Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
382 results • Latest
Deployment of security personnel at spillway, dam and its surroundings under Telengiri Head Works Division, Ambaguda for the year 2021-22
Construction of compound wall for Devipitha in R. and R. Colony No. VIII of T.M.I.P. at Biriphulgumma
Providing piped water supply system with sinking and installation of bore well and construction of pump house and O.G.R. in R. and R. Colony No. VIII of T.M.I.P. at Biriphulgumma
Construction of one No. E type and two Nos. of F type quarters at Dam site of T.M.I.P.
Renovation of structures, canal section and protection work at patches to Katariput Sub-Minor off taking at RD 0.658 Km of JMC
Repair of left side service road from RD 0.00 Km to 2.907 Km of Dhanpur Branch canal and 2.250 Km to 3.100Km of JMC
Improvement of Service road from 100mtr to 540 mtr of JMC
Renovation of canal slopes and construction of guard wall from RD 13.44 to 13.46 Km and 17.04 to 17.09 Km of right and 16.69 to 17.01 Km of left slope of JMC
Supplying and laying of 120 sq mm 4.00 core armoured cable with other fittings from LT line near Childrens park to spillway to Upper Kolab Dam
Construction to left side protection wall from RD 13350 m to 13540 m of Dhanpur Distributary
Restoration to 5 nos 1M fall at RD 0.75m, 762m, 852m, 972m,1032m of Tragei minor including protection work to the vulnerable reaches
Protection work from RD 30m to RD 120m of Badaujei S/M-I
Renovation of canal slope and construction of guard wall from RD 14.2 to 14.22 Km and 15.79 to 15.81 Km of right side of JMC
Renovation of canal section with supporting toe wall from RD 11.2 to11.38 Km of right bank of JMC
Construction of concrete cable tray and laying of paver blocks at the road side between RD 800M to 1080M of Satiguda Dam UKP
Deployment of Security Personal at UK Dam and its surrounding at Kolab Nagar for the year 2021 22
Raising and strengthening both bank side and construction guard wall in different patches from RD 00Km to 2.00Km of Panchia Minor
Renovation to trough wall at fall No1 at RD 0.225Km,provision of trough wall from RD 2.06Km to 2.16Km and raising and strengthening of bank of Telia Minor
Repair of 3nos outlet 50L 58L 62L at Rd38.80Km 44.18Km 46,17Km(working outlet 2 nos) construction of bathing ghat and guard wall at RD 46.200Km of JMC
Construction of toe wall at country side non service bank U/S of CD no 62 and a bathing ghat at RD 50.40Km of JMC.
Repair of guard wall and construction of CC drain adjacent to Guard wall near Down Stream of CR Cum Escape at RD 35.800 Km of JMC.
Raising and strengthening bank and desilting of Antigaon Minor I from RD 00 to 2.070 Km, Antigaon Minor II from RD 00 to 2.35 Km and Naikera Minor RD 00 to 1.846 Km.
Renovation, jungle clearance and desilting, raising and strengthening of Temeraguda SM I and II and Khadagpur SM I and II including repair of their HR gates.
Repair of CD No 1 and desilting within RD 0.000Km to 1.200 Km including lining and outlet repair of Hadapa Sub Minor.
Repair of CD No. 2 and CD No 5 and desilting within RD 0.00 Km to 2.500 Km including HR and outlet repair of Haridaput Sub Minor
Renovation to parapet of foot Bridge at RD 4.310Km of Bagdary Disty, providing lining at CD No 3 and 5 and renovation to wing wall and return wall of CD No5 of Khadapa Minor I .
Construction of VRB at RD 15.850 Km and providing protection wall at scoured bank of PakhangudaDisty
Construction of Fall No I at RD0.030 Km, providing Trough wall in between RD 00 to 0.45 Km and bank filling in between RD 0.100 Km to 0.600 Km of UmerapandiSubMinor.
Renovation of CD No.4,5,and 6 at RD 2.48 Km, 3.10 Km, 3.320 Km ( working CD No.8 at RD 4.970 Km) and repair of lining, desilting, bank raising in between RD 2.50 Km to 5.500 Km of Mohantyput Minor
Renovation of CD No 7 at RD 4.850 Km, desilting the canal bed and jungle clearance in between RD 4.850Km to 6.850Km of Makaput Minor.
Construction of Canal syphon No.4, Renovation to CD No.3, desilting from RD 2.130 Km to 3.315Km, bank filling in between RD 1.500 Km to 2.900 Km of Kanga Sub Minor I
Improvement to service road from RD 00 to 2.00km of KarlahandiDisty.
Construction of cattle passage at RD 2.040Km of Batasana Minor-III.
Construction of cattle passage at RD 10.200Km of KotpadDisty. (Working RD at 9.750 Km)
Improvement to service road from RD 00 to RD 2.00km of Semla Minor
Construction of Slab Culvert at RD 3.30 Km, RD 5.00 Km and bathing ghat at RD 5.80Km of Sasahandi Minor.
Construction of cattle passage at RD 0.74Km and providing protection wall at scoured bank of Kandiput SM.
Construction of cattle passage at RD 4.700Km U/S of CD No-8 of Batasana Distributary.
Renovation of Bansuli Sub-minor offtaking from kotpadDisty. (Wall lining from RD 00 to 230m and Desilting from RD 230m to 1760m)
Repair of CD No. 11 and Canal lining including outlet repair of PakhangudaDisty .
Repair of 4 nos of falls at RD 10.545Km, 10.700 Km, 10.870 Km and RD 11.280 Km of SankardaDisty .
Renovation of CD No.3 and 8 of Batasana Distributary including outlet repair.
Repair of out let and construction of guard wall of SankardaDisty at RD 7.800 Km.
Providing lining to right bank from RD 31.900 Km to 32.260 km of JMC.
Construction of toe wall including strengthening of right bank at RD 0.750 Km and wall lining (Guard wall) at RD 2.710 Km of Ambabali Disty.
Raising of right bank and construction of Protection wall from RD 1.80 Km to 2.867 Km of KanjigudaDisty .
Renovation of lining and repair of CD No.53,56,58 at RD 43.240Km, 45.980 Km and 47.915Km of JMC.
Renovation of CD No 8,9 and 10 at RD 3.397 Km, RD 4.147Km, and RD 4.417 Km of Sindhigaon Disty .
Raising widening and strengthening including providing of toe wall from RD 52.270 Km to 52.670 Km on service bank of JMC.
Raising, widening and strengthening including providing of toe wall from RD 51.170 Km to 51.470 Km on service bank of JMC.