house,Office cum Goadowd , AVR room, Staff room,Chlorine room and repairing and painting of Boundary wall with other allied works at Puncha CWR site
Repair and Maintenance of Drain, Plinth protection, roof treatment with APP and external wall painting to Primary Health Centre, Natungram, Shyamsunder under Raina_I Block, Purba Bardhaman.( PARAY SAMADHAN SCHEME _code _ PBD 555 ).
Replacement and Renovation work for roof treatment with APP membrane and allied work for block H I J K L N O P Q U V Z A1 at MIG Belgachia Villa
Emergent repair work of roof treatment to stop the leakage of water from different location of roof of the Gr. D quarter at Bijoyghar S .G Hospital during the year 2024-25 .
Roof treatment works of three storied ADJ quarter building at Bicharak Abason within the campus of District Judges court, Berhampore, Murshidabad under Berhampore Division No.-II, P.W.D. during the year 2025-2026.
Roof treatment, repairing and painting of Office cum Goadowd Chlorine room and repairing and painting of Boundary wall with other allied works under Puncha and adjoining Mouzas Water Supply Scheme (Zone-C)
Repairing and renovation work of roof treatment, drainage system and replacement of Damaged outlet pipes from roof to the Ground floor at Govt. ITI Pandua running under PTP under nodal ITI Hooghly.
Emergent repair work of roof treatment to stop the leakage of water from different location of roof of the Nurses Quarter building at Bijoyghar S .G Hospital during the year 2024-25 .
Roof treatment, Painting of Building and boundary Wall of Camp Office at Chemaguri point in Block and P.S-Sagar ,south 24 Parganas under Kakdwip Irrigation Division in connection with Gangasagar Mela-2023
Roof treatment with some allied works for the office of Krishnagar Highway Sub-Division No-I under Nadia Highway Division No-I in the district of Nadia during the year 2026-2027
Allied Civil Works for the roof treatment of PMCC and Canteen and Amenity Building roof and Allied Painting works of PMCC, Canteen and Amenity Building at Raninagar LPG Bottling Plant, West Bengal
Repairing and restoration work including modification of floor an roof treatment work of a single storied building for NRC of Tapsia RH under Gopiballavpur-II Block, Jhargram. RN 23002197, Project ID -HF25264
Roof treatment with APP membrane over the roof and exterior painting of Tramline Building along with other allied works within the premises of the Alipore Judges Court Compound under Alipore Division, PWD
Misc civil work for stopping seepage from roof of sub station building at BSNL telecom factory kharagpur
As per tender documents