Loading…
Loading…
113 results • Latest
Maintenance of BF and CO Gas Line along with their equipment of TPP, CPP Boilers and Boiler-9
Inspection, Testing and Issuance of Stability Certificate of various buildings and Structure of Power Plant
Outsourcing of office assistance jobs in F and A Department
Fabrication of Protection Strips and U-Loops for Economizer Coils of TPP Boilers
Capital Repair of Russian make Boiler Feed Pumps of TPP Turbine.
Retrofitting of RCC Clarifier Tank by Pressure Grouting and Jacket Concreting in WCTP
Annual Maintenance Contract (AMC) for Telphers, I-Beams, and associated Chain Pulley Blocks in the TPP-CPP area
Assistance in Isolation and Charging of Equipments for Maintenance in TPP Turbine
Electrical Insulating floor painting for switchgear rooms
Annual Maintenance and Operation of ESP, Ash Handling System and Dredge Pump House (Dredge Pump House - 1) of TPP Boilers.
Maintenance of Air Conditioners installed in BPSCL
Base Exchangers for WCTP-TPP
Preparatory and Assisting Jobs for RLA Study of Steam Pipelines (100 ata, 39 ata and Kindling Headers) along with other high-pressure line related job.