Supply and Installation of Modern Scientific and Electronic Instruments for Operation of Telengiri Dam including security surveillance system
Raising, strengthening and construction of toe wall left bank of Kotpad Distributary from RD 17.200km to 17.400km.
Repair of Lining from RD 7.575km to 7.695km of Kotpad Distributary.
Improvement to service road from RD 00km to 2.00km of Kumahandi minor, Ekamba Minor and Ambabali Minor.
Repair and painting of 2 Nos of VRB at RD 4.50km and 5.10 km of Pakhanaguda Disty.
Improvement of service road from RD 00km to 2.00km of Damayanti minor
Improvement to service road from RD 3.00 km to 6.00 km of Sasahandi minor
Renovation to fall No.1 at RD 4.627km and fall No.2 of RD 6.057km of Sindhigaon Distributary.
Renovation of CD No.31 at RD 20.503km including its slope protection work of Bagdary Distributary.
Construction of lining from RD 0.030km to 0.300km of Gadigaon S/M-III.
Renovation of canal from RD 21.500km to 24.300km and construction of canal lining near U/S of Koilary Aquiduct,CD No.25 at RD 22.851km and CD No.26 at RD 23.373km of Pakhanaguda Disty.
Renovation to U/S wing wall and return wall of CD No 37 including construction of toe wall on right bank of JMC at RD 28.290 km.
Raising strengtening and desilting of semila minor from RD 4.00 km to 7.00 km.(Working RD raising and strengthening of right bank from RD 2.040km to RD 2.500km including refixing of outlet (8R) at RD 2.080km).
Renovation of canal from RD 3.600km to 4.000km of Semila minor. .(Working RD raising and strengthening of right bank from RD 3.500 km to 4.170km including refixing of outlet (15R) at RD 4.170km).
Renovation of canal from RD 00km to 2.500km of Nuagaon sub-minor -II.
Renovation of Fall and both bank strengthening of Kumahandi Minor.
Renovation of canal from RD 2.500km to 3.500km of Semila minor. .(Working RD raising and strengthening of right bank from RD 2.500 km to 3.500km including refixing of outlet (10R) at RD 2.649km).
Renovation of Semila minor from RD 2.00 km to 4.00 km.(Working RD raising and strengthening of right bank from RD 1.385 km to 2.500km and outlet refixing (6R) at RD 1.410km).
Renovation of CD No.2 at RD 0.450km and providing protection to scoured bank within RD0.00km to 0.600km of Kandiput sub-Minor (R).
Construction of link drain,foot bridge and improvement to non service road from RD 0.05km to RD 0.300km of Pakhanaguda disty.
Construction of cattle passage at RD 0.500 km of Bastamba Sub minor II .
Construction of cattle passage of Ambabali Distributary at RD 5.310 Km
Construction of cattle crossing at RD 16.500KM of Kotpad Disty.
Construction of cattle passage at RD 0.850 km of Sindhigaon Disty.
Construction of cattle passage at RD 1.820 km of Khadapa minor I.
Construction of cattle crossing at RD 20.200 km of Kotpad Disty.
Construction of VRB at RD 1.205 km of Bedapausi minor.
Construction of cattle crossing at RD 0.500KM of Kanjiguda Disty.
Construction of 2 nos cattle crossing at RD 13.00 km and 18.00KM of Kotpad Disty.
Construction of cattle crossing at RD 8.500KM of Kotpad Disty.
Construction of cattle passage at RD 2.800 km of Kanjiguda Disty.
Construction of VRB at RD 12.925 km and extension of VRB at RD 16.700 of Kotpad Disty.
Repair of fall and construction of protection wall from RD 5.000 km to 5.500 km of Karlahandi Disty.
Raising and strengthening both bank side and construction protection wall in different patches from RD 2.00 to 3.00 km of Panchia minor.
Renovation of canal from RD 1.000km to 2.500km of Nuagaon sub-minor -I.
Repair 3 nos falls at RD 7.909 km, 7.982km and 8.169km of Kotpad Disty.
Providing protection wall and construction of Bathing ghat at RD 54.750 km non-service bank near village Dangariguda of JMC.
Raising, strengthening of bank from RD 4.00 km to 5.00 km of Karlahandi Distributary.
Renovation of Pakhanagudaa disty. Within RD 24.600km to 27.050km including outlet repair.
Construction of protection structure at left flank downstream of spillway of Telengiri Dam
Improvement to service road, repair of VRB at RD 176 m of Jayanagar Minor of Jeypore Main Canal under Upper Kolab Project.
Development of proposed garden at Satiguda Dam including concrete drains, laying of floor tiles Over walkway paths, providing steel hand railsat the steps
Improvement to service from RD 00 km to 3.350 km of road Sanakaudi minor of Jeypore 8.89 Calendar Main Canal under Upper Kolab Project
Painting to Parapet at Top and piers of Spillway of UK Dam
Renovation of service road of Padmapur Distributary from RD 8.850 Km to RD 9.20 Km and RD 11.70 Km to RD 12.66 Km
Removal of weeds, anti-termite treatments to Garden No. I to V development to Garden I on right flank of Upper Kolab Dam, Kolabnagar
Construction of paved roadways to Picnic spot, repair of pathways, platforms and renovation of grass beds of Garden II (Left flank) of U.K. Dam
Fixing chain link mesh over the parapet wall for fencing of reservoir area between RD 00 m to RD 800 m of Satiguda Dam and Sub-Division office area
Repair and renovation of roof and drain of E type and F type Qtrs at Kolabnagar colony
Renovation to waterway at Garden No. II and III at right flank of U.K. Dam