Carrying out in-house routine tests of ambient air, flue gas emission, noise and other environment parameters on regular basis.
Major Overhauling of De-aerators of TPP, CPP Turbines and TG 9.
Refurbishment of KSB Make BFP Shafts.
Replacement of BF Gas Line Gate Valve No. 350 of TPP Boilers
Replacement of Girth Gears and Liners of Ball Mills of TPP Boilers
Upkeeping and Removal of Technological Waste from Ball/Bowl Mills and Various Floors/Platforms of TPP, CPP and Unit #-9 Boiler Areas, Including Cleaning of Roofs of Boiler, Turbine, Screw Conveyor of TPP an CPP and Various Buildings of the PowerPlant
Oil Analysis of Critical Equipment for Condition Monitoring
Replacement of Diamond Gratings in TPP Boilers
Testing and Certification of equipments for fulfilling statutory requirements under section 28,29 and 31 of Factories Act, 1948 and relevant rules of Jharkhand Factory Rule 1950.
Maintenance of Illumination System of ARS, Technical Cell Stores and Cable Galleries, along with Maintenance of Pump-Motors and Socket Supply System of Cable Galleries
Repair of Pulverized Fuel Path of CPP Boilers
Annual Maintenance Contract of Control and Instrumentation Systems and Equipments of CPP Units (Unit 6, 7 and 8).
Annual Maintenance Contract (AMC) for Condition Monitoring of Equipment at BPSCL
RLA for Pressure Parts of Boiler - 5
Maintenance of Cables of TGs, WCTPs, DPHs and RCPH of Power Plant, BPSCL.
Maintenance of Cable Basements of Ball Mills FD Fans ID Fans and Cable Tunnels to ID and FD Fans of TPP and CPP
Hi-Chrome Grinding Media balls for Ball Mills of Boiler # 9
Inspection and maintenance of injection system, Dosing System of WCTP-TPP and DM water pumps of Boiler-9
Maintenance of High-Pressure Pipelines, Valves and HP Heaters.
Re-tubing of Condenser Tubes of TG # 6
Assistance in coal feeding by segregating different types of foreign materials from grills and conveyors in CHP.
Replacement of Vertical Feed Gate Housing Assembly and Clinker Grinder Assembly for CPP Boilers (6,7 and 8).
Annual Maintenance of Cooling Towers of RCPH and Unit 9.
Assistance in Operational activities of TPP Turbine.
Oxygen Analyzer for Flue Gas Monitoring
Assistance in Material Handling at Main Store of BPSCL.
Oxygen mapping in Flue gas path.
Design, Engineering, Manufacturing, Supply, Erection, Testing and Commissioning of 11.5 kV Bus Duct and Bus Bar for Unit Auxiliary Transformer TU-8 (10 MVA, 11.5 kV / 6.9 kV)
Capital Repair of Boiler Feed Pumps of TPP and CPP Turbine.
Procurement of Electrical Spares for ESP
Engagement of a consultant towards acquiring NABL Accreditation for 01 no. of Chemical Laboratory according to ISO/IEC 17025 2017 in BPSCL plant.
Rate Contract for RCC, PCC, and Masonry Works in Structures, Floors, Walls, Roofs, and Pavements, etc.
On-line pH, Conductivity and Dual Input Contacting Conductivity Analyzers
Procurement of HYDRANAL TM_Coulomat oil Anolyte chemical reagents for Karl Fischer moisture analyser instrument
Calibration Service for Chemical Lab Testing Instruments at Laboratory/WCTP
Shoulder coupling, its rubber gaskets and grooved shoulder fittings for coal dust pipes of boiler 9
Supply, O and M and Monitoring of ClO2 dosing system on Rental Basis.
Assistance in Material handling in Planning Cell
Rate Contract for Technological Painting of Various Steel Structures and Pipelines
Spares of ash slurry pump, drain sump pump , seal water pump of Boiler 9 and dredge pump of TPP and CPP boiler
Gasket for Trunnion Seal of Ball Mill BBD 3448 of Boiler 9
HP Dosing and LP Dosing pumps and its spares
One Set of High Chrome Liner for Ball Mill of TPP Boilers
ESP spares for TPP Boilers
Fabrication and Erection of Cable Support Structure for Cable Tunnel of RCPH
Operation and Maintenance of 2.0 MW Solar Plant
Outsourcing of Job of TDS and TCS computation, preparation of Form- 16 and 16A, Filing of e-TDS/TCS return of employees and contractors for FY 2026-27 and 2027-28.
Rate Contract for Replacement of Damaged CGI and Asbestos Roofing Sheets with Galvalume-CGI Sheets, Including Allied Works
Annual Overhauling of Pressure Filters of WCTP - TPP
Phased Array Ultrasonic Testing (PAUT) of boiler tube welding joints and oxide scale measurement of boiler tubes