Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
382 results • Latest
Construction of trough wall in between RD-0.00km to 0.500km of Sasahandi Minor.
Renovation of fall No.3 at RD 4.650km and fall No.4 at RD 4.822km and protection to scoured bank including outlet repair of Dharanahandi Disty.
Repair of CD No.12 at RD 11.831km, CD No.15 at RD 13.553km construction of canal lining including repair of outlet and protection to scoured bank of Pakhanaguda Disty.
Renovation of CD No.2 (P.C.S) of sargiguda S/M-1 including repair of outlet.
Protection to scoured bank at 4.680km and construction of canal lining near CD No.2 at RD 1.483km of Batasana Disty.
Construction of VRB at RD 3.350 km of Telia Minor including its slope protection works.
Repair of 3 Nos outlets (46L,47L and 48R) at RD 36.50km, 36.933km, 36.932km,bathing ghat and construction of guard wall in right bank at RD 37.70km of JMC.
Repair of two Nos outlets (63L and 65L) and construction of guard wall both U/S and D/S of head wall of outlet at RD-46.16km and RD-46.685km of JMC.
Construction of guard wall and Toe wall including outlet repair ( 67 L ) and raising of existing guard wall near VRB at RD-47.70km of JMC.
Resectioning to service bank and construction of bathing ghat at RD-41.60km of JMC.
Renovation of CD No-3 at RD 1.715 km and protection to scoured bank of Miriguda S/M including outlet repair.
Renovation of CD No2 at RD 0.390km and protection to scoured bank and strengthening of both bank from RD 0.600km to 0.750km of Kandiput Sub-Minor(L) including repair of CD No-3 at RD 0.675km and CD No-1 at RD 0.090km.
Renovation of fall No-1 at RD 4.380km and fall No-2 at RD 4.480km and protection to scoured bank including outlet repair and desilting of Dharanahandi Disty.
Repair of CD No-3 and CD No-4 including outlet repair and protection to scoured bank of Kupia minor.
Construction of Protection wall on both banks near CD No 1 from RD 0.500 km to 0.840 km of Kusumi Sub Minor II.
Construction of trough wall from RD 0.700Km to 0.800Km of Ambabali Distributary including desalting,jungle clearing and bank strengthening from RD 3.00 km to 6.00Km.
Renovation of CD No 3 and repair to CD No 1 of Kanga Sub Minor.
Raising , strengtening of both bank and construction of protection wall of Chitagaon minor from RD 2.500 km to 3.200 km.
Raising , strengtening and construction of protection wall of Sankarda Disty from RD 13.000 km to 15.000 km(working RD 13.100 km to RD 13.267 km).
Protection to left bank of Khadapa Minor from RD 100 to 130m including raising and strengthening from fall No 3 at RD 313m to 600m .
Protection to both the scoured banks from RD 0.700km to 0.815km, renovation to 1.50m Fall at RD 0.105km including desilting and providing trough wall of Bedapaunsi SM-II.
Renovation to 03 Nos of falls within RD 0.180km to 0.455km and construction of trough in between RD 0.530km to 0.650km of Sargiguda Minor-I.
Providing guard wall at RD 11.450km and 16.090km and strengthening of banks of Bagdary distributary.
Construction of lining near CD No-52 at RD 42.23 km, CD No-57 at RD 47.089km and guard wall near outlet No-48R at RD 36.933 km, RD 38.630 km of JMC.
Protection to both scoured banks within RD 1.310km to 1.390km including construction of toe wall and repair of fall cum V.R.B of Ghatarla Sub Minor-I
Construction of Protection wall ,from RD-39.320 km to 39.350km and repair of head wall of Makaput HR offtaking from JMC at RD-39.330km.
Improvement to service road from RD 0.00km to 3.000km of Sasahandi Minor.
Improvement to Service road from RD 00 to 1.500Km including protection to scoured bank of Hadapa Sub Minor(working RD 0.00km to 0.800km)
Improvement to Service road from RD 00 km to 0.450km of Dharanahandi Minor(Working RD 00 km to 0.500 km)
Construction of cattle crossing at RD 2.021km and renovation to outlet at RD-2.001km of Bagdary Distributary.
Construction of VRB at RD 0.800km including protection work of Mohantiput Minor.
Improvement to Service roads from RD 00 to 438m on right bank of Kusumi Sub Minor-I and on left bank from RD 00 to 500M of Kusumi Sub Minor- II including its slope protection woks.
Repair and painting of VRB at RD-41.779 km of JMC.
Construction of VRB at RD-7.50km of Pakhanaguda Disty.
Construction of VRB at RD 0.500Km of Hadia Sub Minor-II including its slope protection works.
Construction of VRB at RD 1.380Km of Hadapa Sub Minor.
Raising and Strengthening both bank side and construction protection wall in different patches from RD 2.00km to 3.00 km of Pachia Minor.
Repair of CD No 4 at RD 1.375 km and CD No 2 at RD 0.880 km, repair of HR, outlet and providing protection wall to scoured bank of Lamtaguda Sub mionr.
Renovation of canal from RD 1.960 km to 2.040 km of Semila minor.
Renovation of canal from RD 2.970 km to 3.038 km of Karlahandi Disty.
Renovation of canal from RD 1.130 km to 1.230 km of Nuagaon Sub minor I.
Renovation of canal from RD 3.150 km to RD 3.218 km of Karlahandi Disty.
Improvement to approach road to Watch Tower near substation at U.K.Dam
Plastering to exposed masonry surface at upstream surface at right flank of Upper Kolab Dam at Kolabnagar
Renovation to abutment and pier of VRB at RD 1.70 Km of Ghatgumar Kolabnagar road
Renovation to boundary fencing from Main gate to Dam top at right flank of UK Dam
Renovation to CD and drain at entrance of Gallery road of Upper Kolab Dam at Kolabnagar
Protection work to prevent from Land Sliding in D/S of service bank near Ranaspur Village from RD 9600 mtr. To 9980 mtr. Of TMC.
Deployment of security personnel at Telengiri Dam, at Spillway and Dam and its surrounding under Telengiri Canal Division, Ambaguda for the period of 01 Year
Providing beautification of dam area and other miscellaneous works at Telengiri Dam Site