| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Finance | ₹8.5 L | L1 | Admitted-Finance |
| 2 | L2₹9.1 L+₹62,531.98 (7.39%)Admitted-Finance | ₹9.1 L+₹62,531.98 (7.39%) | L2 | Admitted-Finance |
| 3 | L3₹9.4 L+₹90,958.08 (10.8%)Admitted-Finance | ₹9.4 L+₹90,958.08 (10.8%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S GOPAL BROTHERS L2 | M.D. ESTHAPPAN L3 | G.R.ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00Description of Work | ||||||
| 1.01 | Assistance in different in-situ tests related to RLA study of 100 ata., 39 ata. Steam pipelines (headers), kindling collector and their associated steam pipelines by providing manpower support.
(As per scope of work & terms and conditions) | 1 | Lot | 4,63,236.73 ₹4,63,236.73 | 4,77,133.83 ₹4,77,133.83 | 4,30,810.15 ₹4,30,810.15 Lowest |
| 1.02 | Repairing / replacement of defective stub joints / HP
joints / T-joints / valve joints etc. found during RLA study of 100 ata, 39 ata, steam pipelines (headers), and their associated steam pipelines.
(As per scope of work & terms & conditions) | 20 | Joints | 10,110.32 ₹2,02,206.4 | 10,413.62 ₹2,08,272.4 | 9,402.6 ₹1,88,052 Lowest |
| 1.03 | Replacement of drain lines, by pass line of stop valves along with their drain valves and by pass valves of 100 ata., 39 ata. Steam pipelines, kindling collector etc. and their associated steam pipelines.
(As per scope of work & terms and conditions) | 300 | Joints | 810 ₹2,43,000 | 838.21 ₹2,51,463 | 756.83 ₹2,27,049 Lowest |
Tender Value
₹9.1 L
Closing Date
3 Apr 2026, 11:00 amClosed
Manager MM
BPSCL MM ADM BUILDING, B S CITY
Preparatory and Assisting Jobs for RLA Study of Steam Pipelines (100 ata, 39 ata and Kindling Headers) along with other high-pressure line related job.
2026_BPSCL_272263_1
25-26/C-178/LTE-049
Limited
Miscellaneous Services
Item Rate
365 days
POWER PLANT BPSCL SITE, B S CITY
2 documents required · 2 mandatory
₹0
Exempted
6 May 2026
20 Mar 2026
4 Apr 2026
20 Mar 2026
3 Apr 2026
20 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Description of Work | |||||
| 1.01 | Assistance in different in-situ tests related to RLA study of 100 ata., 39 ata. Steam pipelines (headers), kindling collector and their associated steam pipelines by providing manpower support.
(As per scope of work & terms and conditions) | - | Lot | - | - |
| 1.02 | Repairing / replacement of defective stub joints / HP
joints / T-joints / valve joints etc. found during RLA study of 100 ata, 39 ata, steam pipelines (headers), and their associated steam pipelines.
(As per scope of work & terms & conditions) | - | Joints | - | - |
| 1.03 | Replacement of drain lines, by pass line of stop valves along with their drain valves and by pass valves of 100 ata., 39 ata. Steam pipelines, kindling collector etc. and their associated steam pipelines.
(As per scope of work & terms and conditions) | - | Joints | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
TenderDocuments2526C178LTE049.pdf
Tender Documents • 0.35 MB
BOQ_317664.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .