Loading…
Loading…
1,182 results • Latest
Urgent repairs to Gudivada to kankipadu Road from KM 8.200 to 8.680 and 11.400 to 11.800 in Krishna District
Improvements to Gravity Canal and Reservoir Bund of Basaladoddi LI Scheme under Guru Ragavendra Project
FDR-12/2025-S,P.-BPRC-Restoration of damaged 1 m Drop cum A class Bridge at Km 2.700 of Gowravaram Major Distributory (11R) of BPR Canal
Construction of patch work, C.C Drain & RCC Culvert for free left to Stambalagaruvu Main road Under AE-1 Section, Guntur Municipal Corporation
SDSTPS-3X800MW- Ash pond - Providing of One number of Poclain (Ex200 series) on hire basis for attending emergency works in ash pond from June-26 or actual date of commencement of work.
Replacement of defective gear boxes, geared couplings, input shaft, bearings, oil seals, pulleys and alignment of gear boxes for the conveyors and Wagon Tipplers available in MMSD-I of CHP/Dr.MVR RTPP for the period from the date of issue of LOI to 30.09.2026
Procurement of Various types of Welding Electrodes for the year 2026-27
FDR-12/2025-S,P.-BPRC-Restoration of damaged 1 m Drop cum A class Bridge at Km 2.700 of Gowravaram Major Distributory (11R) of BPR Canal
Overhaul/Breakdown maintenance of various pumps in WTP-II for the FY:2026-27
SUPPLY OF SPARES FOR EMULSIFIER SYSTEM OF STAGE-I
SUPPLY OF MS ORDINARY SLEEVE FOR 400MM CI PIPE OF ASH DISPOSAL LINES.
SUPPLY OF SPARES FOR BOTTOM ASH HANDLING SYSTEM
SUPPLY OF 8 TOOTH SPROCKET WHEEL FOR SCRAPER CONVEYORS OF UNIT-3 AND 4
SUPPLY OF STUDS, BOLTS AND NUTS FOR ADPH AND ASH DISPOSAL LINES-1,2 & 3.
SUPPLY OF DOUBLE SLEEVE FOR 3 NOS ASH DISPOSAL LINES.
DR.NTTPS/SUPPLY OF PRESSURE AND TEMPERATURE GAUGES
Construction of 450mm CC drain and RCC culvert from D.No.19-1-312 (Royala Appartments Residency to D.No.19-1-385/8 in Sudha colony 13th ward in Peddapuram Municipality
2026-HOR01-CB-172 Maintenance of NH-16 Service Road Side Median from Thatichetlapalem hanuman temple to R&B jn with a total extent of 5 kms (sqmts for hedges , Nos of tall trees) for period of 6 months from 01- 06-2026 to 30-11-2026...
Construction of Sahithi Sravanthi Community hall in 14th ward (TS No. 4-10-849/1) under APUFIDC funds
Dr.NTTPS- Stage-IV-Clearing of jungle, cleaning and removal of ash from drains at various places in Stage-IV area for the period from 01.04.2026(or) from the actual date of Commencement of work to 30.09.2026
Supply of Non metallic expansion joints fabric for APH & Flue gas ducts of Units-I&II
Supply of Safety Net Cup Lock Scaffolding of Unit-7 Boiler
Providing RCC Strom Water Drain from D.N0.1-60-61/2 to D.No.1-60-73/1 at Rajeev Gruha kalpa in Ward No.08.of Tuni Municipality.
Providing of PA system to the newly constructed PAC building converted into Akshara Govindam programme at Sri Vakulamatha Temple, Tirupati (Part-B)
Supply and delivery of RCC Precast Movable Divider blocks for various locations in AE-5 Section, Circle-1 area (1st call)
Providing hot applied Thermoplastic Road marking lines & Twin Molded Shanks in Atkinson school road & Kabela Road (From Atkinson school road to Joji Nagar road) in 43rd & 45th divisions, AE-I section of circle-1 Area. (1st call)
SDSTPS-3X800MW- Providing Paint to the External Walls and attending repair to the cracks on walls of F-03 & F06 Block in Swarnamukhi colony @ SDSTPS Township.
SDSTPS-3X800MW- Formation of B.T. Road for approaching the Staker piles 2 & 3
Supply of spares for Material Handling Valves of Dry Fly Ash System
Emergency Replacement, Rectification and Fabrication of MS bends MS/CI pipes & Tyton/sleeve gaskets of three ash disposal lines of Stage-I during the year 2026-27 from 01/04/2026 or from date of commencement of work to 30/09/2026.
SDSTPS - 3X800 MW - Repairing of B.T. Road near N - pit and JNT13 area of Stage-II.
Supply of Spare Control Card, Power Card and PLC for Slewing and Travel DC Drive panels of Stacker/Reclaimer-II
Supply and Delivery of Coconut oil, Soaps to sanitation workers of Srikakulam Municipal Corporation
HNSS Project Phase II Strengthening of the canal From Km 442 400 to Km 443 700 of HNSS Main canal for the year 2026 2027 in Sri Sathya Sai Dist.
Providing 100 Mbps FTTH Internet connection to 89 Nos of Ward Secretariats in NORTH Zone for the period of 24 Months.
Labour charges for Attending miscellaneous maintenance works like Changing Plummer Blocks, Hydraulic Hoses, O-Rings, Chain links, Buffer Springs, Emergency and Breakdown works etc., for Wagon Tippler I,II and III from the date of issue of LOI to 30.09.2026.
Providing of patch repairs and carrying out of belt jointing works
Supply of HP Lube oil filter elements set for APH's
Laying of CC Road From Y.Krishna House (D.No:9-105-60-2) to end of the street G.Pullaiah House (D.No;217), in Mahaboob Nagar, Ward No.18.
Improvements to loddaputti Groyne/ Channel on Bahuda river near Jagannadhapuram village in Ichapuram Mandal in Srikakulam District
Repairs in First Floor of COASTAL SECURITY POLICE Headquarters Building at VISAKHAPATNAM City(Old DPO building)-STN
Providing CC Road and Drain from K.Malathi House to Vaddadhi Achyut rao house in golla veedhi of ward no.21
Repair/Overhauling of 2100 KW, 6.6 KV, 989 RPM, 246 A, BHEL make Squirrel Cage Induction HT Motor (mill Motor) (S.NO:40063C421-41-01)
Labour charges for Servicing /Replacement of valves in Unit-1&2 of TM Division in SDSTPS for the financial year 2026-27