Loading…
Loading…
216 live125 closing this weekmost from APGENCO and APCPDCL/APPCC
216 results • Latest
Re-railment charges of derailed load, Empty Coal Wagons ,Brake van and Locos on Wagon Tipplers 1,2,3,4,5&6 Rail Tables, Out Haul and Inhaul sides, Marshalling yard, different numbers of road points and BOBR coal wagons at 6 A/B Track Hopers in Operation Division/CHP/Dr.NTTPS as and when required during the period from 01-10-2026 or from the date of commencement of work to 31.03.2027
Different types of mechanical maintenance works in Crusher house at MM-III sub division of CHP-III/Dr.NTTPS as and when required during the period from 01-10-2026 or from the date of commencement of work to 31.03.2027
Poking of Bunkers of Stage-I&II from bunker floor for establishing coal flow to the mills of Units 1,2,3&4 while mills are in service in MM-II/CHP-I&II/Dr.NTTPS as and when required during the period from 01-10-2026 (or) from the date of commencement of work to 31.03.2027
Supply, Installation, Testing and Commissioning of CCTV Surveillance System across the Coal Conveyor System of CHP/Stage-I&II of Dr.NTTPS/APGENCO on turnkey basis
Replacement of boiler roof Sheeting in Unit -1 Boiler
Lifting of Coal powder, Ash and the other reject material collected from the mill reject system of Unit-1&2, SDSTPS and disposing the same at suitable place as and when required for the period from 01.10.2026 to 31.03.2027
SUPPLY OF HIGH PRESSURE JOP HOSES FOR THE MAIN TURBINE BEARING PEDESTAL NOS. 1 TO 5 IN TMD OF UNIT-3
PROCUREMENT OF CGL CAPART BAJAJ PHILIPS HAVELLS AND GOLDWYNE LIGHTING MATERIAL IN COAL PLANT
ENQUIRY FOR DESIGN, MANUFACTURING SUPPLY AND COMMISSIONING OF 12 TON SG UNDERSLUNG CRANE OF SPAN - 9.6 MTRS AND SUPPLY OF DSL BUS BAR (100A GI) ALONG WITH CURRENT COLLECTOR (1SET) FOR 36MTRS LENGTH AT AIR COMPRESSOR HOUSE/STAGE-1
SUPPLY OF M/S.EATON MAKE JACKING OIL (JOP) FILTER ELEMENTS FOR TG SET IN TMD OF UNIT-3 FOR THE YEAR 26-27
Transportation of coal from Junction towers (JT2 to JT9) along with merged locations of JT2A, JT2B, Surroundings of new crusher house, JT5A and along the 4C,6C conveyors to Uncrushed coal yard or stacker yard in MMSD-II of CHP/RTPP for the period from date of issue of LOI to 31.03.2027
ENERPAC MAKE HYDRAULIC JACKS AND ADOR FRONTECH MAKE PORTABLE WELDING MACHINE
Periodical, Preventive & break down Mechanical maintenance of Gear Boxes, Pulleys ,including counter weight lifting, Deck sheets, C Channels, Dewatering pumps, Screen shafts replacements, Vibrofeeder pan assembly and other mechanical equipments of all Conveyors 4A, 4B, BF-1&2 ,RBF-1,2 & 3,5A,5B,6A,6B FC-1A,1B ,7A,7B, 5C, 5D, 5E,1C,1D,3C,BFC,3D,3E,3F,4C,RSFD,6C, UC2 in MMSD-11/CHP/ Dr.MVR RTPP for the period of 3 months from date issue of LOI.
Periodic Testing of Unit 7 (500 MW) Generator as per Regulation 40 of IEGC 2023,SRPC GI guidelines.
