Loading…
Loading…
1,182 results • Latest
Supply of Drive pulleys for Conveyors
DR.NTTPS/SUPPLY OF RTDs AND THERMOCOUPLES
SUPPLY OF CRUSHER BEARING LOCK NUTS AND CRUSHER BEARING LOCK PLATES "
SUPPLY OF DE-NORA OR EQUIVALENT MAKE ELECTROLYZER FOR ELECTRO CHLORINATION PLANT
SUPPLY OF R134A GAS FOR AIR CONDITIONING SYSTEM
SDSTPS -3X800MW- Filling low lying area for strengthening the ECCS pillars and safe guard the lands of APPDCL for approximate length of 175m from pillar No.3 towards head end.
Regular and Breakdown repair works of C&I Equipments in BOP area of PLC Control systems of EM,MRT,I&C as and when required during the period from 01.04.2026 to 31.03.2027
Different types of Mechanical Works in MM-I(Conveyors), MM-II & MM-IV Sub -Divisions /CHP-I&II/Dr.NTTPS, as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Attending repairs to the vacant old D type quarters in D4 D5 D6 D7 blocks in Pinakini Colony at SDSTPS Township
SDSTPS-3X800MW- Attending repairs to the vacant old E-type quarters in E1, E2, E3 & E4 blocks in Pinakini Colony at SDSTPS Township.
SDSTPS-3X800MW- Attending repairs to the vacant old D-type quarters in D1, D2, & D3 blocks in Pinakini Colony at SDSTPS Township
Replacement of faulty switch boards, Switches, Sockets, Ceiling Fans, Tube lights and wires in various quarters and in A, B, C, S, SRT colonies, Plant area and Repairing and Removing/Refixing of faulty Street light fixtures of various capacities (70W/150W/ 250W/400W) pertaining to Services sub division-I&II of SS&T Division /Dr.NTTPS for a period of 6 months from the date of commencement of work as and when required for the year 2026-27.
Annual general cleaning and maintenance of HT motors, boards and bus ducts of Boiler,Turbine and common auxiliaries of unit 5 & 6 of Stage-3 Dr.NTTPS during the Annual Overhaul period for the year 2026-2027.
Breakdown maintenance works of Generator 5&6 and its auxiliaries during year 2026-27
Repairs of flue gas duct (APH outlet and to ESP inlet) at the boiler of unit-2 including T@P and consumables during the running and annual overhaul period 2026-27
Repairs to Hot primary air ducts (i.e. cross over ducts to common interconnecting ducts across 9th to 12th floors) in the boiler of unit-2 during the running and overhaul period 2026-27 include insulation works, Air cleaning and all T&P consumables
Repairs to secondary air duct (APH out let to wind box inlet) & Flue gas duct (Economizer outlet to APH and ESP outlet to Chimney area) in the boiler of unit-2 including T&P and consumable during the running and annual overhaul period 2026-27
Break-down and running maintenance works for Aluminum sheet and Insulation for ducts (All elevations of primary air (cold and hot), hot secondary air and flue gas) as and when required during the period from 01.04.2026 to 31.03.2027 for Unit-2 Boiler including T&P and consumables
Fly Ash System-Round the clock direct collection of the Coarse Ash, fly ash, soot etc., from UNIT # 2 A&B Pass ESP Hoppers by placing the tractors below the hoppers and disposing at suitable place as per the instructions of the engineer-in charge during the year 2026-27
Certain Maintenance works (Break down and Repair works) and Overhauling of PA fans including their lube oil systems and Seal Air fans of Unit-2 Boiler including T&P and consumables during overhaul period 2026-27
Replacement of Damaged Shaft sleeves with new one, overhauling of CW Pump, Rebabbitting of Journal/guide bearing& reconditioning of thrust collar assembly of CW pump model CVP-1850 of Units-1&2 at CAM-I/SDSTPS/stg-1 as and when required during the year 2026-27
Overhauling/Servicing/replacement of various sizes of valves and welding of pin holes at Valves end connection in boilers of Units- 5&6 as and when required and during Annual Overhaul periods for a period of 6 months from the date of commencement of the work during the year 2026-27.
