Loading…
Loading…
216 live137 closing this weekmost from APGENCO and APCPDCL/APPCC
216 results • Latest
Procurement and commissioning of Advanced Numerical Protection Relays for Generator Protection (Micom P345), Transformer Differential Protection (Micom P633), Over current & earth fault protection (Micom P127), Distance Protection (Micom P430), Voltage/Frequency Protection (Micom P923), LBB Relay and Tripping relays with software or Equivalent & technically compatible model of any make at Nagarjuna Sagar Right Canal Power House, Vijayapuri South, Macherla (M), Palnadu (Dt)-522439, Andhra Pradesh
SUPPLY OF COMPLETE ASSEMBLY OF 200NB BRANCH HEADER VALVE REQUIRED FOR FLY ASH SYSTEM OF AHP/STG-I
DR.MVR RTPP-STAGE-II-EM&MRT-PROCUREMENT OF TRANSFORMER PROTECTION RELAYS (WINDING TEMPERATURE SCANNER)
Periodical, Preventive & break down Mechanical maintanace of complete mechanical equipments of Wagon tipplers-I,II &III, Side arm charges-I,II &III and Vibro feeders of MMSD-1/CHP/ DrMVR RTPP for the period 3 months from the date of issue of LOI
Supply of Silicagel Crystals deep blue 6-8 mm pertaining to Stages- I, IV and V
Periodical,Preventive & break down Mechanical maintenance of Gear Boxes, Pulleys,including counter weight lifting,Decksheets,C Channels, Dewatering pumps and other mechanical equipments of all Conveyors i.e. 1A,1B,2A,2B,3A,3B,UC1&RC1 and Vibro Feeders of MMSD-1/CHP/ DrMVR RTPP for the period of three months from the date of issue of LOI
Charges for Unloading of Coal from BOBR wagons at BOBR track hoppers (via 6A and 6B conveyors) and Lifting & transporting of accumulated / spilled coal along the BOBR track line at CHP/ Dr.NTTPS as and when required during the period 01-10-2026 or from the date of commencement of work to 31-03-2027
Fabrication & replacement of worn out liner and mother plates, deck/sealing sheets in various chutes & conveyors, in vibrating feeders and hoppers of Wagon Tipplers 1-4, stringers supports & fabrication, reconditioning & refixing of sump pumps as and when required during the period from 01-10-2026 or from the date of commencement of work to 31-03-2027 in M-I(Conveyors) Sub-Divn., MM (CHP)/Stage-I&II/ Dr. NTTPS
Replacement of damaged mother/liner plates in all the chutes of surge hoppers, Vibrating screens, Crushers, bypass chutes and belt feeder chutes and Carrying out various Patch welding works for all the chute leaks by welding with MS plates for all the chutes available in Maint.-I (CRUSHERS) Sub-Divn. /CHP (MM)-I&II/Dr.NTTPS as and when required during the period from 01-10-2026 or from the date of commencement of work to 31-03-2027
Conveyance of spilled coal and coal dust collected at MM/CHP/Stage-III / Dr.NTTPS sub-Divisions by Lorry/ Tractor to uncrushed stock yard of CHP/Stage-III as and when required in MM division from 01.10.2026 or from the date of commencement of work to 31.03.2027 (The work is reserved for SC/ST/Vaddera/Reserved societies only).
Replacement of damaged mother and liner plates, replacement of damaged seal sheets in MM-I&II/CHP/STG-IV/Dr.NTTPS as and when required during the period from 01-10-2026 or from the date of commencement of work to 31-03-2027
Erection of new Vanes / repair of damaged Inlet guide vanes of parallel ESP's of Units I&II during the Annual Overhaul for the year 2026-27.
Dr MVR RTPP O and M Resurfacing of damaged BT roads and jungle clearance in Dr MVR RTPP Colony
SUPPLY ERECTION TESTING AND COMMISSIONING OF NEW FULLY IGBT BASED 2X120KVA UPS SYSTEM INCLUDING AC DISTRIBUTION BOARDS (ACDB) UNDER BUY BACK SCHEME WITH EXISTING OLD 2X120KV UPS AND 2 NOs ACDB SYSTEM
Providing labor assistance for emergency coal clearing of coal heaps, slurry coal on all floors of crusher house and jammed coal and wet and slurry coal in crushers, vibrating screens & belt feeder chutes and clearing of heavy coal heaps during rainy season in M-1(crushers), /CHP(M.M)-I&II/Dr. NTTPS. as and when required from 01-10-2026 or from the date of commencement of work to 31-03-2027.
Providing assistance for uninterrupted coal conveyance from wagon tipplers 5 to 6 to crushers & crusher to bunkers due to complete wet coal at different chutes, Location & transfer points and Providing of labour charges for breaking & clearing of heavy size coal boulders and shale in coal rakes received from M/s MCL, M/s SCCL, M/s ECL and M/s WCL & Coal Clearing on wagon tipplers 5 to 6 Grid hoppers in Operation Division/ CHP / Stage- III&IV/ Dr.NTTPS as and when required, during the Period from 01.10.2026 or from the date of Commencement of work to 31.03.2027 or till the exhaust of quantities.