Transportation of coal from Junction towers (JT-5 to JT-11) to stacker yard in MMSD-III of CHP/RTPP for the period from 01.10.2026 to 31.03.2027
Transportation of coal from WTs to JT2, in the galleries of 1A,1B,2A,2B, the Pent House to JT2 underneath the conveyors 3A/3B, UC-1 & RC-1 galleries and Surroundings of JT2 to Un crushed coal yard in Conveyor section of MMSD-1 of CHP/Dr.MVR RTPP for the period from the date of LOI to 31.03.2027.
Cleaning and Carrying out D-meter survey of boiler tubes in I&II passes of Boilers-I&II, Overhauling of boiler drum, CBD & IBD tanks, Phosphate & Hydrazine tanks and replacement of Seal air filters of Units-I&II during Annual overhaul for the year 2026-27.
Providing labor assistance for upkeeping of conveyors & Stackers/Reclaimers in M-II & M-IV Sub-Divns./CHP(M.M)-I&II/Dr.NTTPS. as and when required during the period from 01-10-2026 (or) from the date of commencement of work to 31.03.2027
Erection, shifting and dismantling of pneumatic operated Sky Climbers inside the furnace of Boilers I & II, Water washing of boiler tubes in I&II passes of Boilers I & II and Servicing of Pneumatic operated sky climbers as and when required (including AOH) for the period from 01.10.2026 to 31.03.2027.
Break down works of Units-I & II Boilers Pressure parts as and when required for the period from 01.10.2026 to 31.03.2027.
Painting to the Structural members of Trestles of 28A/B, 29A/B conveyors in MM-I/CHP/Stage-IV/Dr.NTTPS.
Different types of mechanical maintenance works as and when required on Conveyor section MM-II sub division of CHP-III&IV/Dr.NTTPS as and when required during the period from 01-10-2026 or from the date of commencement of work to 31.03.2027
Replacement of the damaged insulation over FG Ducts, steam pipe line, around boiler Ist & II nd pass & Replacement of Refractory at various locations of Boiler of Unit-I & II as and when required for the period from 01.10.2026 to 31.03.2027 including in Annual Overhauling works.
Removal of ash and dust from pent house, Pent house Deck, F.G. Ducts, Hot PA ducts, APH and various locations of Units-I&II Boilers as and when required (including AOH) for the period from 01.10.2026 to 31.03.2027.
Different types of mechanical maintenance works in MM-I&II /CHP/Stage-IV/ Dr.NTTPS as and when required during the period from 01-10-2026 or from the date of commencement of work to 31.03.2027.
Attending various emergency mechanical maintenance works in vibrating screens of Maint.-I (CRUSHERS) Sub-Divn. /CHP (MM)-I&II/Dr.NTTPS., as and when required from 01-10-2026 or from the date of commencement of work to 31.03.2027.
Different types of Mechanical Works in MM-I(Conveyors), MM-II & MM-IV Sub -Divisions /CHP-I&II/Dr.NTTPS, as and when required during the period from 01-10-2026 or from the date of commencement of work to 31.03.2027
Labour charges towards Emergency Up-keeping in MM-I&II/CHP/STG-IV as and when required during the period from 01-10-2026 or from the date of commencement of work to 31.03.2027.
ATTENDING VARIOUS EMERGENCY MECHANICAL MAINTENANCE WORKS IN CRUSHERS AND BELT FEEDERS FOR MAINT.-I (CRUSHERS) SUB-DIVN. /CHP (MM)-I&II/DR.NTTPS, AS AND WHEN REQUIRED DURING THE PERIOD FROM 01-10-2026 OR FROM THE DATE OF COMMENCEMENT OF WORK TO 31.03.2027
Attending Various Emergency Mechanical Maintenance Works In Maint.-I (Crushers) Sub-Divn. /CHP (MM)-I&II/Dr.NTTPS, Like Replacement of Various Bearings, Plumber Blocks and Shafts Of Crushers/Vibrating Screens And Replacement Of Pullies( DE And NDE) , Bearings And Sleeves For Belt feeders And Dust Extraction System Of M-1 Crushers as and when required during the period from 01-10-2026 or the date of commencement of work to 31.03.2027.