SUPPLY OF 200NB ARV S AND ISOLATING BUTTER FLY VALVES FOR CW LINES AT CONDENSER AREA AT CAM-I
SUPPLY OF FILTER FOR ACWP STRAINER LOCATED AT CAM-1 /SDSTPS/STG-1
Providing assistance for uninterrupted coal conveyance from wagon tipplers 5 to 6 to crushers & crusher to bunkers due to complete wet coal at different chutes, Location & transfer points and Providing of labour charges for breaking & clearing of heavy size coal boulders and shale in coal rakes received from M/s MCL, M/s SCCL, M/s ECL and M/s WCL & Coal Clearing on wagon tipplers 5 to 6 Grid hoppers in Operation Division/ CHP / Stage- III&IV/ Dr.NTTPS as and when required, during the Period from 01.04.2026 or from the date of Commencement of work to 30.09.26
Replacement of damaged mother/liner plates in all the chutes of surge hoppers, Vibrating screens, Crushers, bypass chutes and belt feeder chutes and Carrying out various Patch welding works for all the chute leaks by welding with MS plates for all the chutes available in Maint.-I (CRUSHERS) Sub-Divn. /CHP (MM)-I&II/Dr.NTTPS as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Maintenance of MDR Roads in R&B Section Koduru of R&B Sub DIvision Avanigadda for the year 2026-27 P1
Completion of incomplete Telukula community hall in 13th ward of Samalkot Municipality under APUFIDC Soft Loan
DR.NTTPS-STAGE-IV-SPARES FOR SWIFT MAKE HOISTS AND (II) CONTATORS AND RELAYS FOR ALL ELEVATORS(BOILER LIFT,CHIMENY LIFT AND SERVICE BUILDING LIFT)-REG
Renovation of water Treatment Plant at Ram Nagar in Buja Buja Nellore Division No.25 of Nellore Municipal Corporation (Package No.05) Under 15th FCG (2025-26) 1st Installment Tied Grant
Construction of New Toilets to 83 & 84 Secretariats at R&B Vambay Building (Sachivalayam Building) in 45th Division of RMC.
Construction of Seven Storied Rajagopuram to Sri Vanam Lakshmi Venkateswara Swamy Temple, Ramallakota(V), Veldurthy(M), Kurnool District
Laying of CC Road from Jedimalla Nageswararao House (D.No:-13-150B) to Jedimalla Malleswararao House (D.No:-13-152) in Ward No.20.
Fabrication and Erection of High Level Canal and Low Level Head Sluice Gates of Sri GBA Rao Thatipudi Reservoir Project in Thatipudi Village Gantyada Mandal of Vizianagaram District
Supply and delivery of CI (cast iron) Sluice Valves & CL-20 CID Joint for maintenance of water supply system in Ananthapuramu municipal corporation for the year 2025-26.
Supply of 1.5T split type air conditioners along with Installation
Improvements to Ayacut road towards Sunki reddy kunta near Durvesi (V), Gadivemula (M), Nandyal District
Excavation of Surplus Channel for Budalamma Cheruvu, Budanampalli (V) Mudigubba (M) Sri Sathya Sai District (Balance Earth Work)
Repairs to Sluices No. 2 & 3 of Pedda tank under Jaladara - Jalaharathi in Murari Village of Gandipalli Mandal, Kakinada District (UNDER DMF GRANT) JALADHARA-JALAHARATHI Class-II Mechanical Registration Certificate and above (Fabrication and Erection of Structural Steel)
Providing Wet Mix Macadam Road from Malla Kondalu House to Dhulipalla Srinivasarao House in Raghuram Nagar Extension Area, in 16th ward of Sattenapalle Municipality