Loading…
Loading…
1,182 results • Latest
Engage of hire vehicle to Deputy City Planner IV for a period from 01.04.2026 to 31.03.2027 for official purpose (2nd call)
Shifting of drain crossings of distribution lines in various places in AE-13 Section Circle-II Area
Procurement of Supply of Stationery Items for a period of 12 months
Providing footpath cum drains to the existing Berm portion near TTD circle in ward no:17 of East Zone,
Providing Annual Maintenance (Civil) of VMRDA Children arena and Gurujada Kalakshetram at Siripuram, Visakhapatnam for a One year period from 1-7-2026 to 31-3-2027 (9 months)
FDR - 2025- Temporary Restoration and Removal of obstructions in feeder channel bed of Nagireddy varava and Thurpu varava of Budanam Tank near Budanam village in Chillakur Mandal of Tirupati District.
Construction of BT Road from Athimamabakam to Alapakam Kandriga in Nindra Mandal of Chittoor Dist. Estimate Cost Rs.59.00 Lakhs
Construction of Public Toilet Block (Type-D) at North side of GNC area KKC duly dismantling the old dilapidated existing toilet at Tirumala
Nidadavole Municipality - Municipal General fund - Construction of C.C Drain to old pangidi road from Golingeswara swamy temple to RF Road D.No.11-4-81 in 7th ward.
Construction of Multipurpose Hall near Yanamadala Ramaswamy Choultry at Appanaveedu (V) of Pedapadu (M) Estimate cost. Rs.40.00 Lakhs (MPLADS)
Improvments to irrigation System of Pedda tank in Mulagapudi village in Rowthulapudi mandal (UNDER DMF GRANT) JALADHARA-JALAHARATHI Class-II Mechanical Registration Certificate and above (Fabrication and Erection of Structural Steel)
(i) Construction of CC Drain from Vinayaka Temple to Manepalli Natrajkumar near panta kaluva, (ii) Construction of RCC Culvert at Manepalli Natraj kumar house, Makkarao colony in 4th ward of Yeleswaram Nagar Panchayat.
Providing Sand Bags for Obstructing back water Flow for Ensuring rainy season 2026 at 20MLD and 10MLD STPs Ramalingeswara Nagar in Circle III area
Replacement of HV600 VFD power board & IGBTS in the existing panel board at bhaskar nagar pump house in victoria water works of kmc. (recall)
Carrying out miscellaneous shrouding of units-3&4 boilers during annual overhaul period for the year 2026-27.
Replacement of IPW joints, DMW joints, attachment welds in HTRH, HTSH and ITSH coils of units-3&4 boilers during annual overhaul period for the year 2026-27.
procurement of Gland Packing Rings for Annual Overhaul works of the year 2026-27.
PROCUREMENT OF SHAFT SLEEVES FOR CW PUMPS.
Ball tube mill externalAMC works like overhauling and replacement of MR/AR gear box,pinion bearings,Hot air box,feed pipe assembly and checking /tighting of various types mill bolts etc of units 3&4 stage-II for the period of six months as and when required during the year 2026-27fromt the date of commencement of work to 30.09.2026.
Complete rewinding(VPI type) of Stator of 6.6 KV, 1250KW,1490RPM, SL.No. 40139A-401-31-04, BHEL make PA fan motor of Stage-III, Dr.NTTPS.
Dr.NTTPS Carrying out DE silting operations in C W Canal using Dredger conver 90 for the year 2026 27 up to 30.09.2026
Overhauling and replacement of various valves of U-3&4 in turbine division during the AOH for the year 2026-27.
Erection & dismantling of pneumatic sky climbers water washing of horizontal tubes, cleaning of water wall surface of Boilers mechanically and by hydro jet pump, overhauling of CBD, IBD, phosphate dosing tanks, Boiler drums and Servicing Sky climbers, chamfering machines of Units-3&4 boilers during Annual Overhaul period for the year 2026-27.
Supply of 83.5 HP Diesel Driven Dewatering pumps for Dewatering of CW Pump suction chambers and discharge pipe lines up to the condenser area for carrying out repairs works of pipe lines during annual overhaul of Unit- 2 & as and when required for Unit-1&2 during F.Y-2026-27
Lifting and Re erection of badly damaged and bent collecting electrodes, fabrication and erection of new supporting angles, cleat angles in ESP #C&D pass of any field of Unit -2 boiler, welding of U guides and carrying of alignment of collecting electrodes to maintain gap between collecting electrodes include all T&P and consumables for during the overhaul 2026-27
Lifting and Re erection of badly damaged and bent collecting electrodes, fabrication and erection of new supporting angles, cleat angles in ESP #A&B pass of any field of Unit -2 boiler, welding of U guides and carrying of alignment of collecting electrodes to maintain gap between collecting electrodes include all T&P and consumables for during the overhaul 2026-27
SUPPLY OF SPARES FOR JOURNAL SPRING ASSEMBLY OF HP-1203 BOWL MILLS OF UNIT-IANDII BOILERS
Overhauling of Electrostatic Precipitators of Units-3&4 boilers during Annual Overhaul period for the year 2026-27.
Repairs and replacement of damaged insulation at various areas of Boilers in Units-3&4 during the annual overhaul period for the year 2026-27.
Minor overhaul works on generator & its Auxiliaries of units#3 & 4, stg-II, Dr.NTTPS during AOH for the year 2026-27
Dr.NTTPS-Labour charges for painting to the internal & external surface walls of MCR building
Procurement of Centrifuge line filters for MOT & TDBFP oil
Annual overhaul of conventional valves, cooling water valves and control valves of Unit-I&II for the year 2026-27.
Repairs of flue gas duct from economizer outlet to APH inlet and ESP outlet to chimney of unit 3&4 during the AOH for 26-27
Re-rubber lining of tanks, vessels, piping and other equipment in Water Treatment Plant during the year 2026-27.
Carrying out rectification works of SS gratings in economizer, LTR & LTS zones and providing of SS sleeves for economizer tubes at front and rear gratings to avoid tube rubbing of Units-3&4 boilers during Annual overhaul period for the year 2026-27.
Replacement of damaged Main Channel/Guide Channel, Deck Sheets and Supporting Angles for conveyors including replacement of damaged Idler Frames and Idlers in Conveyor section of MMSD-I/ CHP/ Dr.MVR RTPP for the period from the date of issue of LOI to 30.09.2026
Complete dismantling, Inspection, Replacement of damaged Copper pipes in condenser, replacement of required spares and material to screw compressor and re-assembly and refitting in Chiller-1 unit-I for Stage-II for the Year 2026-27
Dismantling and shifting of screw conveyor inside the mill, re erection including tie rods, screw conveyor bearing housing and stuffing box, replacement of eroded feed pipe, mixing box and transition piece with new spares, replacement of screw conveyor removable shaft of Unit 5 and 6 mills as and when required for a period of 6 months from the date of commencement of the work during the year 2026-27.
Repairs to primary air, secondary air, flue gas ducts(APH outlet to ESP inlet) of Units 3&4 boilers during the annual overhaul period for the year 2026-27.
Dr. MVR RTPP-M12-TM&CAM-Stage4-Procurement of spares suitable for raw water pump of make & model :KBL&BHM30-reg.
Carrying out servicing/ overhauling /replacement of various sizes of LP /HP valves of units- 3&4 boilers during the annual overhaul period for the year 2026-27.
Repair and Full Rewinding of Kirloskar make, 190 KW, 6.6KV, 21A, 1487 rpm, M/C. No. : 3930604-2,Frame: KD355) removed from Conveyor 3A in EMSD-I/CHP/Dr.MVR RTPP
PROCUREMENT OF SPARES FOR CLINKER GRINDER ROLL
Overhauling/Insitu repairing of Disc and Seat of certain Valves i.e., HP Bypass (BP) Valve, Spray Valves (BPE), Gate and Globe valves etc., in Unit-3 during annual overhaul for the year 2026-27
Overhauling works on Air pre heaters in Units-3&4 Boilers during the annual overhaul period for the year 2026-27.
SUPPLY OF 250W LED FLOOD LIGHT FIXTURES
SUPPLY OF SEALS FOR HOT AIR GATES OF UNIT-IANDII BOILERS
Supply of TC make Power Contactors and coils of Stage-III, Dr. NTTPS-Reg