Loading…
Loading…
5,112 results • Latest
Transportation of belt structure,resistance boxes and miscallaneous items in Moonidih Collery,W.J.Area
Complete Rewinding of 01No. 550/440V, 100KVA Transformer Sl. No. T/C-05TR at New Quarters Colony and 01No. 550/220V, 25KVA EMEI make Transformer Sl. No. KT20/69 at Marwari Kothi of Tetturya Colliery under Govindpur Area-III
Complete rewinding of 315KVA 3.3KV/550V Transwitch unit make MINE LINE Si.No 0497 of ABG Colliery under Govindpur Area
Repairing and Overhauling of 11KV, 400A Andrew Yule make VCB, Sl. No. 3177 Outgoing switch for KM Sub-station at Bilbera Switch Station under Govindpur Area-III
Complete repairing of 11KV,800AMP,CTB-100/50/515 maker CSPL having SI.NoMHP/VOD/09 ACB at Maheshpur colliery under Govindpur Area
Repairing of YASKAWA make, DOL Starter ,SI.No507556-007 required for pumping at Block-IV OCP
Complete rewinding of 15HP 550V 720 RPM motor brought from Jogidih colliery.
Complete repairing of 200A ACB, MINELINE make, CTR-200/5, sl. no.- MHP/ACB-11, controlling of 150HP pump.
Transportation and laying fitting 60lb track line at D19 in XVI(T ) Moonidih Colliery, W J Area
Cleaning travelling roadway 400MH, drain and remove old material from 400 MH Moonidih Colliery, W J Are
Dressing along 8dip to 5 dip 400 main line and cleaning various places D19 XVI(T )and 4dip of XVI bottom seam Moonidih Colliery, W J Area
Work of Repairing and Maintenance of Electrical wiring of 18 Nos. of B II Type quarters at Koyla Nagar township
Work of Electrical wiring and renovation of MSDI 4 and Primary School at Karmatand Township as per scope of BOQ.
Repairing of 400 Amps 11KV grade Biecco make OCB installed at 4 No. Sub-station of ABG Colliery under Govindpur Area
Complete Rewinding/Repairing of 100 KVA, 11KV/440Volts(Al) Transformer Sl. No. SVM/TR/100KVA/01 installed at SVM School under Bilbera Switch Station of Govindpur
Repairing of 3.3 KV Grade, Mine Line make, 400 Amp., FLP Type, VCB, Sl. No. - 920 at Salanpur OCP in NAKC.
Maintenance and Overhauling of 01No. 500KVA, 6.6KV/440V GEC Make Transformer, Sl. No. 4001965 installed at Dharmabandh Colliery and Making Interlocking Arrangement of 02Nos. VCB at SLG Siding under Govindpur Area-III
Complete Repairing of Starter panel of Cloud Tech make Fog Cannon machine Sl. No. 4110037 at SLG Siding under Govindpur Area-III
Complete Rewinding/Repairing of 100 KVA, 6.6KV/440Volts, Transformers and Electricals make Transformer, Sl. No. 16871 installed at Tetturya Colliery under Govindpur Area-III
Dismantling of overhead line and cable mounting of cable of Feeder 22, 6.6KV, 3 Line for pumping purpose at Hired Patch H and cable mounting and straight through jointing in F-22, 6.6KV near railway line culvert of New Akashkinaree colliery of Govind
Repairing of 3.3 KV, FLP, DOL Type, Sait mine line make, Sl. No. - SA733 for 2nd OCP Pump in NAKC
Erection of 3.3 KV O/H line from Kali Mandir Sub-station to Pumping Statio of Hired Patch-C and Dismantling and Erection of 11KV O/H Line for clearing working area of Proposed Patch-C of ABG Colliery under Govindpur Area
Repairing and overhauling of 800 A salt Electronica colkatta make NFLP type. ACB switch 440V, SI.No- M/LTP/054 of Nudkurkee feeder breaker No-3 under ABOCP Mine