Replacement of eroded and Worn-out 406 mm OD MS ERW pipes with new 406 mm OD MS ERW pipes for a length of approximately 1500 mtrs on ADL-2&3 along with fabrication and replacement of rusted MS pedestals in the Closed Tunnel from PD.No.650 to 928 of CAM/stage-II/Dr.NTTPS during the year-2026-27.
Lifting & Transportation of ash, soot etc., collected in the ESP hoppers and conveying lines areas of Unit-1 ESP Fly ash system and other areas and disposal off the same at suitable place as per the instructions of the engineer-in charge during the financial year 2026-27
Replacement of the damaged portion of the roof and rectification of damaged roof trusses over the record room of the Accounts wing in the Old Accounts Office at SDSTPS
DR.MVR RTPP-STAGE-I-EM&MRT- PROCUREMENT OF NUMERICAL UNDER VOLTAGE RELAYS -OFFERREQ- REG
DR.MVR RTPP-STAGE-I-EM&MRT- PROCUREMENT OF NUMERICAL MOTOR PROTETION RELAYS
DR.MVR RTPP- STAGE-II- CAM- PROCUREMENT OF NUTS AND BOLTS ARE VARIOUS SIZES REQUIRED FOR MHV VALVES, RSV VALVES, SSV VALVES, CLINKER GRINDERS AND FEED GATES OF AHP
Providing of patch repairs and edge repairs, carrying out of belt jointing works, relagging of pulleys, belt dragging and belt replacement works for the conveyor systems available from JT-5 to JT-9 and JT-9 to Bunker house in MMSD-III/CHP/Dr MVR RTPP for the period i.e., from 01-10-2026 to 31-03-2027
Overhauling and Running Maintenance of 12 Nos XRP 883 Bowl mills of Unit-3 and Unit-4 of Stage-II/Dr. MVR RTPP for the period from 01.10.2026 or the date of awarding work to 31.03.2027
Periodical, Preventive & break down Mechanical maintenance of Gear Boxes, Pulleys, including counter weight lifting, Decksheets, C Channels, Dewatering pumps, and other mechanical equipments of all conveyors available in MMSD-III/CHP/ DrMVR RTPP for the period 3 months from the date of issue of LOI
DR.MVR RTPP-STAGE-IV- EM&MRT- PROCUREMENT OF CRITICAL SPARES FOR ABB MAKE VACUUM CIRCUIT BREAKERS IN 600MW UNIT
DR.MVR RTPP-STAGE-I-EM&MRT-PROCUREMENT OF THERMAL OVERLOAD RELAYS FOR LT SWITCHGEAR PANELS.
Dismantling and shifting of screw conveyor inside the mill, re erection including tie rods, screw conveyor bearing housing and stuffing box, replacement of eroded feed pipe, mixing box and transition piece with new spares, replacement of screw conveyor removable shaft of Unit 5 & 6 mills as and when required for a period of 6 months from the date of commencement of the work during the year 2026-27.
Overhauling of Air Preheaters 1A & 1B and 2A & 2B during the Annual overhaul for the year 2026-2027.
Overhaul of Bottom ash hoppers during the annual overhaul of Unit-I & II for the year 2026-27.
APGENCO-SRBHES- R&M- Design, Manufacture, Supply, testing and commissioning of 3Nos. of 11KV feeder Control & Protection panels with the latest numerical relays duly replacement of the old 11KV feeder Control & Protection panels at 220KV Switch yard, SRBPH, Srisailam Project, Nandyala (Dt.), Andhra Pradesh -518102
Lifting of 1.0 MMT of raw coal from Naini Coal Mine of M/s SCCL located in the state of Odisha and transportation of raw coal from Naini pithead to any of the nearest railway siding by Road mode, stacking and loading of raw coal into railway wagons from the siding and delivery at Dr.NTTPS, Ibrahimpatnam, Dr. NTR Dist, Andhra Pradesh.