Loading…
Loading…
1,355 results • Recent activity
TTPS ES Circle Instn I Maintenance of Control Panels Junction Boxes Actuators Transmitters in plant and plant auxiliaries area pertaining to Unit II Instrumentation I for the period from 01 04 2026 Upto 31 03 2027
TTPS Operation Circle Chemical Division Moping and Cleaning works of various location at Chemical Division for the period from 01.04.2026 to 31.03.2027
TTPS Mech II BM Attending breakdown maintenance works in ID FD PA fan motor lube oil system forced lube oil system bearing cooling water system and control oil system in Unit I II III Cleaning of Zero metre area in Unit I II III ID FD PA fans and its
TTPS Operation Circle MPM I Unit I Collecting of Coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of TTPS for a period from 01.04.2026 to 31.03.2027
TTPS ES Circle EM I Complete cleaning and tightness checking to enrich the healthiness of the modules and LT HT breakers Daily checking and Recording the parameters of LT modules at LT SWGR and Daily checking and Recording the parameters of HT breake
SUPPLY ERECTION TESTING AND COMMISSIONING OF 3 TON CAPACITY EOT CRANE FOR CHLORINATION PLANT AT COOLING WATER PUMP HOUSE I INCLUDING HOIST RUNWAY GIRDER