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5Metres per second pertains to Stage-3 &4 of CHP, transport of shale to Dump yard within the premises of CHP (distance: 0 to 5 KM) and cleaning of drains at crushed stock yards of Stg-3&4 as and when required during the period from 01-10-2026 or from the date of commencement of work to 31-03-2027
Picking of shale stone, oversize coal and foreign material from the coal on running conveyor belts running at the speed of around 3.5Metres per second pertains to Stage-1&2 of CHP, transport of shale to Dump yard within the premises of CHP (distance: 0 to 5 KM) and cleaning of drains at crushed stock yards of Stg-1&2 as and when required during the period from 01-10-2026 or from the date of commencement of work to 31-03-2027
Various miscellaneous Works pertaining to Stage-III&IV/CHP which includes Quenching of Fires, Clearing of chute jams, cleaning of the Stagnated wet coal and its coal boulders at wagon tipplers-5&6 and charges for movement of load wagons from railway siding to wagon tipplers-5&6 and formation of empty wagons and return to railway siding, pertaining to Operation Division/Stage-III&IV /Coal Handling Plant /Dr. NTTPS as and when required during the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 or till the exhaust of quantities.
SDSTPS-3X800MW-Painting to the external walls and attending repairs to the external wall cracks for C02-Bloclk in pinakini colony of SDSTPS Town ship.
Manual unloading of coal from wagons at Road no.4, 4A,24 & Ext. Road No.23 with Proclainers from the date of commencement of work to 31.03.2027 (or) till the completion of quantities whichever is later.
Designing, engineering, financing, procurement, construction, operation and maintenance of the power station under and in accordance with the provisions of a long term agreement for supply of Electricity (the “Power Supply Agreement- DBFOO” or the “PSA- DBFOO”) to be entered into between the Supplier and the Utility in the form provided by the utility.
Charges for Critical repair works and movement of locos & dozers from railway marshaling yard to loco shed/Maintenance pit/dozer shed/Diesel bunk and return back to railway marshalling yard /pile, coal yard in L&EM/CHP/Dr NTTPS as and when required during the period from 01-10-2026 or from the date of commencement of work to 31-03-2027
Various miscellaneous Works pertaining to Stage-I&II/CHP which includes Quenching of Fires, Clearing of chute jams, cleaning of the Stagnated wet coal and its coal boulders at wagon tipplers-1 to 4 on emergency basis and charges for movement of load wagons from railway siding to wagon tipplers-1 to 4 and formation of empty wagons and return to railway siding, pertaining to Operation Division/Stage-I&II /Coal Handling Plant /Dr. NTTPS as and when required during the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 or till exhaust of quantities
Up keeping by clearing of emergency jammed coal and slurry coal at various chutes and various jammed places of junction Towers, sump pump pits,conveyors-23, 16A/B, 17A/B, 18A/B, 19A/B, RFC-3,4 and conveyor-24 in M-IV Sub- division of MM/CHP/Stage-III/Dr. NTTPS as and when required during the period from 01-10-2026 or from the date of commencement of work to 31.03.2027
Emergency repair works, DM water filling, lube oil fillings & etc. for locos and dozers as and when required during the period from 01-10-2026 or from the date of commencement of work to 31.03.2027
Carrying out Erection of temporary platform inside furnace just above gooseneck, erection shifting and dismantling of pneumatically operated Sky climbers High pressure Jet cleaning of furnace water wall tubes of Unit 1 boiler during annual overhaul period for the year 2026 27
SUPPLY OF TRANSDUCERS AND TRANSMITTERS FOR UTILISATION OF POWER TRANSFORMERS
SUPPLY OF NEOPRENE RUBBER GASKET SHEETS UNDER STOCK ITEMS FOR STORES DIVISION
SUPPLY OF ESP Spares(Thermostats, Pin insulators, shaft insulator heaters and support insulator heaters) pertaining to Stage-V, Dr. NTTPS.
Supply of 400A Switch fuse unit with enclosure and 400A,250A switch fuse disconnectors for use in transformers pertaining to Stage-IV, Dr. NTTPS
SUPPLY OF FLANGES FOR DRC PIPES 300 NB AND 250 NB REQUIRED FOR SILO ASH SYSTEM OF AHP/STAGE-I
AMC for replacement of gravimetric feeder belts, replacement of head pulley bearings, coupling halves, studs, bronze and rubber bushes of main drive pulley coupling, take up pulley bearings replacement and overhauling of main reducer gearbox, RC feeders and patch welding of 22 inch coal pipes from all corners of boiler to classifier outlet gate and dismantling of damaged feeder outlet upper and lower chutes and replacement of new or reconditioned chutes, replacement of center feed pipe of 36 inch gravimet feeder outlet, repairing of 22 inch coal pipes from classifier outlet gates to all corners of boiler and rectification of coal leaks in critical areas of in service 22 inch coal pipes (48 Nos) from mill outlet bends to fuel inlet bends, clearing of coal jam at bunker chute or bunker raw coal gate of Unit-3 and 4, Stage-II, Dr. MVR RTPP as and when required for a period of 06 months from 01.10.2026 or the date of awarding work to 31.03.2027.
Repairing of Induced Draft fan Spiral Casing to prevent escape of ash and flue gases from ID fans casing of Unit 1 and 2 during the year 2026 27
Providing of patch repairs and carrying out of belt jointing works
Dr.NTTPS - Stage-V - AHP - Construction of sedimentation tank with approach road beside stage-V Hydrobins.
DR. MVR RTPP-STAGE-I- EM&MRT-PROCUREMENT OF LT SWITCH GEAR PANEL OF 415V, 3PHASE, 4WIRE, 50HZ, 2500A ALUMINUM BUS BAR WITH FAULT LEVEL 50KA/1SEC FOR ASH POND