Loading…
Loading…
1,193 results • Latest
PROCUREMENT OF VARIOUS SWITCHGEAR MATERIAL LIKE TIMERS AND OVERLOAD RELAYS ETC. OF L&T MakeSUITABLE FOR L&T SWITCH GEAR PANEL of EM&MRT,I&C- STAGE-IV.
Procurement of ceramic pulley lagging mat
Replacement of damaged mother and liner plates, replacement of damaged seal sheets in MM-I&II/CHP/STG-IV/Dr.NTTPS as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Procurement of GI,MS pipes & Fittings for Air line and sulphuric acid system
Procurement of certain Globe valves(2"-C2500-Hand operated & Motor operated)
SUPPLY OF PLAIN ALUMINIUM SHEET FOR ALL DUCTS OF UNIT-IANDII BOILERS
SUPPLY OF PAINT BRUSHES AND STEEL WIRE BRUSHES FOR Dr.NTTPS
DR.MVR RTPP-STG-II & III- EM&MRT- PROCUREMENT OF ABB MAKE TCS, LOCK OUT & UV RELAYS FOR EM&MRT
DR.MVR RTPP-STAGE-IV-EM&MRT-PROCUREMENT OF HOPPER HEATERS OF ELECTROSTATIC PRECIPITATORS PERTAINING TO SD-III
SUPPLY OF 70W LED STREET LIGHT AND 70W LED WELL GLASS LUMINARIES
SUPPLY OF DISPOSABLE SURGICAL MASKS
SUPPLY OF WOOL MATTRESS FOR THE YEAR 2026-27
Procurement of Spares for Flame scanner system and HEA Ignition system
Procurement of Pressure and Level Transmitters
Dr. MVR RTPP-M12-BM&AHP-Stage4-Procurement of bends and tees for ash handling plant-reg.
Overhauling of Coal, Oil & Auxiliary air nozzle shaft assemblies, ignitor air, scanner air hoses, seal tubes, oil gun assemblies & replacement of worn out Coal burners in Unit-3 Boiler during 2026-27 overhaul
Complete dismantling, Inspection, Replacement of damaged Copper pipes in condenser, replacement of required spares and material to screw compressor and re-assembly and refitting in Chiller-1 unit-I for Stage-II for the Year 2026-27
DR.MVR RTPP-ALL-PROCUREMENT OF "MAFRON MAKE OR ITS EQUIVALENT MAKE, R-22 REFRIGERANT GAS (HCFC-22 OR CHCLF2) AS PER IS: 17584/2005 STANDARDS IN APGENCO/ COMPANY'S CYLINDERS -REG.
Procurement of Copper cables of different sizes for lighting purpose
Manual unloading of coal from wagons at Road No.15 with poclains/JCB in the Marshalling Yard and loading the same coal into the tippers with poclains/JCB at CHP/Dr.MVR RTPP and transportation of this coal by tippers(0-1Km) to RC Yard/ Stacker Yard of CHP/Dr.MVR RTPP for improving coal stock, as and when required from date of commencement of work upto 31.03.2027 or till the completion of Quantity whichever is earlier at CHP
Repair and Rewinding of Marathon make 3-Phase, 6.6 kV, 43 Amp, 400 kW, Conveying Air Compressor Motor
Maintenance of Roller Journal Shaft Assemblies, Replacement of worn out Bullring Segments and Grinding Rollers Change of Cam position Alignment Patch Welding Work and change of Spilt Oil Seals of Bowl Mills of Stage-III/Dr. MVR RTPP from 01.05.2026 to 30.09.2026
Replacement of gravimetric feeder belts Replacement of head pulley bearings coupling halves studs bronze and rubber bushes of main drive pulley coupling opening and closing of R.C.feeder doors,replacement and overhauling of main reducer gear box of R.C.Feeders and replacement/repairing of feeder outlet gates and chutes of R.C Feeder Patch welding of 22 inch coal pipes from all corners of unit-5 Stage-III Dr.MVR RTPP as and when required during the Period of 01.05.2026 to 30.09.2026
Clearing of accumulated ash at ESP hoppers area Intermediate silo area Remote Silo area along the ash conveying pipe lines,Bottom ash hoppers area,Coarse ash hoppers area and transporting the same to the ash pond by trucks tractors for a period from 01.04.2026 to 31-03-2027 in Ash Handling Plant of Unit 5 ,Dr. MVR RTPP
SUPPLY OF WATER COOLERS FOR UTILIZING IN VARIOUS SHIFT LOCATIONS OF GENERAL DIVISION /STAGE III & IV
Attending various emergency mechanical maintenance works in vibrating screens of Maint.-I (CRUSHERS) Sub-Divn. /CHP (MM)-I&II/Dr.NTTPS., as and when required from 01-04-2026 or from the date of commencement of work to 30-09-2026
Supply of Brown fused Aluminium oxide grains for Main Turbine of Unit-5
ATTENDING VARIOUS EMERGENCY MECHANICAL MAINTENANCE WORKS IN CRUSHERS AND BELT FEEDERS FOR MAINT.-I (CRUSHERS) SUB-DIVN. /CHP (MM)-I&II/DR.NTTPS, AS AND WHEN REQUIRED DURING THE PERIOD FROM 01-04-2026 OR FROM THE DATE OF COMMENCEMENT OF WORK TO 30-09-2026
Providing of patch repairs, carrying out of belt jointing works, edge repairs, relagging of pulleys and belt replacement works for the conveyor systems 1C,1D,3C,BFC,3D,3E,3F,4C,RSFD,6C, UC2 and JT-2 to JT-9 (Except JT-7&JT-8) ,RBF-1, 2&3 , Conveyor -5C, 5D,5E in MMSD-II of CHP/ Dr.MVR RTPP for the period upto 30.09.2026 from the date of issue of LOI
Annual Maintenance of Air conditioners and water coolers available in the residential and non residential buildings in the colony area Dr MVR RTPP for the period from 01/08/2026 to 31/07/2027
Annual Maintenance of Air-conditioners available at office rooms in Stage I II III power house area RTPP for the period from 01/08/2026 to 31/07/2027
SUPPLY OF ACOUSTIC SENSOR FOR BHEL SONIC STEAM LEAK DETECTION SYSTEM (BS 10)
SUPPLY OF "L&T" MAKE SWITCHGEAR SPARES
Attending Various Emergency Mechanical Maintenance Works In Maint.-I (Crushers) Sub-Divn. /CHP (MM)-I&II/Dr.NTTPS, Like Replacement of Various Bearings, Plumber Blocks and Shafts Of Crushers/Vibrating Screens And Replacement Of Pullies( DE And NDE) , Bearings And Sleeves For Belt feeders And Dust Extraction System Of M-1 Crushers as and when required during the period from 01-04-2026 or the date of commencement of work to 30-09-2026
Conveyance of spilled coal and coal dust collected at MM/CHP/Stage-III / Dr.NTTPS sub-Divisions by Lorry/ Tractor to uncrushed stock yard of CHP/Stage-III as and when required in MM division from 01.04.2026 or from the date of commencement of work to 30.09.2026 (The work is reserved for SC/ST/Vaddera/Reserved societies only).