Loading…
Loading…
515 results • Recent activity
Restoration of Sundarban Embankment Damaged facing River- Bidyadhari ( R B ) at a streach near Boldwani Sluice for length 150.00 m Mouza - Balihati , G.P. Minakhan , Block - Minakhan of Haroa Irrigation Sub-division under Basirhat Irrigation Di
Restoration to damaged Embankment for a length of 100 metre along R B of river Ichamati near Tapachar Jelepara at Ward No. 15 of Basirhat Municipality under Basirhat Irrigation Sub-Division of Basirhat Irrigation Division, District- North 24 Pargan
Remodelling of Sundarban Embankment along right Bank of river Bidyadhari for a length of 500.00 metre at Mouza Hatgachi, Block Sandeshkhali-I, P.S. Nazat, District North 24 Parganas.
Maintenance of Keorapukur Khal from ch. 500.00 m. to 6300.00 m by clearing and removing weeds, water hyacinth, solid/semi-solid compact mass and jungles etc. June 2026 to May 2027 within Kolkata Municipal Corporation, Dist. Kolkata. (2nd call )
Balance work of Special repair to 6 nos. S,1A, 2A, B, C, D type residential blocks including external painting alongwith replacement of old electrical wires within Sech Abasan complex, Sector III, SaltLake, P.S Bidhannagar South, Dist North 24 Pgs
M/R to damaged Sundarban Embankment in between ch.6.400 km and Ch.6.510 km for a length of 103.00 m (antierosion) at Mouza- Lakshmipur, facing R/B of river Hooghly under Kakdwip Irrigation Sub-Division of Kakdwip Irrigation Division