Loading…
Loading…
1,362 results • Recent activity
TTPS Operation Circle MPM I Unit I Overhauling of Roller Journal assembly and replacement of worn out grinding roller for the period from 01.04.2026 to 31.03.2027
TTPS ES Circle EM III Maintenance of 360V UPS Batteries 220V DC Batteries 24V DC Batteries in Unit IV V 220V DC Batteries in Switchyard II and 48V DC CC Batteries in switchyard II for the period from 01 04 2026 to 31 03 2027
TTPS Mech II TM II Unit IV V Clearing the coal ash dust from the 0mtr repair bay floor Turbine 5mtr 7 5mtr 10 5 mtr floor area condenser pit sump pit cleaning work for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle Chemical Division Testing and analysis works of Express Lab II on round the clock basis for the period from 01.04.2026 to 31.03.2027
TTPS Operation Circle MPM I Unit II Collecting of Coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of TTPS for a period from 01.04.2026 to 31.03.2027
TTPS ES Circle EM I Complete preventive maintenance of LT breakers HT breakers HT panels LT panels LT Modules in 6 6 Kv Switchgear control room Generator Transformers UATs USTs SSTs floor cleaning in 6 6Kv Switchgear control room 230Kv indoor switchy