Loading…
Loading…
12 results • Latest
Desktops and Monitors
Upgradation of GNSS Simulator
Critical spares required for the repair of VTC 01 Opacimeter
Extention of High Pressure water Mist system for other control room and other area at ECL building, ARAI HTC Chakan,Pune.
Procurement of Hydrogen Purity Analyser
Upgradation of Steering Robo by integration of Brake and Accelerator pedal Robots along with path following capable software
Supply of calibration and operational consumables
Supply, Installation, Testing and Commissioning of Internal firefighting systems including fire detection and alarm system, fire hydrant and sprinkler system in Admin building, Security office and Pump house at ARAI MRC Takwe,Pune.
Replacement of busduct power source with LT cables infrastructure at ARAI HTC chakan pune.
Electrical Installation and Allied Work of High Power E motor Test Bed 700kW 2 Dyno Test Rig with DCPS at CoE Green Mobility ARAI HTC chakan Pune.
CIVIL AND ALLIED WORK FOR EV 4-WHEELER DYNO and CLIMETIC CHEMBER AT ARAI AEC (AUTOMOTIVE ELECTRONICS CENTRE), PLOT NO 22/2, CHAKAN INDUSTRIAL AREA, MIDC PH II, KHALUMBRE, TALUKA KHED, PUNE 410501 .
Procurement of GNSS Simulator suitable for GNSS tolling