Repairing and maintenance of LT and associated HT O/H line of KKC main siding Benidih and Nudkhurkee coal dump etc under ABOCP mine under Block-II Area
Repairing and maintenance of O/H line feeder No-(4) service connection associated with Railway Siding and kessurgarh F/B and kessurgarh weighbridge etc ABOCP Mine under Block-ll Area
Repairing of vehicle No. BHG-6443 (TATA 1210 SE) at Transport section under ABOCP mine, Block-II Area
Repairing of Vehicle UP16CT4689 at Transport Section ABOCP Mine under Block-II Area
Diesel Bousher (UP16CT4690) of repairing and replacement spare at Tipper section RRWS under Block-II Area
Repairing and rewinding Motor 160KM, make Kirloskar 440V, 3 phase induction motor Sl. No. 29405125-1 of Feeder Breaker Kessurgarh at ABOCP Mine under Block-II Area
Complete repairing and fitting of pump of Make Mather and Platt, 6 Stage, PV-II, 180m head, 600 GPM, Sl. No. NAKC/Pump/PVII/02 of UG mine of 2-Seam of New Akashkinaree Colliery of Govindpur Area.
Installation of Green Net Wind Barrier with Bamboo Fencing
Complete rewinding and repairing of 100KVA Transformer 550V/440V for domestic power supply of 56 unit Quarters under ABGC
Construction / maintenance of buildings
Repairing/ rewinding of ATS controlling of submersible pump running at Budda Baba mandir under ABG Colliery.
Daily maintenance of belt conveyors 1200mm in underground from Long wall Face to main bunker at Moonidih colliery, WJ Area.
WTI,OTI and buchhoz trippling circuit making and installation for both power transformer
Rep of 6.6 KV Grade, 600 Amp, OCB, Biecco Lawrie make Switch, Sl. No. - PB4/18893 installed at CISF Camp, NAKC
Transportation from surface to D19 BG 9th dip NG Sleeper, 60lb track line XVI top seam. Moonidih Colliery, W J Area
Rewinding of 150HP ,550V ,1485 RPM motor for domestic water supply in Hadhadiya (stand by) pumping station under NAKC
Complete repairing of electrotechnica make SI.No1164 ,315KVA,3.3KV/550V TSU for the power supply to Haulage U/G at Maheshpur colliery under Govindpur Area
Complete repairing of 11KV,400A, Switch Gear ECE make SN-ABGC/HT/SWCH/10 at K.M. sub-station at ABGC under Govindpur Area.
Complete repairing of 400 Amp, 11KV GEC make OCB, Sl. No.- MHP/OCB/04 at Maheshpur Colliery under Govindpur Area.
Finishing Work in 2 No. Community Centre of Begunia under C.V. Area
Complete repairing of 250Amp, 550V, MMV fan, star delta starter sl. no.- 07042/FW at Maheshpur Colliery under Govindpur Area.
Upkeepment of spilled materials from Tail end side of unit no. 301 belt conveyor, deck plates, gallery, return rollers etc. at Madhuban Coal Washery under Block-II Area, BCCL
Upkeepment of materials i.e slurry debris etc. from fresh water pond behind PS-9 building at Madhuban Coal Washery under Block-II Area, BCCL
Upkeepment of spilled materials from deduster floor of PS-9 building at Madhuban Coal Washery under Block-II Area, BCCL .
Upkeepemnt of firefighting pond near PS-5 building by removing Slurry debris in Madhuban Coal Washery unde Block-II Area, BCCL.
Upkeepment of spilled materials from unit no. 953 belt conveyor floor of PS-9 building at Madhuban Coal Washery under Block-II Area, BCCL .
Work Complete rewinding and repairing of power transformer 500KVA/6.6KV/440V-550V Century Transformers Pvt. Ltd. Sl. No. 576/14-15 at AMPL Feeder Breaker under ABOCP Mine, Block-II Area