Loading…
Loading…
96 results • Latest
Calibration of Environment Parameters Monitoring Instruments.
Rate Contract for Evacuation and Transportation of Pond Ash for backfilling of low lying areas.
AMC of CW Pumps of RCPH and Pump House 1 of Unit 9.
Assistance for Maintenance and Repair of Electrical Equipment belonging to TPP Boiler
Assistance in Isolation and Charging of CPP Turbine Equipment for Maintenance Purposes
Complete Cleaning, Descaling and Hydraulic Testing of Coolers
Annual Maintenance Contract of Control and Instrumentation Systems and Equipments of TPP Units.
Supply, Dismantling, Installation and Commissioning of Air Washer - Unit 9
Consultancy Services for Installation of a New Gas-Fired Boiler and TG of Suitable Capacity at BPSCL
Operation of EOT cranes in TPP and CPP.
Assistance in Jobs of Electrical Planning Section and Collection, Loading, Un-loading and Transportation of HT Motors and its Spares between Different Locations of BPSCL and to Various Units of BSL.
Maintenance of BF and CO Gas Line along with their equipment of TPP, CPP Boilers and Boiler-9
Inspection, Testing and Issuance of Stability Certificate of various buildings and Structure of Power Plant
Outsourcing of office assistance jobs in F and A Department
Fabrication of Protection Strips and U-Loops for Economizer Coils of TPP Boilers
Capital Repair of Russian make Boiler Feed Pumps of TPP Turbine.
Retrofitting of RCC Clarifier Tank by Pressure Grouting and Jacket Concreting in WCTP
Annual Maintenance Contract (AMC) for Telphers, I-Beams, and associated Chain Pulley Blocks in the TPP-CPP area
Assistance in Isolation and Charging of Equipments for Maintenance in TPP Turbine
Electrical Insulating floor painting for switchgear rooms
Annual Maintenance and Operation of ESP, Ash Handling System and Dredge Pump House (Dredge Pump House - 1) of TPP Boilers.
Maintenance of Air Conditioners installed in BPSCL
Base Exchangers for WCTP-TPP
Preparatory and Assisting Jobs for RLA Study of Steam Pipelines (100 ata, 39 ata and Kindling Headers) along with other high-pressure line related job.
Pressure Gunniting and Allied Works in Roofs, Foundations and Floors of the Power Plant.
Loading Unloading and transferring of bulk Chemicals from BSL stores to WCTP BPSCL.
Maintenance of Thermal Insulation and Aluminium Cladding of Boilers and Turbine in TPP, CPP and Unit 9
Construction of RCC Retaining wall along the Railway Track for manual Unloading of coal from Wagons.
Assistance in Coupling of Brake Pipes of Coal Rakes after Unloading
Shifting of H2 and CO2 Cylinders up to TG-2 and TG-3 including Maintenance of its Storage Godown and Surrounding Areas.
Replacement of Ash Slurry pipe lines.
Procurement of flexible pure graphite compressed and moulded gland rings for high pressure valves of turbine
Comprehensive Medical Check up of Contractual Workers of BPSCL
Assistance in Operation of weighbridges in BPSCL
Physical Verification of Stock of Stores and Spares.
Assistance in CPP Turbine Operation
Fixing of New Fencing in Switchyard and Transformer yard
Supply, Installation, Testing and Commissioning of LED Aviation Obstruction Lights for Chimney of Unit 9.
Instrumentation jobs during Capital Repair of Two (02) Nos. of Boilers.
Spare parts of Vibration Monitoring System (VMS)
Industrial Safety Shoe.
Replacement of Precast Slabs in Conveyor Galleries 1A, 1B, 11 and 12 of the CHP.
Capital Repair of TPP Boiler Two (02) Units
Laying, Jointing and End Termination of HT LT Power Cables
Spares for Auma Make Actuators
APH Block Tubular Type Heating Elements.