Loading…
Loading…
1,193 results • Latest
Charges towards repair and refurbishment of bearing No.1 (Journal Bearing size: 250x180mm) and bearing No#2 (Journal cum thrust bearing size: 380x300mm) at TMD/Stg-II/SDSTPS.
Conveyance of coal Mill Rejects piled up at HP -1103 pulverisers mill reject systems by clearing, lifting and transporting to the designated area at Stage-V/ Dr.NTTPS for a period of six months from the date of commencement of the work
DR.MVR RTPP- ELECTRICAL - PROCUREMENT OF BATTERIED 12V, 42 AH
Break down & Repair works, which include Complete Dismantling, Overhauling and Reassembling of VT Pumps after replacement of Worn-Out Spares. The scope also covers patch welding works at Sea Water Intake Pump house as and when required during the year 2026-27 at AHP-II&SWPH/SDSTPS/Stg-II
Wetting, poking and clearing of jammed coal in the 48 No.s BOBR Hoppers through 6A/6B Conveyor in CHP-Stage-I&II- Dr.NTTPS for the period from 01.04.2026 or from commencement of work to 30.09.26
Supply of Bearing housing for conveyors and VGF's of crusher House
SUPPLY OF BUCKER UP STRIP RUBBER FOR VIBRATING SCREENS OF CRUSHERS
Different types of vulcanizing works in CHP(M.M)-I&II/Dr.NTTPS., as and when required from 01.06.26 or from the date of commencement of work to 30.11.26
SUPPLY OF LANCER TUBE WITH NOZZLES SL.NO.531197-C001 FOR AIR PREHEATER SOOT BLOWER TYPE:IKAH-500 FOR UNIT-IANDII BOILERS
SUPPLY OF ULTRASONIC LEVEL TRANSMITTERS FOR MEASUREMENT OF FUEL OIL TANK AND CLARIFIED SUMP LEVEL
DR.NTTPS/SUPPLY OF ELECTRICAL CONSUMABLES(FUSE LINKS,FUSES AND CIRCUIT BREAKERS)
Urgent Repairs to water supply arrangements by providing Bore Well and Motor supply to the Court Building Complex (G+1) at Palakol in W.G.Dt. (2nd call)
Capital Overhaul of TELK Make 31.5 MVA, 220 KV/7.1 KV Station Transformer-4 (Sl.No:120328) during the Capital Overhaul period for the year 2026-27.
ATTENDING VARIOUS EMERGENCY MECHANICAL MAINTENANCE WORKS IN CRUSHERS AND BELT FEEDERS FOR MAINT.-I (CRUSHERS) SUB-DIVN. /CHP (MM)-I&II/DR.NTTPS, AS AND WHEN REQUIRED DURING THE PERIOD FROM 01-04-2026 OR FROM THE DATE OF COMMENCEMENT OF WORK TO 30-09-2026
Up keeping by clearing of emergency jammed coal and slurry coal at various chutes and various jammed places of junction Towers, sump pump pits,conveyors-23, 16A/B, 17A/B, 18A/B, 19A/B, RFC-3,4 and conveyor-24 in M-IV Sub- division of MM/CHP/Stage-III/Dr. NTTPS as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
SUPPLY OF PVC FILES FOR ECS I ,II AND MCR AS PLANT
Various miscellaneous Works pertaining to Stage-III&IV/CHP which includes Quenching of Fires, Clearing of chute jams, cleaning of the Stagnated wet coal and its coal boulders at wagon tipplers-5&6 and charges for movement of load wagons from railway siding to wagon tipplers-5&6 and formation of empty wagons and return to railway siding, pertaining to Operation Division/Stage-III&IV /Coal Handling Plant /Dr. NTTPS as and when required during the period from 01.04.2026 or from the date of commencement of work to 30.09.26
Supply erection and Commissioning Charges for upgradation of SWAS sampling system of Unit-II.
Laying of new 600NB Raw Water MS Pipe Line header from fuel oil pump house to CW pump house of stage III of approximately 715mtrs running length towards replacement of damaged pipe line of TM(CAM) Stage IV for the year 2026 2027.
Certain break down and repair works, adjustment of eroded grinding rolls and other repair works for HP-1103 Bowl Mills of Unit-8 Boiler Stage-V/Dr.NTTPS as and when required for a period of 06 months from the actualdate of commencement of work the year 2026-27
Replacement of damaged mother and liner plates in 12A/B, 13A/B, 14A/B, 20, 21, 25 conveyors, vibrating feeders, hopper discharge chutes, hopper grid pieces, rail table platform, spill plates, chequered plates and I-Beam of weighment table of wagon tippler-5&6 in MM-I/CHP/Stage-III/Dr.NTTPS as and when required during the period from 01-04-2026 or from the date of commencement of work to 30-09-2026
Attending Break-down repair works for ESP-A,B,C&D pass internals of Unit-8 including all T&P in Sub-division-III of BM & AHP as and when required for a period of 06 months from the date of commencement of the work during the year 2026-27
DR.MVR RTPP-STAGE-IV-EM&MRT,I&C-PROCUREMENT OF ACB MODEL CN-CS 800S1, 4 POLE L&T MAKE CIRCUIT BREAKER & ITS SPARES PERTAINING TO ESP ACP PANELS- OFFER-REQ-REG
DR.MVR RTPP-STAGE-III-EM&MRT-PROCUREMENT OF CONTACTORS, ADD ON BLOCKS AND PUSH BUTTONS FOR ASH PLANT LT SWITCH GEAR MAINTENANCE OF LTSD-2- OFFER- REQ- REG
SUPPLY OF FERRIC, LSF/MB ACID AND CAUSTIC UNLOADING PUMPS WITH SUITABLE MOTOR AND TROLLEY IN WTP-2
Procurement of Legrand/Havells/L&T/Schneider/ C&S/BCH/ Goldmedal make Metal clad Plug & Socket Box with 20A, 1P MCB
DR.NTTPS/SUPPLY OF ABB MAKE VFD DRIVE MODULE COMPLETE SET ALONG WITH RETROFITTING